Video není dostupné.
Omlouváme se.

Beryl Bravo - Design, Construction and Installation - UK Industrial Film

Sdílet
Vložit
  • čas přidán 21. 08. 2016
  • Beryl Bravo Platform - Design, Construction and Installation - UK Industrial Film 1982-83
    Also see:- • Beneath the North Sea ...
    Produced Written and Directed for Mobil by Michael Forlong

Komentáře • 21

  • @angusmackay6196
    @angusmackay6196 Před 2 měsíci

    I was on there in 2011 for 18 months . This is very interesting

  • @roberthelmsly1
    @roberthelmsly1 Před 4 lety +5

    My first trip was on Beryl B in 1984 went from there to the Clyde in 1987 was there for 32 years. Finished offshore 2019 after 35 years.

    • @ppppugh7892
      @ppppugh7892 Před 3 lety

      Do you remember a Kiwi called Peter Gurr? Electrician from 1981 until 2000's on Beryl Bravo. It was KCA / Mobil back then.

    • @roberthelmsly1
      @roberthelmsly1 Před 3 lety

      Did he have glasses? I can picture him if it’s the same guy. Remember a few guys, one of the drillers was Tommy Adams, Pancho Hernandez’s think he was the assistant driller, Arthur the store man, Peter Alphabet gave out the cabins, Martin Boyle was one of the medics, the camp bosses were Mike Scott and Mike fletcher, big Matt the head chef. You had a good laugh back then, not like that now. So glad I finished up last year, 35 years is long enough.

    • @ppppugh7892
      @ppppugh7892 Před 3 lety

      He did have glasses, quite short 5'8" moustache, lived in Wales. Lovely fella. You've done your time pal. Earnt your retirement. Thanks for the reply.

  • @markmac44
    @markmac44 Před 5 lety +6

    I have just watched that. Whilst sitting in my room onboard the very same platform! November 2018

    • @cw7784
      @cw7784 Před 4 lety +1

      I was going to ask if that platform is still around lol

    • @davefoster1162
      @davefoster1162 Před rokem

      Same here haha. Aug 2022

  • @basilguts1786
    @basilguts1786 Před rokem

    Incredible engineering and such huge risk involved from start to finish. 👍

  • @brian5606
    @brian5606 Před 3 lety

    So much precision and preparation goes into this larger than life building & movement of these oil field structures.

  • @ReprievedSoul
    @ReprievedSoul Před 10 měsíci

    5 years of my life went into BerlyB. Got C.Eng with all the boxes ticked with BerylB work Hammersmith, UIE Cherbourg, Cleveland Offshore, Redpath and KCA Drilling in Lincoln, Motherwell Bridge Flareboom AOCI Hookup. Now Bechtel pension comes in every month :-)

    • @mickraff66
      @mickraff66 Před měsícem

      I was an apprentice welder at Cleveland offshore working on it …

  • @pf-2292
    @pf-2292 Před 3 lety +1

    Brilliant

  • @alexandermckechnie3955
    @alexandermckechnie3955 Před 3 lety +2

    Worked on the hook up for Blandford Offshore on Beryl B 1983 1984 good memories.

  • @alandack2144
    @alandack2144 Před 6 lety +3

    My first trip offshore was also on the Beryl B

  • @skoty2hotty
    @skoty2hotty Před 4 lety +2

    I miss the beryls only two rigs I’ll go back too.

  • @philsteele7151
    @philsteele7151 Před 15 dny

    Nowadays they are decommissioning some of this kit, and they are picking up the entire topside onto one vessel and transporting it to shore for scrap, forty years and a whole generation of specialist massive rigs later.

  • @Sean-qm8cb
    @Sean-qm8cb Před 8 lety +1

    scary that i done my 1st trip offshore on the beryl bravo august 2013

  • @mzikayifanimavuso4818
    @mzikayifanimavuso4818 Před 6 lety +1

    Engineering at work!