Column size 9/15 with 6 Rods(16mm 4bars and 12mm 2bars with 8mm rings @6inch) and distance between two columns is 15.8feet. two rooms, each 12feet/15.8feet. Footing 6.5feet depth width 4x4, with 1feet 40mm and 2.5feet 20mm. Is this good for g+2 residential building?
Thanks a lot o was looking for this for a long time but didn't find much info. The span I have is 22 ft. Columns 9*14inches, 4 bars16mm and 2 bars 12 mm door/lintel beam is 6inches and the roof beam is 12 inches deep 16mm bars. Will it be sufficient?
Sir My newly constructed house have one of the beam of length of 5.2 m (16.5 ft) and one secondary beam is tested on it. It is 230×300mm but we used 4 no of steel bars of 16 mm at bottom and 2 nos of 16 mm + 1 no of 12 mm at top. So ll it sustain to that amount of load for longer period or developed crack??? As I see many engineers recommend more than 450 mm deep beam.
Sir, If we have four steel rods on the bottom of the beam and three steel rods in the column to tie off to how is it possible to tie the two middle rods in the beam to one middle rod in the column? I'm confused.
Can we know from you, the load bearing of our existing Residential structure, to go for further floors, at professional consultation. Then how to communicate, please. Regards.
I have one doubt , In your previous video you say As per Indian standard min depth of beam is d/16 = 19/16= 1.2 ft but you say now 1 ft is enough . how !?
SIR I HAVE 16 feet span G+1.stroy, i have provide beam ( 9 inch *12 inch ) , with 16 mm 2 bar, and 12 mm 1 bar at bottom, and 2 bar of 12 mm at top with 8mm stirrups @150mm c/c spacing, is it safe?? Also column size -(9"*15")
Your beam steel is not correct for 19 ft span... Moreover depth of beam is also very less for 19 ft... It should be minimum 19 ft... Rest of the calculation and suggestions are well.
Super explanation direct to core content
Nice lecturer🎉
Baraka lahou fikkk
Column size 9/15 with 6 Rods(16mm 4bars and 12mm 2bars with 8mm rings @6inch) and distance between two columns is 15.8feet. two rooms, each 12feet/15.8feet. Footing 6.5feet depth width 4x4, with 1feet 40mm and 2.5feet 20mm. Is this good for g+2 residential building?
Thanks a lot o was looking for this for a long time but didn't find much info.
The span I have is 22 ft.
Columns 9*14inches, 4 bars16mm and 2 bars 12 mm door/lintel beam is 6inches and the roof beam is 12 inches deep 16mm bars. Will it be sufficient?
Nice lecture,sir Explain Difference between Tie beam and plinth beam
Excellent knowledge
Good video sir..more information 👌👌👌👌
Thanks for the lesson what about if this G + 2 story with 5 ton of load
can you use 16mm diameter bars in columns and 20mm in beams?
How many crank bar we should use? I hope if u have video for framing on all type of soil
supper sir, Thank you very much
Is 12mm 5 bars, 16 mm 1 bar enough For 14 feet beam ( top 3 - 12mm, bottom 2 - 12mm and 1- 16 mm)??
Sir My newly constructed house have one of the beam of length of 5.2 m (16.5 ft) and one secondary beam is tested on it. It is 230×300mm but we used 4 no of steel bars of 16 mm at bottom and 2 nos of 16 mm + 1 no of 12 mm at top.
So ll it sustain to that amount of load for longer period or developed crack???
As I see many engineers recommend more than 450 mm deep beam.
Will you show the analysis. Formula or thumb rule for column and footing design like beam depth formula l/20 for depth.
Sir, If we have four steel rods on the bottom of the beam and three steel rods in the column to tie off to how is it possible to tie the two middle rods in the beam to one middle rod in the column? I'm confused.
1 thing missed 😊
If the size of crank bar 19 fit what is the size of carnk position. What is the is the distribution size..
It is important as well.
Can we know from you, the load bearing of our existing Residential structure, to go for further floors, at professional consultation. Then how to communicate, please. Regards.
L/20 for 19 feet span 285mm depth so safer side you have to take 230x 380
Good lecture
Thanks For Teaching Sir
What should be the height of building?
6 nos of 16mm in beam (10X12) for 20 feet span.column (12x12) 4 nos 16mm &4 nos 12mm for single room .can we build g+2?
It's possible even I'm doing my own house with four 16 mm andtwo 12 mm in one biller size is 8/10
Thank you for giving good information about construction building.
G 1 G2 G3 means what? Does it mean 1floor 2floor
Super bro
Sir is it OK to put 4 Steel rod of 16mm on top and 4 on bottom of 17.5 feet long beam
what is the thickness of footings?
Well understood
Thanks 👍❣️
If I have 24 feet span and other side is 26 feet span for G plus 1 story home only, please reply
Wow bhai....
Sir u could not say top reiforcement which mm bar used in this video
ACI code(Beam is. span× 0.75=beam depth)
What should be size of beam and column and size of steel which is 7 meters and roof size and steel size G+3
Salam sir, does this can apply to 21 ft span?
Steel volume should be 1-2% of RCC volume for beam. Calculate it
Maa shah Allah
How about if we made column size 12x12 for G+2 residential house with steel rod of four 16mm and four 12mm?
Totally safe
Waiting for response too
Can you do your future video measurements in feet and inches.?
Sir can it apply in normal residential building
good mashallah
please post a video for culvert reinforcement details and designs
Need plinth beam design
Very nice explaination but not for the poor peaple it's too much and it will be very expensive less size column beam can biuld G+2
Fine
What will be the size of footing for same building if soil bearing capacity is 70kn/m2?
It is good decision to choose deep foundation than shallow foundation if you cam to know soil is till 70kn of bearing
maximum span between columns
if the span btween 2 column is 16ft...and the building is G+1+2 than explain size of column and beam...
I have one doubt ,
In your previous video you say As per Indian standard min depth of beam is d/16 = 19/16= 1.2 ft but you say now 1 ft is enough . how !?
L/20
SIR I HAVE 16 feet span G+1.stroy, i have provide beam ( 9 inch *12 inch ) , with 16 mm 2 bar, and 12 mm 1 bar at bottom, and 2 bar of 12 mm at top with 8mm stirrups @150mm c/c spacing, is it safe?? Also column size -(9"*15")
absolutely save for G+1
Can you explain that what is column and beam size with how many steel used with size
Also length and width distance of each column
And calculate the no. Of beams for 40 by 16 feet
Pls I need picture of G+1 and G+2 story building
If column to column clear span 19', i want provide 6 nos 12mm bar in column and in beam 16mm 4nos bar, any problem plz solve it
Plz any comment
12x9'' beam isn't safe for 19-20 feet span in beam column structure. do stress analysis
Do pakistan and india have the same engineering principles for rcc construction .
Dear All over the world is same principles.
Even here in GCC countries are same principles.
@@MehrbanRana thanks .
No. Of beams used for 40 by 16 feet
I love u sar
Please answer my question
18fit distance mi kon sa colum lgta hi
36/60 what is the size of the pillar snd besm
Please hindi Language used.
Agr urdu mai lecture daitai to aor acha hota......
We are watching a religious programe . Inshallah
Your beam steel is not correct for 19 ft span... Moreover depth of beam is also very less for 19 ft... It should be minimum 19 ft... Rest of the calculation and suggestions are well.
Abhe main br 16 mm aygi
It's all confusing
Sir for 3 storey house
6 no 12mm bars are sufficient or not
Column size 9 * 15 "
Please guide
Not economical.