First Opening of the iDry Kiln and Setting up Rail and Trolley

Sdílet
Vložit
  • čas přidán 8. 09. 2024
  • www.brueggensbees.com
    Facebook: Kingwood Bee Removal
    Facebook: KB Custom Cabinets and Woodworking
    Finally! We open the kiln to see what's inside, and get it ready to load!
    My Standard Workware:
    Carhartt Pants: amzn.to/2HAwrPK
    Carhartt Shorts: amzn.to/2FKRT46
    White Tee ("Stay Tucked"): amzn.to/2DuoARu
    Muck Boots: amzn.to/2HBWplQ
    Leather Boots: amzn.to/2pbV8vd
    Holster: amzn.to/2HAU8Y7
    Sheffield Pocket Knife: amzn.to/2penG6g
    The packaging is quite simple really. Just the track extension, jumpers, and the trolley. I used the tractor to ease the whole package out of the kiln, then, with some clever rigging, flew it a short distance to set it down a bit gentler on the ground.
    I eyeballed the alignment on the track extension, and then checked corner to corner with a long tape to ensure it was square-ish. For now I'm going to put down oak boards as the spanners for the feet to sit on in the dirt, but eventually will pour concrete footers or get concrete pads for the feet to sit on to keep it all level and square all the time.

Komentáře •