Post Tensioned Beam Installation Procedure at Site 🔥 | Components of PT Beam | Kavin Associates
Vložit
- čas přidán 11. 05. 2023
- #construction #home #beam #kavinassociates
For PT works Contact:
SF Engineering India (System) Pvt Ltd,Chennai
9790921280
They are doing PT Works all over India & Abroad at reasonable price.
Ground Water Table Problem Solved ✅ | Types of Pedestal | When to go for PT Beam Designing ?
- LINK - • Ground Water Table Pro...
WATCH OUR LATEST VIDEOS:
Transfer Girder with Floating Column 🔥 | Reinforcement Checking at Site | Hosur | Kavin Associates - LINK- • Transfer Girder with F...
Nibav Vacuum Lift For Home 🔥 | Make your Home Luxury 😍 | Complete Tour and Customer feedback 😱 | KA - LINK - • Nibav Vacuum Lift For ...
₹2.15கால் லட்சம்னா சும்மாவா🔥| Live Testing at Site ✅ Using Original Schmidt Live Rebound Hammer - LINK - • ₹2.15கால் லட்சம்னா சும...
WATCH OUR LATEST REPAIR SERIES VIDEOS :
1.Column Strengthening Using Carbon Fiber Wrapping | Repair of Fully Corroded Column | Micro Concrete - LINK - • Column Strengthening U...
2.வீட்டில் வரும் Wall Dampness-ஐ தடுக்கும் முறை 😱 | 100 % Solution | Repair Series | Kavin Associates - LINK - • வீட்டில் வரும் Wall Da...
3.Terrace Floor-ல் வரும் Cracks, Water Leakage-ஐ எப்படித் தீர்ப்பது ? | PU Injection Method | 100% - LINK - • Terrace Floor-ல் வரும்...
For Business Enquiry, Collaboration & Promotion - WhatsApp me - 9994087571
Camera used for shoot - #iphone13promax
App used for editing - #vneditor & #canva
#youtube #youtubechannel
If you like this video - Like, share and subscribe to my CZcams channel... LINK - / kavinassociates
Share this knowledge to your friends and learn new things everyday and make your skill stronger...
Follow me - / kavinassoci. .
Like me - / kavin1011
FOR QUERIES & DETAILS: Mail us at - kavinprivin5@gmail.com
#housedesign #homeconstruction #homeideas #construction #building #hometips - Věda a technologie
Very Informative sir....The shape of tendon profile is given based on the BENDING MOMENT of the BEAM and Tendons are given based on calculating the losses due to the Post tensioning and also the PT increases the life span of structure while tensioning of beam rod.
Thank you sir 😊
Ultimate தலைவா....Such a Great. Person Always
Thank you 🤩
Thank you. Voice too low at the end of video not audible
Very much interested to learn and execute your ideas in construction field sir. Myself is an civil engineer. I have been watching all your videos regularly. Recently i have executed the same idea for pedestal footing by watching your vedio sir. Thank you for sharing your knowledge with us. Keep going sir😊.. We all will support you😊
Thank you sir very useful with clear instructions 👍
Min cube strength cube for stressing is 25 mpa as per British standard
Very great effert educative and informative for all junior level well done sir
I had done it
Thank you sir 😊
Very use full site video sir
PT structure beam
Tq so much sir
Thank you sir 😊
Speach sound very Low sir. But good message.
super always ultimate good video and editing bro post more videos
Thank you bro ☺️
You doing great job sir ❤
Thank you sir 😊
Nice explanation
Thanks you 🤗
Very useful information sir. Sir if any code book for pt slab and beam
Useful content 👏
Thank you sir 😊
Good information 👍
Thank you sir 😊
Hi Kavin Sir,
Please provide level 1,2,3 course material in book form ??
Super brother, i am also a civil engineer.
Thank you bro ☺️
Super sir
Thank you sir 😊
next level stuff
PT slab video please
GI pipe length enthana Feet varum...
Live endla joint panni antha tendons minimum length evlo Veliya irkanum bro
New information
Thank you sir 😊
And sir Antha floating column purpose enna nu sollalaye .
Sir pls give me a explanation, in some of the engineering videos saying near beam column joints beam rods should be cracked and to be inside the column ne is it right ? pls urgent
Only 12,16 mm rods can be taken outside of column…because of larger dia like 20,25 mm rods it should be cracked into column then only you can get cover for column…so only if column rods are more congestion it’s necessary to increase the column width
@@KavinAssociatesOfficial thank you so much
One more doubt sir, i had heard that incase of PT Slabs the concrete should attain 80% of its grade strength at the end of 7 days in order to do PT
Is it true sir??
Yes 75% ok
Inside GI pipe it is rope not rod
I presume , tendon covering ku use pannathu GI illa flexible duct sleeve nu
Yes it is GI duct
Brother 20mm rodla belt. 12 mm rod coloum podalama? Plz sollunga.
Why 20 mm for belt ? Use 12 mm
Sir roof la beam podamal katti irunthal atharku ethana floor max eduka mudium sir
It’s depends on your building strength…have to check
Bro...apo PT beam oda load transfer conventional column laye pannuvangla...
Yes
I studied in my bachelor's degree minimums grade of concrete should be grater than M40 So please confirm again as per IS Code
M40 grade for pre-tensioning
but here for post-tensioned beam mini grade M30
🙂
M35 is the starting grade to be used in PT works bro
I want to construct 60 feet long beam between 2pillars. How many steel bars should I use, and what size of requisite
between two pillars is 60 feet span possible...?
reply bro please
single floor 40 feet hight slab
It’s possible only in PT not in conventional beam sir …
@@KavinAssociatesOfficial thank u bro
what is the cost for 60×40 plan design....?
kindly can you send what's app number
Job vaccancy eruka sir
Is that possible in clay soil.... Lower level sbc clay soil
Soil type does not have any influence on the PT system.
In market 12.2m lengths of rod only available how to active 42feet rod
Special length can be bought by ordering specific length from the steel company
Bars will be lapped at appropriate locations for larger spans
How many floor will do same way
This building is G+2 floors
We can use this method upto 24 slabs
Reference is 1343
1 rod length is 39 feet ,how 42feet single rod laid?
In market if you order they will supply single reinforcement
Bro is walking on a site with crocs no safety shoe lol
This work five year i am working Singapore job vacancy sir
Mos, dos , ippo Dan puriyidu .
Thank you for your efforts in making very detailed videos. Learning a lot from your videos. 😊
Thank you sir 😊