BAUER Group - Diaphragm Wall Method: Cut-off Wall

Sdílet
Vložit
  • čas přidán 22. 08. 2024
  • Diaphragm walls serve a structural and/or sealing function and can be used both as a cut-off wall for a dam or excavation pit or as foundation for or to encapsulate a building. At the Forggensee lake in Bavaria, a total of 13,500 m² of diaphragm wall was constructed using a BAUER MC 64 and MC 96 duty-cycle crane to seal the Roßhaupten barrage.

Komentáře • 2