Tempesto: Placing the Train on the Tracks

Sdílet
Vložit
  • čas přidán 29. 08. 2024
  • After off season maintenance, we were able to witness the train being put back on the track at Busch Gardens Williamsburg

Komentáře • 13

  • @SirDrillAlot21
    @SirDrillAlot21 Před 6 lety +6

    So cool to see this behind the scenes hard work 😍

  • @byronusagi
    @byronusagi Před 4 lety +8

    i would love to have this profession

  • @michaezell4607
    @michaezell4607 Před 3 lety +2

    I would've thought that they just used a transfer track to install a fully assembled car/train like on most other coasters.

    • @adamstewart8109
      @adamstewart8109 Před 3 lety

      It was installed like this because every year when the park is closed they take the trains away for maintenance. The ride probably does have a transfer track this was just because they were moved to an off site location to have work done.

    • @edwardlack2578
      @edwardlack2578 Před 3 lety

      @@adamstewart8109 this model of coaster does not have any transfer or switch tracks of any sort, due to the nature of how it is designed and built. This is basically the only way for them to remove and install trains.

    • @adamstewart8109
      @adamstewart8109 Před 3 lety

      @@edwardlack2578 oh thank you, I guess that would be annoying if there was a fault with a particular train, you would have no option but to close the ride

    • @pwhnckexstflajizdryvombqug9042
      @pwhnckexstflajizdryvombqug9042 Před 2 lety

      @@adamstewart8109 This ride only has one train because it's a sky rocket model that has a really short layout.

  • @lizdilworth7533
    @lizdilworth7533 Před 4 lety +2

    Wait so they have to lift the trains on to the track with there bare hands. 😱

    • @lizdilworth7533
      @lizdilworth7533 Před 4 lety

      Adrian Russell it looked like it but why would they

    • @lizdilworth7533
      @lizdilworth7533 Před 4 lety

      Adrian Russell ok

    • @Its_AJ_
      @Its_AJ_ Před 3 lety

      Not daily yearly and they get replaced every 2 years