  • Wurtec’s Plumb Line Drop Tool and Rail Alignment
    Starter Kit are used to determine where the first pair of main elevator rails should be installed. The worker will position the preset Wurtec Drop Line Tool at the top of the hoist way. He will then drop two weighted Music Wires from the ends of the Drop Line Tool down the hoistway. He will then check the position of the music wire against the hoistway wall at each of the landings.
  • Jak na to + styl

Komentáře • 14

  • @manikantakoruprolu
    @manikantakoruprolu Před 6 lety +1

    super

  • @akshaythakare6464
    @akshaythakare6464 Před 6 lety

    good job

  • @ImronHakam
    @ImronHakam Před 6 lety +1

    whats brand ?

  • @widetechservicesalgerie1105

    Safe and easy way ,but unvailable in our country , Algeria.

  • @jayrajladani7049
    @jayrajladani7049 Před 5 lety +2

    I want this tools of rail alingment in india how to i get them

    • @WurtecInc
      @WurtecInc  Před 5 lety

      Thanks for inquiring! Please send an email to sales@wurtec.com and we will help you get the products.

  • @user-rn7nr9cw8y
    @user-rn7nr9cw8y Před 8 lety

    مرحبا بكم ممكن سعر

  • @classiq876
    @classiq876 Před 5 lety

    What about a windy pit? The plumb ball will be all over the place.

    • @danielquezada3058
      @danielquezada3058 Před 5 lety

      classiq876 put the weight or the plumb bob in a bucket of water

    • @pgk1940
      @pgk1940 Před 4 lety +2

      I am now retired after 40 years in the elevator industry, 22 of them in installations. During that time, I hung a lot of plumb lines, and because even with small diameter plumb wires and 50 lbs. line weights, it takes very little wind to cause the lines to move, not to mention lines having a habit of being accidentially moved while being worked around, once the lines had settled into place in the pit during the initial hanging, they were then fastened on to the face of a board that was in line with the face of the rails in the pit.
      Maybe on a 2 or 3 landing install, a bucket of water might suffice to steady a line, but on a high rise, there'd be more time spent on waiting for the lines to settle than actually working on aligning the rails.

    • @chriscarr6016
      @chriscarr6016 Před 4 lety

      How about hire a real elevator mechanic before someone dies

    • @claytonno2571
      @claytonno2571 Před 5 měsíci

      @@pgk1940 good explanation

  • @asbaslam8260
    @asbaslam8260 Před rokem

    Asb aslam

  • @billbokaro3494
    @billbokaro3494 Před 3 lety

    Who entertaying this "device", don't has a little imagine about real work ,out of screen & table. Sitting on a fifth point and talking some stupid ideas.