Video není dostupné.
Omlouváme se.

Pete Watermans - The Final Frontier, A 208 foot long OO scale model railway

Sdílet
Vložit
  • čas přidán 7. 03. 2024
  • Pete Waterman's Making Tracks - The Final Frontier
    In this video:
    • Chris surprises me with a new car model and a celebrity car.
    • Updated views of the new viaduct.
    • Paul continues flocking.
    • Dave and Robin refit backing boards.
    • Pete fits 23,000 insulators (and moans about it!)
    • Peter discusses wiring (and how he loves it)
    • Chris reveals the new MegaPoints Controllers tail lamp flasher.

Komentáře • 14

  • @Avondaleandhalshawmoor
    @Avondaleandhalshawmoor Před 5 měsíci +2

    All the small subtle details make such a difference......coming together brilliantly!

  • @AiMedia24
    @AiMedia24 Před 5 měsíci +2

    Pete is a born leader. Absolutely love the man

  • @AiMedia24
    @AiMedia24 Před 5 měsíci +1

    Thank you for all the videos I love the chat . Always happy when a new video is uploaded. Thank you very much

  • @TheDaf95xf
    @TheDaf95xf Před 5 měsíci

    Again another cracking update Dave on what’s going to be the biggest model railway ever 😊 Pete was 100% right nobody could replicate this on their own especially as this is recreating the real thing 👍🏻 I’ve got my tickets already woohoo 🙌🏼

  • @dsj672
    @dsj672 Před 5 měsíci

    Super video as always. Can't wait to see the finished product.

  • @paulmacey9084
    @paulmacey9084 Před 5 měsíci

    absolutely brilliant

  • @oninbridders
    @oninbridders Před 4 měsíci

    Why are they soldering cables? You can crimp them in a second. My go-to is telephone (BT) jelly crimps. More cost but less time. You don't even have to strip the cable. The jelly makes them waterproof.

  • @jbhtrams
    @jbhtrams Před 5 měsíci

    Pete. How many fingers have you lost with that track cutter????😮😂😂😂

  • @Cookie2k
    @Cookie2k Před 5 měsíci

    Another cracking video Dave. Put me down for a couple of dozen EoT circuit boards please mate! 🙂

  • @paulharrison1753
    @paulharrison1753 Před 5 měsíci

    Great update. I am looking forward to seeing the layout soon at Key Model World. At Blisworth, should there not be a trap point protecting the exit of the track machine siding? Cheers Paul

  • @AussiePom
    @AussiePom Před 4 měsíci

    208 feet is just over 63m for those of us who work in the metric system.

  • @tehklevster
    @tehklevster Před 5 měsíci

    That's defo a leaded solder according to the Wartons website. (@16:05) Lead free or ultra low lead solders are useless for non-professional manufacturing use.

  • @bedfordlab
    @bedfordlab Před 5 měsíci

    Where's Phil??

  • @davidrice6075
    @davidrice6075 Před 4 měsíci

    OMD, does he ever shut up?😊