EP2 POOL AND BACKYARD - PLASTER CHIPPING AND MORE

Sdílet
Vložit
  • čas přidán 29. 08. 2024
  • Enjoy the destruction in EP2. The inground gunite / concrete pool is getting a 100% remodel. The interior white plaster is to be removed and replaced with Aqua Blue Pebble finish. The Quick Clean in floor cleaning system is being removed. The bond beam (the raised back wall), the coping, the waterline tile, all will be redone. All the pool equipment is to be replaced. All the concrete decking will be removed and replaced.
    This work is taking place in the Bay Area in California. The work is being performed by Pacheco Landscape & Pool Construction out of Clayton, California. We met with many swimming pool remodelers. Pacheco was not the cheapest however, we felt good about the experience and knowledge after meeting with the owner. Cris has been at the job site every day so far.
    Keywords: Pebble Tech Quartz Pebblecrete Pebble Sheen Stone Scapes Stonescapes Diamond Brite Plaster QuikClean Pentair Hayward A&A Paramount Dolphin Polaris Jandy travertine

Komentáře • 4

  • @mmotorcycles9497
    @mmotorcycles9497 Před 6 měsíci +1

    That is crazy the tear down of it. Looks like it could never look good again

    • @KensGarage1
      @KensGarage1  Před 6 měsíci

      Yeah. I kept saying that also. But stay tuned 🙂

  • @FrankWilliamson-on8qq
    @FrankWilliamson-on8qq Před 6 měsíci +1

    Are you replacing the concrete deck also?

    • @KensGarage1
      @KensGarage1  Před 6 měsíci

      Yes. Everything is being removed and replaced. Hi Frank.