First Run In 5 Years: AA5

Sdílet
Vložit
  • čas přidán 27. 10. 2023
  • The Grumman Traveler hasn't run in over 5 years.
    Major work, including a primary Structure repair to the fuesulage, major engine work, and fuel tank sealing has been completed.
    At one point the airplane was scattered over 5 locations as it was moved around and placed in storage for a few years before commencing repairs.
    Test flight coming soon!
  • Auta a dopravní prostředky

Komentáře • 6

  • @katahdinkatahdin
    @katahdinkatahdin Před 8 měsíci +1

    Hi James great 😊to see your tube vids back up.bob

    • @fastbackflying853
      @fastbackflying853  Před 8 měsíci

      Thanks. I have lots of editing I can do just not enough time and i need a new computer! I could do with a couple of extra days in the week lol

  • @timbacchus
    @timbacchus Před 8 měsíci +2

    now check the compression. The type I learned to fly in in 74

  • @davidpowell7614
    @davidpowell7614 Před 8 měsíci +1

    Hmm, maybe it should be scattered over 5 locations again! The lesson here: definitely get a pre-purchase, don’t spread your dismantled aircraft over the county, and avoid old plastics and composites! Not the most fun wrenching, but it’s done.

    • @fastbackflying853
      @fastbackflying853  Před 8 měsíci

      This year I've completed four post purchase inspections on aircraft which seems very backwards

  • @CFITOMAHAWK
    @CFITOMAHAWK Před 7 měsíci

    Change all the liquids again after. You will fing rust in it. I also put Dura Lube on oil.