Amtrak Rearview Ride | Springfield, MA to New Haven, CT

Sdílet
Vložit
  • čas přidán 18. 05. 2024
  • Rearview ride onboard Amtrak’s Northeast Regional from Springfield Union Station (SPG) to New Haven Union Station (NHV).
    📣 Join the Railside Live Community 📣
    Subscribe to Railside Live and hit that notification bell to never miss a moment of the railroad action.
    CZcams: / @railsidelive. .
    Merch Store: railsidelive.creator-spring.com/
    🌟 Support Us 🌟
    If you're as passionate about railroading as we are, consider supporting our channel. Donations and contributions help us keep the stream running and bring you the best railside action 24/7.
    Donate Here: www.paypal.com/donate/?hosted...
    ❗ Our Content ❗
    This stream is copyrighted by Railside Live for the private use of our audience. Any other use of this content without the expressed written consent of Railside Live is strictly prohibited.
    Know a good location for a camera? We’d love to hear about it, if you have any contacts in the area, please email us at railsidelive@gmail.com
    All aboard! 🚆🎥🔴
    #RailsideLive #railfanning #amtrak #railfans
  • Zábava

Komentáře • 20

  • @TrainGal247
    @TrainGal247 Před měsícem +7

    0:00:01 Springfield Station
    0:01:15 Spring I/L
    0:02:50 Sweeney I/L (Diamond cross CSX to Pan Am)
    0:04:33 Riverfront Park Xing (Closed)
    0:08:54 Emerson Road Xing
    0:09:46 Birnie Road Xing
    0:11:32 Field I/L
    0:10:47 Mass/Conn Border
    0:12:00 Thompsonville
    0:12:32 Enfield Lumber Industrial
    0:13:38 Bridge Lane Xing
    0:14:15 Parsons Road Xing
    0:15:28 Warehouse Point Siding
    0:16:20 Connecticut River
    0:16:48 Windsor Locks Canal
    0:17:47 CSO Airport Branch
    0:18:12 Future Windsor Locks Station
    0:18:23 Old Windsor Locks Station
    0:18:35 CT-140 Xing
    0:19:00 Dexters Xing
    0:22:08 Current Windsor Locks Station
    0:23:55 Hayden I/L
    0:24:34 Hayden Station Road Xing
    0:25:06 Macktown Road Xing
    0:26:18 Pierson Lane Xing
    0:26:31 Farmington River
    0:29:10 Windsor Station
    0:29:22 Central Street Xing
    0:30:32 Island Road Xing
    0:32:27 East Barber Street Xing
    0:32:31 Windsor Defect Detector (MP 40.2)
    0:32:52 Meadow Road Xing
    0:33:13 Midland I/L
    0:33:50 CSO Hartford Yard
    0:35:34 Hart I/L
    0:35:42 CSO Engine House (On right behind the trees)
    0:36:11 CSO to East Hartford / Hartford Switch Tower
    0:36:30 Main Street & Albany Avenue Tunnel
    0:36:43 CNE Switch
    0:37:12 CNE Hartford Yard (Interchange with CSO)
    0:40:35 Hartford Station
    0:42:00 Hartford Courant Industrial
    0:44:13 Parkville Industrial (Still Single Track)
    0:44:24 Hamilton Street Xing
    0:45:44 Oakwood Avenue Xing / Wood I/L (Begin Double Track)
    0:50:06 CWPM Industrial (Trash loads)
    0:50:12 Willow I/L
    0:51:25 Pan Am to Plainville & Waterbury (On left)
    0:53:20 Berlin Station
    0:53:52 Unconnected wye segment
    0:56:00 Berlin Defect Detector (MP 24.4)
    0:57:45 Norton Lane (No access)
    0:58:16 Siding
    1:00:35 North Colony Road Xing
    1:00:43 Britannia Street Xing
    1:00:49 Meriden Yard
    1:01:52 Cross Street Xing
    1:03:47 Meriden Station
    1:04:23 East Main Street Xing
    1:04:28 Colony Street Xing
    1:05:08 Cooper Street Xing
    1:07:23 Holt I/L
    1:09:21 Pent Highway Xing
    1:09:35 Infra-Metals Industrials
    1:10:17 North Plains Highway Xing
    1:11:16 Parker Street Xing
    1:12:32 Wallingford Station
    1:13:37 Hall Avenue Xing
    1:13:42 Quinnipiac Street Xing
    1:14:08 Ward Street Xing
    1:15:51 Allnex Chemical Industrial
    1:16:09 Toelles Road Xing
    1:17:58 Private Xing (No access)
    1:18:25 Cedar I/L
    1:18:38 Siding
    1:18:54 CSX to Cedar Hill Yard
    1:19:13 Devine Street Xing
    1:19:18 Stiles Lane Xing
    1:19:45 Sackett Point Road Xing / Connecticut Container Corp. Industrial
    1:19:47 Siding
    1:20:15 Winchesters Xing (Modern Materials Corp.)
    1:21:24 Siding
    1:21:41 Lead to Amtrak Yard
    1:21:45 Benton Street Xing
    1:21:50 Amtrak / P&W Yards
    1:22:13 PVS Minibulk Industrial
    1:22:57 Lead to CSX Cedar Hill Yard / NEC (NHB) on Right
    1:23:37 Lead to Amtrak / P&W / CSX Yards
    1:24:12 P&W to Docks / Amtrak Division Post Approach Signals
    1:24:20 Mill River I/L Signals
    1:25:26 Amtrak/Metro-North Division Signals / CP 274 (Chapel)
    1:27:16 New Haven State Street Station
    1:27:33 CP 273 (Fair)
    1:29:30 New Haven Union Station

  • @harrygoldun5779
    @harrygoldun5779 Před měsícem +3

    Just viewed a video on the powered Metro liner cars, always wondered what happened to them, now I know!

  • @lechiffre1914
    @lechiffre1914 Před měsícem

    Lovely video with beautiful rural areas! Thanks!

  • @Lauren_Tyler
    @Lauren_Tyler Před měsícem

    I still remember the first time I saw a Metroliner car back in 2005. I was like, "What is that? I didn't know Amtrak had control cars!"

  • @KiingOfFlipz
    @KiingOfFlipz Před měsícem

    Lucky you got a smooth ride. I was stuck earlier today on 6401 CTRail from Hartford to New Haven because of the ATV crash.

  • @HiKing778
    @HiKing778 Před měsícem +1

    🔥

  • @user-np7se4cs6t
    @user-np7se4cs6t Před 26 dny

    Good ❤ اللهم صل على محمد وال محمد ❤

  • @Fliegermann777
    @Fliegermann777 Před 16 dny

    I have a technical question since I'm not a railroader. What makes the wheel RPM sound variation at @25:15-25:20? I have ridden a number of Amtrak trains across America and have enjoyed standing at the back. I have even heard the same sound from Superliners. It's like the wheels are suddenly speeding up and then slowing back down. I know they aren't powered trucks. Maybe a stupid question but just wondering for the past 20 years why I often hear that sound. Thanks

  • @nolantherailfan5048
    @nolantherailfan5048 Před měsícem +2

    18:21 what are they building? A new station?

  • @HarrisonPeloso
    @HarrisonPeloso Před měsícem

    how i like seeing this route aside regular windows

  • @SteveSnow1
    @SteveSnow1 Před měsícem

    New station construction just north of …
    Milepost 47.50 - Windsor Locks Station
    Two-track resumes
    Milepost 43 - Windsor Station & Freighthouse
    39:17 - Rte 91 - Hartford Station
    Two-Track resumes
    44:22 - Loram Rail Grinder
    45:30 - MOW
    Milepost 25.9 - Berlin Station
    59:57 - Overhead trackbed - abandoned? MOW
    Milepost 18.7 - Gantlet Track, Meriden Station
    Milepost 13.1 - “Parker”(Street?), Wallingford Station
    Milepost 11 - Sand or Dust kicks up
    “New Haven” style Catenary poles precede…
    Milepost 2 - Catenary starts, NEC Joins…
    New Haven - State Street Station
    New Haven Station

    • @TrainGal247
      @TrainGal247 Před měsícem

      The bridge at the 1 hour mark was part of the Meriden, Waterbury, and Connecticut River Railroad. It's now abandoned.

  • @jimcolleran1804
    @jimcolleran1804 Před měsícem

    Who owns this track?

    • @TrainGal247
      @TrainGal247 Před měsícem

      Amtrak for the majority until the end just before State Street Station. Then it's the MTA.

    • @jimcolleran1804
      @jimcolleran1804 Před měsícem

      @@TrainGal247 Thanks. Do you know if they are planning to electrify it?

    • @TrainGal247
      @TrainGal247 Před měsícem

      ​@@jimcolleran1804 Not in the immediate future as far as I know. The line still isn't completely doubletracked and that's more of a priority.

    • @jimcolleran1804
      @jimcolleran1804 Před měsícem

      @@TrainGal247 Thanks

    • @PeterBlack-nl5hy
      @PeterBlack-nl5hy Před 25 dny +1

      @@TrainGal247 Ct DoT, not MTA. MTA is a New York State organization. CT contracts with it to run New Haven Line trains on CT DoT owned tracks.