The NEW Trains are Finally Here! Trying the 4th Generation LRT-1 from Baclaran-Roosevelt Philippines

Sdílet
Vložit
  • čas přidán 6. 08. 2024
  • Good news, commuters! The brand new 4th Generation Light Rail Vehicles are finally here!
    Enjoy a smoother and quieter ride, a colder aircon, and, most importantly, a clean and comfortable ride!
    ___
    No talk, just ride.
    0:00 - Baclaran Station
    3:48 - LRT-1 4th Gen Tour
    6:36 - EDSA Station
    8:05 - Libertad Station
    9:35 - Gil Puyat (Buendia) Station
    12:15 - Quirino Station
    13:07 - Pedro Gil Station
    14:48 - Doroteo Jose Station
    15:26 - Monumento Station
    16:34 - Balintawak Station
    18:06 - Roosevelt Station
    19:38 - Tour of Roosevelt Station
    22:09 - Train Ride on 3rd Gen Train
    Filmed on July 20, 2023
    ___
    The Light Rail Manila Corporation (LRMC), private operator of LRT-1, this Thursday, July 20, deployed the first set of its fourth generation (Gen-4) trains, worth over P12.8 billion, on its main line to serve commuters.
    The deployment follows the progressive handover of the Department of Transportation (DOTr) and the Light Rail Transit Authority (LRTA) to LRMC and the capacity requirement of the system, with one new Gen-4 train set added to the main line every week until December 2023.
    Currently, there are twenty 4th Generation train sets already in the Philippines.
    The remaining 10 train sets are still expected to arrive from Mexico between November 2023 and February 2024 according to LRMC.
    The complete deployment of the 30 train sets on the main line is slated for Q4 2024, when the LRT-1 Cavite Extension Project opens.
    LRMC has conducted a series of safety checks, inspections, trial runs with minimum kilometers, and acceptance tests since the first Gen-4 train set arrived from Spain and Mexico last January, 2021.
    The new train sets were manufactured by Mitsubishi Corporation and Construcciones y Auxiliar de Ferrorcarriles (CAF) of Spain.
    Adding to the existing three generations of train sets currently running along the main line of LRT-1, each state-of-the-art 4th Generation train set has a total capacity of 1,388 passengers per trip and four light rail vehicles (LRVs) or coaches per train set.
    Measuring 106 meters in length and 2.59 meters in width, the train set has maximum design speeds of up to 70 kph.
    Already, 80 LRVs have already been delivered and passed various tests.
    The DOTr expects delivery of a total of 120 new LRVs that will form 30 train-sets at 4 LRVs per set.
    Using a longer train set will increase ridership to 300,000 daily passengers up from the existing 280,000 a day.
    The trains feature destination signs to inform passengers if they are heading north or south.
    The driver station inside features a modern design, with a monitor that shows the temperature. The new train sets are also PWD-friendly with special areas for wheelchairs.
    mb.com.ph/2023/7/20/lrt-1-run...
    _____
    For the best viewing experience, make sure to watch the videos in 4K! No vlog, no music, no talking. Just a real-life walking experience with real ambient sounds -the best way to experience a tour from home.
    Don't forget to like and subscribe to be the first to watch my future walking expeditions!
    ___
    Connect with us!
    Facebook: / tourfromhometv
    Instagram: / tourfromhometv
    TikTok: / tourfromhometv
    Website: www.tourfromhometv.com
    Email: inquiry@tourfromhometv.com
    ***************************************************
    This channel and its contents are the exclusive property of Tour From Home TV. Any unauthorized use of our content, including reposting, redistributing, inserting clips into your videos, creating reaction videos, or reuploading to a new channel, without our prior permission is a violation of copyright law.
    For business inquiries, please send us an email.
    © 2023 Tour From Home TV. All Rights Reserved.

Komentáře • 250