Massive Progress on the Groundwork of the LEGO City | JuMa City 2.0 Update 5

Sdílet
Vložit
  • čas přidán 14. 09. 2023
  • Thanks to a rather big BrickLink order I was able to get a lot of very important progress done on the lower section of the city. I was also able to (maybe) finalize the train track layout by playing around with some switches and last but not least I ballasted the first section of my train track. Enjoy!
    PennLUG website for ballast instructions and more: pennlug.com
    FX Track: shop.fxbricks.com
  • Zábava

Komentáře • 3

  • @yurrien8305
    @yurrien8305 Před 8 měsíci +2

    i love those kinds of long smooth turns! i got the R104 from trixbrix too for my layout! did you know the switch plate is removable the 1x3 on the other 1x3 plate that moves for the switch

    • @jumabricks
      @jumabricks  Před 8 měsíci +3

      Thank you for your comment! I also love having some smooth long curves! I always wanted to have something like that in my city. I know that it‘s possible to remove that piece from the TrixBrix switch but as I mentioned in this video I won’t end up actually using these switches so it doesn’t really matter for me ;)

  • @burgwaller5923
    @burgwaller5923 Před 6 měsíci +2

    👍🏼👍🏼👍🏼👍🏼