Using Pipe Laser to install HDPE pipe.

Sdílet
Vložit
  • čas přidán 15. 02. 2023
  • Setting storm for a parking lot. Using the pipe laser to guide the ditch and pipe. HDPE set in stabilizer sand .
    #ThomasConstructionTexas #PipeLaser #ConstructionInHouston
  • Jak na to + styl

Komentáře • 39

  • @bonnieewart9954
    @bonnieewart9954 Před rokem +3

    Glad to see the Thomas Construction Videos
    There’s a world of difference and playing in the mud and working in the mud .
    Know matter what you are doing you always get the job done
    Keep the videos rolling

  • @claypearson8380
    @claypearson8380 Před rokem +2

    From one utility contractor to another, this is a outstanding video

  • @idiaminlia
    @idiaminlia Před 21 dnem

    ur videos are awesome

  • @friendlybill6109
    @friendlybill6109 Před rokem +1

    Thomas, you always make interesting videos. It’s nice to learn about what you do.
    Thanks for posting.

  • @christopherriddle2734

    Love these videos!

  • @kdogjalapeno
    @kdogjalapeno Před 6 měsíci

    Great video.

  • @technicalitems731
    @technicalitems731 Před 4 dny

    👏🏼 if you have your pipe laser back behind at a distance from the concrete box you are starting from....how do you know what height to have that laser at to start from? Wouldn't the last need to be inside the first pipe inside the box? Or a specific measure up height from flow line of pipe? Just seems like it would throw the laser off if starting point for last is back a distance behind starting box. The only way you could do the distance behind starting box would be some fancy math right? You could place laser over starting pipe flow line in box and reverse the slope a few feet between it. Move laser back. The go back to positive slope? - - second question, how does one decide to use hdpe instead of concrete? Would this be a parking lot with only passenger cars? Delivery trucks? - - what geographical region is this?? Here in NE Georgia we have clay and rock mostly. Washed 57 under most pipes. - - thanks for this video. Very educational.

  • @GRUBB-MUDD
    @GRUBB-MUDD Před rokem +1

    I'm going to go ahead and say congrats on the 1000 subs bro! I know you are only 2 away and you should be there. By the morning! Now it's time to start producing that content! You have worked hard and stayed with it and I just wanted to be the 1st to say congrats man! Hope you don't get upset that it was a tad early

  • @kdogjalapeno
    @kdogjalapeno Před 6 měsíci +1

    I saw the plans ,ostly called for a .30%. Did you set the laser at .26% (video mark 1:29) because the laser was further back than if starting at the catch basin?

  • @Xifferent
    @Xifferent Před rokem +1

    I’m number 12 on the out of work list at my local laborers union. I really hope I get sent to another pipe job.

  • @claypearson8380
    @claypearson8380 Před rokem +2

    What y’all know about that Dawn Dish detergent baby!!! 😂👏

  • @Emezepe3
    @Emezepe3 Před 2 měsíci

    Isn’t flow line the bottom of the inside of pipe and then you add thickness to get the true bottom of pipe ?

  • @MidwestOutlaw86
    @MidwestOutlaw86 Před 2 měsíci

    Ive never set a pipe laser up on the ground like that, but may be easier to line it up that way. 🤔

  • @centerbuilder7677
    @centerbuilder7677 Před rokem

    Good to know! I’m starting my project in 2 weeks.

    • @thomasconstructiontexas
      @thomasconstructiontexas  Před rokem

      Good luck!

    • @centerbuilder7677
      @centerbuilder7677 Před rokem

      @@thomasconstructiontexas we have to set 4 type 2 catch basins. 16 ft deep. It’s definitely fun. Look up lever monkey in you tube. He’s out of California.

  • @mckaynelson7085
    @mckaynelson7085 Před rokem

    Your my favorite when you gonna hire me?

  • @marvingomez5522
    @marvingomez5522 Před 4 měsíci

    How do I get my grade for my manhole after HI?

  • @garrettmckinney9630
    @garrettmckinney9630 Před rokem

    Do you always set your pipe laser on top of your trench?

    • @thomasconstructiontexas
      @thomasconstructiontexas  Před rokem +2

      Most of the time we do. The reason for that when you take the pipe and it's been laying in the sun and you put it in the cool ditch, the humidity will make the laser dance around. At that point, you need to put a fan blowing through the pipe to keep it from doing it. So it's just as easy to put it on top and not have to deal with that.

  • @roelbuentello9138
    @roelbuentello9138 Před rokem +1

    Tips on setting the catch basin I’ve been setting them with the same fl of my pipe is that correct?

    • @thomasconstructiontexas
      @thomasconstructiontexas  Před rokem +3

      By being able to set the pipe up or down in the inlet box, it gives you the freedom to match the top grade. Risers come in 6 inches 12 inches. So by where you place the pipe in the box, you're able to leave yourself with even 6 inches, 12 inches or 36 inches whatever it works out too. If you raise the pipe in the box, you need to go put cement in the bottom so you don't have standing water.

    • @roelbuentello9138
      @roelbuentello9138 Před rokem

      Thank you

    • @roelbuentello9138
      @roelbuentello9138 Před rokem

      Great content

    • @nickit22
      @nickit22 Před měsícem

      And he even responds!

  • @ads221430
    @ads221430 Před rokem

    Always do the math and double check the percent the EOR states on drainage/paving sheet

  • @dubs08r6
    @dubs08r6 Před rokem +1

    Its all hdpe by you no rcp or sdr?

    • @thomasconstructiontexas
      @thomasconstructiontexas  Před rokem

      It's just the way the work comes down the line. Today we started clearing 93 acres.

    • @dubs08r6
      @dubs08r6 Před rokem

      @@thomasconstructiontexas most of the storm in ill is rcp

  • @dane9175
    @dane9175 Před rokem

    Pipe Laser are expensive A necessary tool. Your subscription count has moved hopefully that's a good sign for the future.😎

  • @whoami7900
    @whoami7900 Před 7 měsíci

    Non union