I had the same question. After looking up a Siemens ppt about wind generators, I found that QT is the maximum generator reactive power output entered in Mvar, and QB is the minimum generator reactive power output entered in Mvar
Topology error: 3 bus(es) with bus type code and series element status inconsistencies (000490) what is the solution for above mentioned error.. i have completely followed above steps.
Great video!
great work thanks a lot for you
Thank you!
you are a legend
Thanks
Please demo how to run the simulation of fault current that contributed from Solar and Wind.
Where are you getting all the data from? How do you decide the MVA ratigns on lines and gens? Why are they not on the same base?
Brother how can we add a point of common coupling in a network diagram . PCC
What do we mean by "Standard QT, QB limits"? in the Wind Data Control Mode?
I had the same question. After looking up a Siemens ppt about wind generators, I found that QT is the maximum generator reactive power output entered in Mvar, and QB is the minimum generator reactive power output entered in Mvar
there is no direct link for download the PSS/E free
2:36 x source 99999?
Is it possible to connecti with you on Linkedin?
Topology error: 3 bus(es) with bus type code and series element status inconsistencies (000490)
what is the solution for above mentioned error.. i have completely followed above steps.
Have you selected a swing bus
@@AbdulSamadAnwer yes. One is swing bus two are generator and one is non-generator i.e load bua