Loss of Field Protection of Synchronous Generators | Example Using the SEL-300G Protection Relay

Sdílet
Vložit
  • čas přidán 11. 09. 2024

Komentáře • 11

  • @romeroengineering
    @romeroengineering  Před 6 měsíci

    Learn more with our online courses here: www.romeroengineering.co/courses

  • @surendrakverma555
    @surendrakverma555 Před rokem

    Thanks Sir for the excellent explanation. Regards

  • @user-xm3rc2uv5e
    @user-xm3rc2uv5e Před rokem +1

    love your content all way from Uganda

  • @haselec
    @haselec Před 8 měsíci +1

    What are the Xd/Xd's we should use, saturated or unsaturated?

  • @user-hx5tp3mu4n
    @user-hx5tp3mu4n Před rokem

    Thanks for excellent explanation! well done

  • @ksipcoa3824
    @ksipcoa3824 Před rokem +1

    good morning fron tu mexico good video

  • @BrunoMarcos-py6mr
    @BrunoMarcos-py6mr Před 3 měsíci

    How to convert the values of the spreedsheet from R-X to P-Q plan?

  • @gustavomarcelo7250
    @gustavomarcelo7250 Před rokem

    Hi.
    The commonly used method is the Offset Mho or RX scheme.
    Do you know what is the advantages and reason that Siemens invented LoE based on GB scheme ( admittance) , since GB and PQ is related, why not just measure the Q?