138 kV switch malfunction

Sdílet
Vložit
  • čas přidán 25. 11. 2022
  • Hey Everyone!
    While filming some 138Kv switching, things didn't quite go as planned. I was initially going to scrap the video, but decided it would be great to share and emphasize the importance of stopping all work when a problem is encountered. This applies to all jobs!
    During routine work, if ever you encounter a situation that isn't consistent with the pre job discussion - Stop and reassess the situation. Make sure everyone involved in the work is aware and come up with a new plan!
    Cheers all!
    ** These video's are NOT intended for training or D.I.Y. Only properly trained and authorized personal are allowed to work on this equipment. Always adhere to work methods and procedures particular to the company you are working for. **
    Be safe Everyone. Cheers! 🥂
    Don't forget to drop a 👊 along with where you're watching
    ➡ / bobsdecline
    #Bobsdecline, #Beingalineman, #Lineman

Komentáře • 283

  • @Bobsdecline
    @Bobsdecline  Před rokem +156

    Hey Everyone!
    While filming some 138Kv switching, things didn't quite go as planned. I was initially going to scrap the video, but decided it would be great to share and emphasize the importance of stopping all work when a problem is encountered. This applies to all jobs!
    During routine work, if ever you encounter a situation that isn't consistent with the pre job discussion - Stop and reassess the situation. Make sure everyone involved in the work is aware and come up with a new plan!
    Cheers all!

    • @jwilli2460
      @jwilli2460 Před rokem +23

      Aaron, you're really putting out some great info. As a system operator, I enjoy seeing what's going on on the other end of the phone call. I can't tell you how many times I've gotten the call that a switch won't operate correctly and we have to start figuring out our next steps. Keep up the good work and as I've said before, BE CAREFUL!!!

    • @earlestes8649
      @earlestes8649 Před rokem +12

      Is there a adjustment for that second bar so that you can set it to close better? It’s like the second one is a tooth or more out of time with the first one.

    • @Bobsdecline
      @Bobsdecline  Před rokem +11

      @Earl Estes yes there are multiple points of adjustment. It can be finicky at times, but usually not an overly complicated repair

    • @conradbarthel54
      @conradbarthel54 Před rokem +7

      Seeing as the middle phase was the only one that closed 100% that disconnect needs some scotchbrite and a coating of graphite and it will be mint! Glad to see your not the only other utility here in Canada that has those bulk oil breakers!!! MB hydro power electrician here

    • @montanaboy3777
      @montanaboy3777 Před rokem +3

      As always there sir...learned things I didn't know before - very entertaining and fun to watch you while you on the job. I am curious as too WTH geo cash is ?? or what that small plastic container was for? Love the videos and the wide menu of things your job brings too you!! Keep up the great work - (Along with you fellow workers). I was wondering if you know the frequency your company operates on...would love to listen in. thank you Jeff

  • @edmarks688
    @edmarks688 Před rokem +66

    Love the fact you showed the geocache you found and talked about it briefly. Being a geocache myself it's great to see these little nuggets shared

  • @phaphrd
    @phaphrd Před rokem +9

    Love that he's gonna transfer the geocache over to the new pole! What a guy!!

  • @tiago222ofnewyork8
    @tiago222ofnewyork8 Před 5 dny

    I honestly said to myself "What a good guy..." out loud about a minute ago.
    It's really a heartwarming moment when someone is big enough to understand that while it might seem dumb, silly, or insignificant to some people, they are smart enough to know that was important to someone. That little bit of extra courtesy of transferring safety reflectors that someone might have put up so they know where the pole is in relation to their driveway when the snow is 2 feet deep or a geocache that was a middle schooler's project - well it just breeds goodwill between people. And goodwill is what this place needs now more than ever. 👍

  • @devin8656
    @devin8656 Před rokem +106

    Love that you show the methodical process required for something as superficially simple as flipping a switch. Things may not have went as planned but I definitely learned something. Cheers!

    • @jfbeam
      @jfbeam Před rokem +11

      There's NOTHING superficial about 138 THOUSAND volts. This isn't a 120V lightswitch energizing a 5W lightbulb. Even the smallest thing going wrong could be deadly.

    • @yopajo
      @yopajo Před rokem +12

      @@jfbeam dam straight .. my early field career was in HV started at 13Kv topped out at 150Kv - go slow - one mistake either kills you - severely damages you or worse you kill / hurt someone else. IMO not being completely comfortable around it is a good thing as it keeps you focused.

    • @RWoody1995
      @RWoody1995 Před rokem +10

      @@jfbeam I think when they said "superficially simple" they meant "something that looks simple but isn't necessarily simple" not that the task itself is "superficial"

    • @ikonix360
      @ikonix360 Před rokem +3

      @@yopajo Also it can damage equipment either owned by the power company or owned by the end user that happens to be connected to the line.

    • @erzahler1930
      @erzahler1930 Před měsícem

      And here I am, restoring tube ham radio gear, and methinks that 2 kVDC on the plates in the power amplifier was a lot! HA!
      When restoring ham radio gear, we always go by the "one hand in the pocket" rule. Another rule we go by basically says (paraphrased a bit): "Always assume the chassis is hot until you KNOW it's not." (A little poetic license taken. 😁) Even with a power transformer at the AC mains power (117 VAC RMS), a short in the power supply section, or a serious leak in a filter capacitor (leaking electrically AND physically) can create a direct short to chassis ground; not a nice thing to contemplate.

  • @davidschick6951
    @davidschick6951 Před rokem +56

    Bravo on your safety procedures. It reminds me of when I worked in a nuclear power plant. I was security but even though I didn't do electrical work, our leadership strongly emphazied that if we got any unexpected result, stop, make the work safe, and notify whoever you needed to notify. I miss it.

    • @lesterawilson3
      @lesterawilson3 Před rokem +5

      7 years in nuclear IT and the same rules applied to us. Crazy place to work but I miss the hell out of it!

  • @rodolfovillalobos4433
    @rodolfovillalobos4433 Před rokem +8

    Retired power plant electrician, our system was 345KV. Nice arc show when it was foggy/humid. Nice to see different equipment being used out there. New or old.

  • @MagentaRV
    @MagentaRV Před rokem +7

    I wish more linemen would transfer caches to the new pole when you replace one! Thanks for pointing it out and bringing awareness!

  • @jonahansen
    @jonahansen Před rokem +3

    Bob - you're a real stand-up guy. I bet they like you a lot at your company...

  • @Gregory.Evans66
    @Gregory.Evans66 Před rokem +25

    You are the true heroes. Life stops in its tracks when the power goes out. Thank you for keeping us alive!

  • @inothome
    @inothome Před rokem +16

    Good emphasis on stopping when switching doesn't go correct and also to verify that the contacts fully went in and rolled. I know you know, but I am sure not many outside the industry understand how most HV switches operate. The movable contact actually rolls inside the jaws BEFORE it starts to move out of the jaws. Opposite when it's closed. The movable contact fully inserts in to the jaws and then it rotates to make the solid connection and also performs a "wipe" as it seats to help clear any corrosion on the contacts. The movable contact isn't round, it has ears, per se on it that allows it to move in and out of the jaws with no friction and then rotate to close the connection. Speaking of corrosion, the contacts are usually silver plated, since silver oxide conducts. Vs coper oxide that is a bad conductor and will not make a good connection. That's why when performing maintenance on most HV switches you do NOT use anything more abrasive than a light Scotch-brite. The silver plating is thin and a wire brush could remove the silver plating, leaving just the copper that can lead to hot spots later down the road. As archaic as some substation equipment may look, there is a lot of engineering and lessons learned that is going on, even with something as simple as this switch.
    Some more 138kV switch action!! And yes, some of them needed maintenance and should not be that hard to operate. A few did end up breaking over the years.
    czcams.com/video/K8cMSDwZkDU/video.html

  • @mikeiver
    @mikeiver Před rokem +8

    I work now for a large research center of a global corporation as an electrician. We work everything from the outlets and equipment all the way out to the yard where we have 138KV incoming for the whole facility. They make use dawn the 40cal suits et al for any manual switching. But like you said, it is rather easy if you just follow the check list. Cool videos.

  • @1234j
    @1234j Před rokem

    Your videos are just packed with information and interest. Thank you for such consistent content. Cheers from England.

  • @bloodybritbastard
    @bloodybritbastard Před rokem +6

    Brings me memories. Years ago had to do a computer deployment for an energy company, which included a mandatory 4 day electrical safety course. No problems working in the offices but having to walk into the protected switching park to access the local main control room, surrounded by lots of lattice structures with very heavy HV cables strung everywhere. Safety was drilled in: Stay on the concrete path. Don't walk on the gravel on either side. If you fall or slip don't move and call for help. The control team will come looking for you if you are not there in 5 minutes. And the omnipresent angry buzzing like walking into a hornets nest was extremely unsettling and oppressive!
    I did ask the team why the big safety certifications just to drag in and out a bunch of computers, and the offhanded sarcastic comment from the site supervisor was to the tune of "if one of those 63kv lines strung across the parking lot falls to ground, all the earth connectors in the building will go live. And if you plug in a computer at that time, it will kill you. But at least you will know why you died".
    I will admit that the short 100 metre walk to that general control centre was genuinely scary! All the time remembering the spark gap distances for any energised conductors we were given in the training. Getting up close and personal to enough power to run a region with a town of 100 000 people and an industrial zone containing one of the countries largest oil refineries was awe inspiring. And yeah, scary!

  • @jolyonwelsh9834
    @jolyonwelsh9834 Před rokem +10

    You are the best lineman I have ever seen on CZcams. Keep up the good work.

    • @Bobsdecline
      @Bobsdecline  Před rokem +1

      🙏 Appreciate that very much! 🤝👊

  • @artwigwa
    @artwigwa Před rokem +1

    Thank you for sharing your work on camera, very interesting. Stay safe 👍

  • @TheJmich2001
    @TheJmich2001 Před rokem

    Big juice!! Thx for keeping us warm! NJ

  • @fellpower
    @fellpower Před 5 měsíci +1

    This is a lineman, that works with standards and rules - like we germans do - great work and greetz from a german electrican ;)

  • @jeffreykornspan9053
    @jeffreykornspan9053 Před rokem

    Thanks for the Video Aaron. Great details with the grounding and the defective air switch.

  • @scrotiemcboogerballs1981

    Love watching the videos buddy thanks for sharing

  • @frederickbowman4494
    @frederickbowman4494 Před rokem +1

    I like your style of safety great job!

  • @leotexas3485
    @leotexas3485 Před rokem +1

    This was an awesome video! I’m a residential apprentice, but I appreciate and learn from all aspects of the grid.

  • @chrissjcgmail
    @chrissjcgmail Před rokem

    Thank you, Aaron!

  • @dividendjourney
    @dividendjourney Před rokem +8

    Thank you Aaron as always Brother for showing everyone real-time electrical safety. You've taught myself and many other upencoming Lineman safe work practices! God bless, stay safe 🙏 👍👊

  • @colehoffmeyer9083
    @colehoffmeyer9083 Před rokem +4

    I only trim tree around power lines but find it fascinating on the inner workings of the system

  • @erzahler1930
    @erzahler1930 Před měsícem

    I like the methodology. It's a lot like railroads. When a Maintenance-of-Way (MoW) gang is working a problem, such as a malfunctioning power switch. A "power switch" is a motorized switch for switching a train to one track or another at a junction, such as a passing siding. It can be remotely operated by the dispatcher, or manually operated by a train or ground crew on site. With train traffic still moving in the area, the gang foreman will call the subdivision dispatcher via radio to get a "track and time" warrant to occupy that section of track. The warrant will specify the warrant #, the exact milepost location where work is being accomplished, the track limits (from milepost # to milepost #), and whether the track is a main line, a siding, or a branch line.
    The time declared for the warrant depends largely on traffic density. If the track is low density, such as an industrial lead or a secondary branch line, the warrant will specify a time limit. If the track sees high density, such a section of a transcontinental line, the warrant will read "joint with dispatcher until called." This means the MoW crew must clear the site for approaching traffic when the dispatcher so informs the foreman. The warrant is cleared, allowing the train to proceed at a reduced speed. Once clear, the track foreman will call the dispatcher to create a new track-and-time warrant with the same information as the previous warrant.
    Obviously, a railroad is not an electrical transmission line, and vice versa. However, procedures for doing/completing work are similar.
    Fun fact: the rails on a railroad actually have a tiny current running through them, pushed by a very small voltage, maybe 2 or 3 VDC. Rails run in shunt circuits and are normally open between blocks. When a train runs over a shunt, it completes the circuit, which signals the dispatcher where that train is on the railroad. Shunts are also used to activate/deactivate grade crossing protection.
    While the two industries are miles apart in form and function, there are, nevertheless, similarities between both. Also, on a railroad, any signal or electrical apparatus needing maintenance is performed by a "signal maintainer."
    I thought you all might find that interesting. 🙂

  • @Happymacer_P
    @Happymacer_P Před rokem +4

    Thanks! A video showing best safety practice is great to see! On a related note, I’m sure you know this but maybe some of your viewers don’t: that grounding mat at the operating wheel you mentioned is an equipotential mat, to ensure your feet and hands are at the same voltage if a phase to ground fault should occur. Critical safety device, and as you say must be checked for continuity before operating the switch. Such a simple device can save a life!

  • @shawnerz98
    @shawnerz98 Před rokem +15

    Thanks for what you do! Thinking about the things can go wrong on 138KV lines scares me. I think I'll stick to my 3.3V, 5V, and 12VDC systems thank you very much! 😀

    • @AldoSchmedack
      @AldoSchmedack Před 8 měsíci +2

      lol 😂 Why I do electronic engineering and not electrical right there! Worked on up to 13.8 and prefer NOT to tyvm.

    • @Gengingen
      @Gengingen Před 2 měsíci

      Looks like you don’t care much for the light & sound show 😊

  • @alan.macrae
    @alan.macrae Před rokem

    Thanks Aaron. Another informative video. 👊

  • @Tech-NO-City
    @Tech-NO-City Před rokem +29

    I wish you would elaborate more on the worst case scenario. What not to do is equally important to know.

    • @Bobsdecline
      @Bobsdecline  Před rokem +20

      A great point! I'll keep that in mind with future videos 👊🍻

    • @matthewellisor5835
      @matthewellisor5835 Před rokem +19

      @@Bobsdecline Yes! Few understand Why re-opening a switch (even if it just wouldn't fully close) without authorization could leave someone else in a dangerous situation with overloaded lines or leave many users down the line at risk of a cascade-failure.

    • @linehandibew6205
      @linehandibew6205 Před rokem +12

      Don’t get killed…. That’s the worst case scenario. And the way to do that is to follow procedures. If something isn’t working properly or you are unsure of what is being requested of you then you stop everything and clarify the orders and get on the same page with the operator. Don’t be an idiot and never just wing it. Measure twice cut once

  • @timbelson9522
    @timbelson9522 Před rokem

    I kept staring at the communications tower behind you at around 1min 30 into the video thinking about work earlier today being called in to find the broken line on emergency call today, except dint usually scan above the lowest line's for issues, i respect your work and others who work on the low voltage and high voltage lines above ones i do work on

  • @eyeofbass
    @eyeofbass Před rokem

    Massive respect. Enjoyed the insights. Subscribed.

  • @2024301
    @2024301 Před rokem

    So interesting to see how all this works

  • @wrnrt
    @wrnrt Před rokem +1

    Thanks for adding the space in the title. 🙂

  • @carlubambi5541
    @carlubambi5541 Před rokem

    Great work you do !

  • @theamerican7080
    @theamerican7080 Před rokem

    Fascinating.

  • @Matty-oc8db
    @Matty-oc8db Před 6 měsíci

    That's super impressive you're trained and capable of switching overhead, underground, and in the transmission substations. We have different departments for each of those so coordinating operations is kind of a nightmare for us sometimes.

  • @B-Scales
    @B-Scales Před rokem

    Eveytime I watch an video, it make me want to be doing Line work!

  • @perserverance719
    @perserverance719 Před rokem +1

    Your channel is fantastic! Should have way more subscribers than channels that just make you lose brain cells when you watch them.

  • @TheBradbo1140
    @TheBradbo1140 Před 4 měsíci

    What an interesting job.

  • @zootflute
    @zootflute Před rokem

    Great work on another educational video!

  • @theslowride66
    @theslowride66 Před rokem

    loved learning now the switches work I seen right away they were not making a good connection. NO Bs when dealing with electricity.

  • @AlanTheBeast100
    @AlanTheBeast100 Před rokem

    Very informative video. I'll have to re-watch...

  • @gertebert
    @gertebert Před rokem +1

    Best job in the world! You have to be intelligent, understand everything about high voltages, work with your hands, have a bunch of colleagues that you can trust to the bone and you work outside in the fresh air!

  • @spikester
    @spikester Před rokem +4

    Always interesting as usual, those gas filled breakers are gigantic. I presume most of the open air breaker bars are spring loaded nowadays & these are older units where there is no 'slam action' on the blades when you get to a specific point in the crank. Thanks for all your hard work as usual showing us how its done.

  • @crockpot5194
    @crockpot5194 Před rokem

    Hey Bob yes I'm actually doing 2 projects. Haven't been on for a while because of me doing this. It's definitely alot of work

  • @johnwalker890
    @johnwalker890 Před rokem

    Good job Aaron.

  • @Real_Moon-Moon
    @Real_Moon-Moon Před rokem

    If something ever seems off, check it.
    This is a good thing to keep in mind for most if not every industry. Including the field of structural engineering and architecture. Which is where I'm going.
    There have been lots of tragedies caused by people not double checking.

  • @SarahLowrey
    @SarahLowrey Před rokem

    Good deal, Bob! As an equipment operator at a nuclear power plant, we have as stringent requirements as you. Good to see them followed so well.

    • @throttlebottle5906
      @throttlebottle5906 Před rokem

      the TLM crew probably went out, closed it and hammered it in place with hot sticks. 🤣🤣

  • @IimmanSdexterXan
    @IimmanSdexterXan Před rokem

    very interesting . ty .

  • @jeffreykornspan9053
    @jeffreykornspan9053 Před rokem +8

    hi Aaron, we just had a one engine private plane get entangled in one of our 500 KV transmission towers this evening and they had to open them to rescue the pilot as well as removing the plane. Only took down one or two outdoor substations along with numerous other 69KV indoor substations. And about 85,000 customers on a cloudy, rainy sunday evening. jk

    • @Bobsdecline
      @Bobsdecline  Před rokem +4

      Crazy! I actually just came across the article about that on my newsfeed! 😮😟

    • @AldoSchmedack
      @AldoSchmedack Před 8 měsíci

      😮 wowsa bad place to land a line... notes that for future flightschool classes... 😂

  • @raydunakin
    @raydunakin Před rokem

    This was pretty interesting.

  • @okzzvil7617
    @okzzvil7617 Před rokem

    Thanks

  • @busnorth
    @busnorth Před rokem

    I have great respect for linemen. I have started many arguments on work sites as to why pumers make more money over electricians considering the levels of danger.

  •  Před 2 měsíci

    Outstanding, simple comment

  • @mikeholmstrom1899
    @mikeholmstrom1899 Před rokem +2

    Some years ago, part of the Bay Area had an "Oops!" blackout, during work on major lines like those:
    "PG&E blamed the outage, which affected more than 375,000 households and businesses in San Francisco and on the Peninsula, on construction workers who failed to remove a grounding apparatus before restoring power to substation equipment they were servicing.
    The utility also faulted a control room crew for turning off protective devices designed to confine any outages to the substation."

  • @peterwexler5737
    @peterwexler5737 Před rokem

    You would be a great airline pilot, Bobsdecline.

  • @tedmoss
    @tedmoss Před rokem

    Boy! I haven't heard that hum for many years! The 500 Kv is even louder.

  • @Samanthareneeheart10
    @Samanthareneeheart10 Před rokem +2

    Be careful as Always Erin have a great weekend

  • @eyeofbass
    @eyeofbass Před rokem

    The Mr. Fixit in me wanted to give the breaker blade a good shove into place. 😂

  • @easymac79
    @easymac79 Před rokem

    14:00 You should have taken the cache and joined, or at least looked into it. I've heard of it. Sounds fun if you have time for it (Certainly you don't), but maybe a friend.
    Cheers, love your videos, always learn something.

  • @wesley1983
    @wesley1983 Před rokem

    12:14 thanks for the shout out to the Relay Techs. 👍

  • @jeffreykornspan9053
    @jeffreykornspan9053 Před rokem

    Good evening, Aaron. My mistake on the voltage on our utility here in Montgomery County. They were 230 KV. There are a set of that runs from Montgomery to Howard County that are 500KV also. I did the old rule of thumb counting the rings on the insulators. But, yesterday made a call to one of my engineer friends and he confirmed the correct KV.

  • @scotsmanofnewengland7713
    @scotsmanofnewengland7713 Před měsícem

    Differently a dangerous job and over the years a lot of men and women have been seriously injured and killed. I lost a second cousin who was a lineman and got electrocuted up in a bucket truck while repairing a line after a severe thunderstorm. Sad he left a wife and child. Be careful and always “ Safety “

  • @Bluenoser613
    @Bluenoser613 Před rokem +4

    I hope you signed the geocache!

  • @jsb7546
    @jsb7546 Před rokem +1

    Dope geo cash find

  • @MrBurritoMan
    @MrBurritoMan Před rokem

    That's a tremendous number of angry pixies...

  • @shuntawolf
    @shuntawolf Před rokem +2

    Always nice to see things like this. So many companies out there ignore the basics at times that it winds up costing time and money. Something as simple as "go flick that switch and make sure it's working right" can turn disastrous in a hurry if even the most simple of procedures aren't followed. Question I have is why didn't the two bars seat fully? Issue with the bars themselves, or with the rotating mechanism or ??? I'm surprised that the gearing didn't let it go past the 90 degree mark under force.... Curious now....
    Stay safe up there!

  • @NotActorRobertLoggia
    @NotActorRobertLoggia Před rokem

    Just found this channel, so maybe I'm missing something, but it looks like you're switching alone. Maybe we're spoiled were I work, but the switchmen I work with would never even entertain doing this kind of work alone. Stay safe out there.

  • @Relkond
    @Relkond Před rokem

    Failure is mandatory.
    What you do when failure occurs is what’s important.

  • @TandD1w
    @TandD1w Před rokem

    Thanks for transferring the geocache. I don't know if everybody would have done that know it really shouldn't have been attached to your pole in the first place.

    • @Bobsdecline
      @Bobsdecline  Před rokem

      It's not really, but also pretty harmless. Really great hobby that I encourage anyone to try!

  • @jimsvideos7201
    @jimsvideos7201 Před rokem +2

    I admire your willingness to do this job; I'm ok with 220 VAC but the kind of voltage that comes out to get you... 🤔

    • @MrTheHillfolk
      @MrTheHillfolk Před rokem

      LOL I've had 480 try and bite me on a damp day when I go to touch my fluke leads to an ats checking generator power by seeing a little arc reach out and touch the metal tip before I make contact, that's enough for me forever !

  • @DaylightRobberyCA
    @DaylightRobberyCA Před měsícem

    All sorts of work, electrical or not, changing/unexpected conditions are a huge risk for incidents.

  • @Qazxswer68
    @Qazxswer68 Před rokem +6

    Hey it’s a geocache😃 My favorite outdoor hobby:) You wouldn’t mind sending me the location of it so I can tell the owner they made it on CZcams.

    • @tcoradeschi
      @tcoradeschi Před rokem +2

      And that it “Needs Maintenance”!

  • @Croissinate
    @Croissinate Před 6 měsíci +1

    The forbidden playground

  • @gleydsonjunqueira4876

    Up Bro

  • @Bacongrease00
    @Bacongrease00 Před rokem +1

    Still rocking those OCBs

    • @arthurcarr7364
      @arthurcarr7364 Před rokem

      What's your PCB content in the main tank and the bushings?

  • @ottoroth9377
    @ottoroth9377 Před rokem

    I've been an electrician 52 years but will not mess with the big stuff, nope, sorry, don't want to be a pork chop well done!

  • @OfficialNakatsuMegami
    @OfficialNakatsuMegami Před rokem +1

    I know first hand the effects of running a load on a bad switch. The line voltages will drop and cause havoc on everything downstream. Running Enterprise servers I ran Server APC units that monitored mains condition, and we would drop to 90Volts at time and resulted in many destroyed power supplies only rated down to 100 volts to operate. That is why i am so adamant of running 240V worldwide as if there is voltage sag, it will still be inside tolerances of most devices.

  • @ScooterMcDooter69
    @ScooterMcDooter69 Před rokem

    A Cleaveland Price switch has the same style switch that would fix that problem 😉 if you don't feel like adjusting the interphase pipe to get the blades to fully seat in the jaws of the switches

  • @TheNapalmFTW
    @TheNapalmFTW Před rokem

    This is why it can take a while to put the power back on after a cut. And I'm okay with it.

  • @andrewrussack8647
    @andrewrussack8647 Před rokem +1

    Nice video. Single person switching on live equipment is not allowed in Australian jurisdictions.

  • @HotelPapa100
    @HotelPapa100 Před rokem

    I used to work in design of high voltage switchgear. One device was a life-tank 480kV 63kA breaker. These dead-tank devices looked strangely weird to me.

  • @capitalfelony305
    @capitalfelony305 Před rokem

    at 3:24 I'm seeing how the rigid pipe is crimped down on the bond wire a couple times, in order to bond the pipe. I've never seen that method before... seems like a good cheat there! :) Easier than using bonding bushings or clamps i suppose.

  • @Dinco422
    @Dinco422 Před rokem +1

    The most I got shocked by was 200v while backfeeding a small transformer... 138Kv... is just... You'd blow up basically. That's why I respect what you guys do so much, many people don't think about these people except when there's some trouble and they don't have power, but when nothing happens it means they do their job :)

  • @wesley1983
    @wesley1983 Před rokem

    8:44 You got 3 finger gloves? Never seen those before, awesome!

  • @nicktatters7523
    @nicktatters7523 Před rokem

    Brilliant video 👍 please leave your caption bar up for longer, we can read then. I have to keep rewinding and pausing, Thankyou.

    • @Bobsdecline
      @Bobsdecline  Před rokem

      I definitely do that in future uploads! Thanks for letting me know 👊🤝🍻

  • @timcat1004
    @timcat1004 Před rokem

    I just retired from CATV 41 years. I found a Geo Cash on my gate. Tossed it into the bush. They trespassed to get to the gate.

  • @akshonclip
    @akshonclip Před rokem +1

    I’d be willing to bet a geocacher ran into that pole while staring at his GPS screen. 😂

    • @Bobsdecline
      @Bobsdecline  Před rokem +1

      Magine, that was on the police report lol.. found it!

  • @unwired1281
    @unwired1281 Před rokem

    👍👊

  • @jamesmeme7734
    @jamesmeme7734 Před rokem

    Geocaching... that is awesome can I marked that off now that I seen it in your video.... hahahaha

  • @movax20h
    @movax20h Před rokem

    Cool video.
    Are there any work in switch yard that require working in pairs?

  • @DrumCoversbyBill
    @DrumCoversbyBill Před rokem

    Wow that humming sound. Dayum thats some serious juice.

  • @nathanburgon6629
    @nathanburgon6629 Před rokem

    Would be good to see the control room and the associated protective equipment. Interested to see what you guys in the USA use 🇺🇸

  • @arthurcarr7364
    @arthurcarr7364 Před rokem

    An old Kearney double side break disconnect. Why do you have 2 ground paths? Is the ground mat bonded to the ground grid through the vertical drive pipe of the operator or is the braid between the ground grid and the vertical drive shaft just in addition to the multi-rev grounding device?

  • @ottoroth9377
    @ottoroth9377 Před rokem

    I've been an electrician for 51 years...NO WAY would I even attempt to play this game of chance!

  • @NathanaelNewton
    @NathanaelNewton Před rokem

    Hey Bob! Love your glasses.. Can you share the details about them?

    • @Bobsdecline
      @Bobsdecline  Před rokem

      The "mirrored" pair at the start of the video are the smoked lens Nemesis And the dark tinted pair are the fog resistant Milwaukee.
      Both very good safety glasses... Highly recommend!

  • @CaptainKirk01
    @CaptainKirk01 Před rokem

    Is it possible there have been other tech's before you and there will be more after you closing and opening that switch and it being left for the next guy to do the same?

  • @rpyle76
    @rpyle76 Před rokem

    Every major electrical company should be getting fiberglass line poles soon.

  • @johnathonneal603
    @johnathonneal603 Před rokem +1

    During Thanksgiving, I was at my aunts property, and I noticed that the original transformer that was installed back in the 60s with PCB is still being used.