Howto Make PARETO CHART in GOOGLE SHEETS in Just 5 Minutes Explained with Example

Sdílet
Vložit
  • čas přidán 5. 09. 2024
  • Howto Make PARETO CHART in GOOGLE SHEETS in Just 5 Minutes Explained with Example
    In this video you can learn to make a PARETO CHART in Google Spreadsheet or Google Sheet.
    Google Sheets can be used for accessing the data anywhere in this world through cloud.
    ----------------------------------------------
    For more details and other videos click on the link: / @aytindia
    Lean Manufacturing & Toyota Producytion System Training Videos: • LEAN Manufacturing
    ---------------------------------------------------
    Music: www.bensound.com
    -------------------------------------------------------
    About Myself: Shakir Mohd (B.TECH)
    • I am a B.Tech in Mechanical Engineering
    • I have total working Experience of Around 7 Years in Training, Execution and Implementations of Various Lean Tools and Techniques (such as VSM, KAIZEN, TPM, 5S, Visual Management, Poka-yoke, SMED etc.) in approx. 100 Units.
    • I have a wide exposure for Implementation of Lean Manufacturing Tools & Techniques to different industries like Automobile, Engineering, Food Industries, Leather Handicrafts, Leather Garments, Garments, Printing, Packaging, Shoes Industries, Plastic Injection Moulding, Aluminum Die Casting, CNC Machining, Conventional Machining, Tool Room, Press Shop, Fan Industry, Bicycle Industry, Fabrication & Sheet Metal etc. for improving their Productivity, Reducing Manufacturing cost & Rejection, 5S Levels, Employees Trainings with proper resource utilization and Implementation of various Kaizens (Improvements).
    Key Skills:
    • Value Stream Mapping (VSM), TIMWOOD (Seven Wastages), PQCDSME (Seven Benefits) Productivity Improvement, Time & Motion Study,
    • TPM (Total Productive Maintenance), FUGAI Tags, 8 Pillars of TPM , Elimination of Six Big Losses (SSSMCB) through TPM
    • 5S, KAIZEN, 7 QC Tools, VA/NVA Activities, Root cause analysis, SMED, Safety Improvements, Visual Management, etc.
    ----
    SOME OF MY ONSITE PROJECT OF TRAINING & CONSULTANCY, COMLETED/ UNDER-PROCESS ARE:
    Ultratech Cement (4 Plants)- Truck Turn Around Time (TAT) Prject
    Combit Shoes, Bahadurgarh (HR)- Plant Layout Setup Project
    Printsmith (Infinity Advertising Pvt. Ltd.),Faridabad
    MSME- Faridabad Engineering Cluster No.1 (9 Units)- LMCS Cluster
    MSME- Faridabad Engineering Cluster No.2 (6 Units)- LMCS Cluster
    MSME- Faridabad Engineering Cluster No.4 (7 Units)- LMCS Cluster
    MSME- Yamuna Nagar Engineering & Fabrication Cluster (9 Units)- LMCS Cluster
    MSME- Ludhiana Cycle Parts Cluster No.2 (7 Units)- LMCS Cluster
    MSME- Manesar, Leather Handicraft Cluster No.1 (7 Units)- LMCS Cluster
    MSME- Bahadurgarh Footwear Cluster (6 Units)- LMCS Cluster
    MSME- GZB Food Cluster (9 Units)- LMCS Cluster
    Raga Engineers- Core Pins Productivity Improvement Project, Faridabad (HR)
    Raga Engineers- Crack Toyota Project, Faridabad (HR)
    Technomech Industries, Faridabad (HR)
    Woodpecker Systems, Faridabad
    Falcon Vacuum Pumps, Faridabad
    Welcome Footwear, Bahadurgarh
    RKP Packers, Delhi
    Presto Stantest Pvt., Faridabad
    United Cores Private Limited, Faridabad
    PMT Engineers, Faridabad
    UD food Products Pvt. Ltd., Ghaziabad
    GK Industries, Faridabad
    Durga Engineering Works, Faridabad

Komentáře • 15