Hot Tapping & Double Double Stopple on 24" Crude Oil Line

Sdílet
Vložit
  • čas přidán 4. 12. 2014
  • This Project Involved Replacement of 9.8 KM Length Of 24" Crude Oil Pipeline of SMPL-IOCL By Doing Hot Tapping & Double Double Position Line Stopple at 4 Locations.

Komentáře • 9

  • @karlwooduk
    @karlwooduk Před 6 lety

    awesome.

  • @magip355
    @magip355 Před 7 lety

    How is it that the product doesn ignite as s result of the heat of the first drilling point (to install the spool fir the bypass line)

  • @boddetiramakrishna6489

    Hot Tapping & Double Double Stopple on 24" Crude Oil Line

  • @danielmoreno8493
    @danielmoreno8493 Před 3 lety

    I dont understand. I thought double doubles would have had 4 taps and bypass goes behind the stop but I may be confused

  • @adanperez6524
    @adanperez6524 Před 7 lety

    every liquid has a boiling point for it to ignite. if it is to rich doesn't ignite.another scenario is that need to be present the right elements like fuel,oxygen and fire.

  • @yrun989
    @yrun989 Před 3 lety

    [Welder life]ofical cut[SV]
    Pipe line test √
    Just meter

  • @MegaRIFIANO
    @MegaRIFIANO Před 5 lety

    technician without gloves, technician on line of fire, technician climbing on the valve, scaffold not tagged, etc.... etc...this company is not the safest...a mix of pictures of different job with different type of machines....Hope the camera was ATEX

    • @jonathanmanley8739
      @jonathanmanley8739 Před 5 lety

      MegaRIFIANO cold cut guy is in there with no FR and short sleevesAND a polyester golf shirt......definitely not real pipeliners