Bridge बनाने का पूरा Procedure समझे | Post Tensioning and Grout Ducting
Vložit
- čas přidán 31. 03. 2022
- #majorbridge #posttensioning #groutducting
Bridge बनाने का पूरा Procedure समझे | Post Tensioning and Grout Ducting
Download NOW: Reinforce Civil Engineers Learning App
👉🏻Android App Version: play.google.com/store/apps/de...
👉🏻IOS Version: apps.apple.com/in/app/myinsti...
Org code : avywj
👉🏻Web Version: https:web.reinforceqst.com/
For assistance and Queries you may call or whatsapp at +919711155585 , 9958731610
In this session, we are discussing,
• Segmental Box Girder Launching
• Seismic Arrestor
• Duct Grouting
• Post Tensioning
• Tendon Wire
• HT Wire
• HDPE Pipe
• Cone Head & Cone Cap
• Wedges
• Grouting Pump
• Gantry
• Hoist
• Slider
• Box Girder
------------------------------------------------------------------------------------------------------------------------------------------
Related Videos: -
1. Major Bridge में Pier Foundation की Drawing कैसे पढ़ते हैं:- • Major Bridge में Pier ...
2. Bridge में Abutment Foundation की Drawing कैसे पढ़ते हैं:- • Bridge में Abutment Fo...
3. Bridge में Structure Plan और Section की Drawing कैसे पढ़ते हैं?:- • Bridge में Structure P...
4. Bridge में Abutment Foundation की Drawing कैसे पढ़ते हैं:- • Bridge में Abutment Fo...
5. Plinth Beam का Site पर Execution कैसे करते हैं:- • Plinth Beam का Site पर...
6. PSC Girder (major Bridge) कैसे बनाते है:- • PSC Girder (major Brid...
7. Bridge Construction Procedure:- • Bridge Construction Pr...
8. Pile Foundation की पूरी जानकारी सीधे Site से :- • Pile Foundation की पूर...
9. Test on Pile Foundation ( Bridge Foundation ) :- • Test on Pile Foundatio...
10. Pile Cap (Double Mesh) का steel कैसे लगाते है? :- • Pile Cap (Double Mesh)...
11. Pile Chipping क्या होता है ? | समझे सीधा Site से :- • Pile Chipping क्या होत...
12. Pile Cap का steel कैसे लगाते है? :- • Pile Cap का steel कैसे...
13. AutoLevel के साथ Site पर Level कैसे करते हैं?:- • Auto Level के साथ Site...
14. One Way Slab की Practical जानकारी | Crank bar का marking कैसे करते है:- • One Way Slab की Practi...
For more updates join us
Telegram Channel: t.me/joinchat/F-LY5s4olDw2MjVl
Call or WhatsApp at +919711155585
Follow Us on; Facebook: / reinforceqstpl
Instagram: / reinforce_qst
Twitter: / reinforce_qstpl
#Groutingpump #Hoist #boxgirder #boxgirderlaunching #majorbridgeconstruction #Bridge #bridgeconstruction #Bridgeliveproject #sitevisit
My confusen is clear now after watching this video thanks for you forever blessings 🤲🏻🤲🏻
बहुत बढ़िया से आपने समझाया धन्यवाद
Subhanallah mashaallah alhamdulillah ❤
Bahut acchi video h, kaafi kuch sikhne ko mila
Best explanation I have seen so far about box segment launching
Very good information
Good video
thanks for creating informative video with animation
Good Explanation
Bhot shandar lecture sir
This Segment Launcher is of *DND-KMP Expressway* (NH-148NA).
Very good practical demonstration.
Though I am an Electrical engineer but girder bridge always fascinated me, thankyou for explaining.
Good information... thank you
Excellent
Hindi is difficult to understand. It is very good if you give the video in English. Your videos are very informative.
Thanks for good info.
Great video bro
Best video till now👍
Thanks 👍
Awesome explanation
Very nice
Thankyou for the awesome explanation 😊👌
Thanks you gurudev 🙏🙏🙏🙏🙏
So helpful for metro project
Good sir 🙏🙏🙏🙏🙏🙏
Bah
Nice video sir
Good sir thank you
Very nice programme to get the activities . When the hdpe ducts are grouted the same is not get in contact wirh the main conc. Will there not be a chance of sleepage between the hdpe pipes and conc ? Means the strands will not be held tight with the main conc. Can it be ok ?
nice video
Good
Thank u sir
Ok sir
Mystry solved for me thank you.
Sir enka rainforcement kaise nikalte hai pura details me video baneai na
Good video.
I have just one doubt. How is thermal expansion/contraction of the tendon wires compensated to keep the bridge deck level and rigid?
Thanks a lot for the information, but I have one question if one side all the vehicles are going and otherside no vehicle movement the how the center of gravity is balanced
Is the post tensioning done on both the sides of the span of just on one side?
Ye kon sa seemant hota hai istemaal karne wala
Instead of single span girder why multiple girders are used?
My guess is for the convenience in transportation. Multiple girds can be transported easily as compared to single span.
Such type flyover bridge is now construction in progress Ahmednagar city..Mah.
Yes Dadasaheb
❤
Sir pier se duct ko kese attach kiya jata h
Mere pas b jhi wala louncher chal rha hai
Segments glued with each other?
Sir launching ek side se ni hoti load ko dono side same rkha jata h to ek segment A1 ki side lift hoga to dusra A2 ki side aise hi process chelega plz correct this
कोई मुझे बताए कि ये जो बड़े बड़े ब्लॉक्स लटका रहे है वे कैसे लटक रहे है?
kya Wire ko pull karke tension dene se blocks mein crack nahin aata n why's it's necessary to give tension.
Because girde casted from prestress concrete.
Thise girder not casted from ordinary concrete.
Concrete tension me weak hota hai isliye isme cable ka use karke compression bhara jata hai taki aage jakar jab ispe tension aayega tab sabse pahle compression zero hone mai kuch tension hat jayega aur bacha hua tension bridge bear kar lega ( agar bacha to)
The photo behind you is of segmental bridge right ?
BRIDGE ki load calculation kaise nikaley .. step by step for DPR ...
LHS OR RHS KO SAMJHAYIYE SIR G
LHS matlab left hand side
Rhs matlab right hand side
मैं कांट्रेक्टर हुं अगर मैं ये काम करूं तो एक स्पेन का क्या रेट मिलना चाहिए मुझे कृपा करके बताए अगर साइट बिहार में हो तो मुझे कितने रुपए प्रति सपैन लेना चाहिए जरूर बताएं
I am Civil engineer,3 years experience in construction field any requirements in civil engineer
Depends on economic span
Post tensioning eak side s hi hota h ya dono side s hota h?
One side se...ek side se wedges se phansaa dete h jise dead end kahte h aur dusri taraf wedges lagakar hydraulic jack lagaake stressing karte hai jise Live end kahte hai...
@@livingoodlife ok thanks brother .
@@livingoodlifehey brother did we do post or pre tensioning in deck slab also?
Voice slow hai apka
Voice bilkul thk ha...
Agar ek wire bich mai Tut geya....to
23 hai total ducts aur tutega ek to pta chal jaayega...baaki aisi problem aati nahi
Nitish kumar watching this video 😂
App khud confused hai aapka line clear nh hai... Aap apne ek sentances ko sunyh... Point by point nh hai.
Lack of experience in teaching was observe. And rest of thing was great from your's team .
Kuchh bhi to nahi dikh raha hai...apka explain view
Why you give wrong information to everyone
Segment