Model Railway Construction: Laying track across the lift-out bridge

Sdílet
Vložit
  • čas přidán 1. 07. 2024
  • A New Year update from Dongits Model Railway, showing the progress of construction over the Christmas period. The four track mainline is laid from the south side of the room across to the north side via the lift out bridge.
    Table of Contents:
    00:00 - Intro and Review of current situation
    00:27 - Detail design, marking out
    03:29 - Laying the rest of the hidden track
    05:39 - Laying track on both sides of the bridge
    07:30 - Soldering rail to PCB sleepers
    10:16 - "Gluing" plastic chairs to wooden baulks with MEK
    13:50 - Cutting the lift-out bridge back out
    15:56 - Completed bridge
  • Věda a technologie

Komentáře • 15

  • @JamesPetts
    @JamesPetts Před rokem +2

    Audio massively better than previous videos.

  • @ModelRailwayShed
    @ModelRailwayShed Před rokem +1

    Very impressive bridge great work.

  • @howardpomfret2950
    @howardpomfret2950 Před rokem

    Bridge is fantastic. Sound very good

  • @TimsBitsnPieces
    @TimsBitsnPieces Před 7 měsíci

    You are definitely making headway.... and it is showing.

  • @chrissouthgate4554
    @chrissouthgate4554 Před rokem +1

    Good Audio, Thanks

  • @James-ih4gz
    @James-ih4gz Před rokem

    came over from Jennifer's channel this is awesome layout

  • @dundasjunctionmodelr.r-jam8267

    Very impressive bridge build , going to subscribe to your channel, excellent details on the build

  • @pedros270
    @pedros270 Před rokem

    *Congratulations, explanations and perfect development,
    A query from Spain, where did you get the base grill for the bridge?*

    • @DongitsModelRailway
      @DongitsModelRailway  Před rokem

      It's part of the kit. The bridge is two of these, side by side:
      laser-model.store/product/00-gauge-28-711mm-twin-arched-girder-railway-bridge/

    • @pedros270
      @pedros270 Před rokem

      @@DongitsModelRailway Grateful for the information and contact.

  • @samuelmcshane6669
    @samuelmcshane6669 Před rokem

    I am considering having a 2 lane track above my original 3 lanes. What height would you suggest is a suitable height to allow access if anything went wrong on the bottom rails

    • @DongitsModelRailway
      @DongitsModelRailway  Před rokem +1

      Assuming the lower three tracks are effectively hidden loops/sidings/tunnel, you want enough height to stick your arm in above the stock and below the baseboard supports above. You can get away with less if the distance is short.

  • @samuelmcshane6669
    @samuelmcshane6669 Před rokem

    Sorry small spelling mistake

  • @Andries1963
    @Andries1963 Před rokem +1

    Your vocal audio is excellent one of the best I’ve heard however if you don’t mind me saying the dead bits of total silence are not so good I personally like a gentle bit of incidental music in the background to fill in as for the context of your video I found it very good , quite informative 👍

    • @DongitsModelRailway
      @DongitsModelRailway  Před rokem +1

      Thanks. Sounds like I made a good technical decision then, even if not necessarily a good financial one...