New Circle Line Train: Port to Depot

Sdílet
Vložit
  • čas přidán 10. 03. 2022
  • 🙋🏻🙋🏻‍♂️ Our new Circle Line (#CCL) train 🟠 🚆 has “travelled” from the port to Kim Chuan Depot!
    #PressPlay to catch up with the second part of its vlog here in Singapore. 🇸🇬📷
    Tag your rail buddies to share this exclusive video! 🤩
    #ThereRailBeMore
  • Auta a dopravní prostředky

Komentáře • 20

  • @vissboi_playz.
    @vissboi_playz. Před 2 lety +7

    Can't wait for the train to be in service

  • @gnjm_
    @gnjm_ Před 2 lety +2

    Yay I love all the new trains

  • @Cinnameldoy
    @Cinnameldoy Před 10 měsíci

    Can't wait for the train to be in service
    From Singapore 🇸🇬

  • @joephua9667
    @joephua9667 Před 2 lety +2

    wait a minute, isn't this the same train as the 3rd gen train on the North-East line?

  • @cecillecalauad9693
    @cecillecalauad9693 Před 2 lety +1

    2026?

  • @yaboyevan_0
    @yaboyevan_0 Před rokem

    Ahem u didn't have to scrap hispano

  • @alexanderwee2055
    @alexanderwee2055 Před 2 lety +1

    2026!?!? BRUH ITS ALR IN SG JUST RELEASE IT

    • @joofer.j
      @joofer.j Před rokem

      Too many trains on one line cannot must wait until got more room for more trains on the lines (not referring to depot)

    • @WarFigureSunlight
      @WarFigureSunlight Před rokem

      It also needs a serious amount of test before service

  • @Yamamba
    @Yamamba Před 2 lety +1

    Sorry, 2026? I thought we were supposed to be getting this in 2024 ;-;

    • @alexeyohms25
      @alexeyohms25 Před 2 lety

      2024 is NEL

    • @qikaigao3991
      @qikaigao3991 Před 2 lety

      @@alexeyohms25 that's bad... just leaving these trains for 4 years?

    • @alexeyohms25
      @alexeyohms25 Před 2 lety

      @@qikaigao3991 Ya, it’s actually bought because of the extensions. And operating extras train does not benefit the train company as it increase the cost and hence lesser profits. It’s like the unused MRT stations, they didn’t open it because they can’t see any potential benefits- the area is not developed yet etc.

    • @mikealstom0631
      @mikealstom0631 Před 2 lety

      @@alexeyohms25 they also wanna wait until train test facility ready and try it out with these trains

    • @alexeyohms25
      @alexeyohms25 Před 2 lety

      @@mikealstom0631 Yep

  • @Nijga305
    @Nijga305 Před 2 měsíci

    Opening 2024 and 2025

  • @aehighfmcolinchin
    @aehighfmcolinchin Před 2 lety +2

    That No Entry Banner must be removed by 2026

  • @svc143bsoe
    @svc143bsoe Před 2 lety

    Nice C851E on CCL, Its Way Better Than Crappy C830 and C830C

    • @sbsproductions2156
      @sbsproductions2156 Před 3 měsíci

      Those Trains won’t be replaced until some crappy KSF Chinese Versions of them like C830A (C830’s Replacement) and C830B (C830C’s Replacement) Comes out