Latest August 2024 Updates on the RTS Link Singapore and Johor Bahru

Sdílet
Vložit
  • čas přidán 8. 09. 2024
  • Welcome to another episode of The Biannual Travellers.
    Check out our sub channel for more food videos:
    ​www.youtube.com/ @wonderingpassport
    Check out our Facebook page for updates: / thebiannualtravellers
    This is not a sponsored video. All reaction are based on first hand reaction to the event taking place.

Komentáře • 23

  • @hamiltonastan
    @hamiltonastan Před měsícem +3

    what a huge progress in the RTS project! according to SG Yap, the CCCC's launching girder doing the JB marine viaduct will be retracted back to its original launching position once it has fully erected the final span towards pier #45 and relaunch for another 2 spans through the ongoing casting transitional pier. thus, CCCC follows the footsteps of Sunway's launching girder 1 which has 3 more spans towards its final point close to the CIQ building.
    it's very interesting to see how the individual girder boxes are locked each girder as well as the side walls installed at the edges of the viaduct to prevent the RTS train from falling off. you can join SG Yap in showing us on the CCCC's launching girder retracting back to its original launching position.

  • @keka9117
    @keka9117 Před měsícem +3

    An absolutely fascinating and informative progress update. I am thoroughly enjoying watching these videos. Thank you!

  • @ASimpleVideoSG
    @ASimpleVideoSG Před měsícem +1

    Very nicely done video about the progress of RTS Link 17:52

  • @redstar19
    @redstar19 Před měsícem

    nice update. thank you!

  • @porchua2428
    @porchua2428 Před měsícem +4

    工程顺利完工再提前!加油!

  • @edx9364
    @edx9364 Před měsícem

    good video! keep it going!

  • @ngkimsan2854
    @ngkimsan2854 Před 19 dny

    Great news to reduce traffic jams loosen the volume in transports physically, ground, land and future air may use for air transport, by that time roads are useless only for produces deliver, lighter produces may deliver by fly machines to transports reduce traffic jam and economy effectiveness improvement, cheers future plan and design functions to forms or forms to function urban design

  • @marktan3668
    @marktan3668 Před měsícem +3

    The box girders do not look intimidating, quite tall, slim, ‘clean’, innovative. JB will look like KL, now.
    Woodlands side mostly underground.

  • @shasanmaz
    @shasanmaz Před měsícem

    interesting video, you are patient to wait until the placing of the final girder. Thank you for your effort.

    • @thebiannualtravellers
      @thebiannualtravellers  Před měsícem +1

      Haha, thank you for the recognition it took a total of 6 hours for the remainder box girder to be lifted and for all to be locked in place.

  • @bukhrin
    @bukhrin Před měsícem

    They're called parapet walls

  • @termitesarenotgoodforhomes

    Very well made video. Does anyone know if JB Sentral will become redundant or will remain part of the inter-city rail network.

    • @thebiannualtravellers
      @thebiannualtravellers  Před 27 dny

      JB Sentral will be connected via ETS to KL and beyond.

    • @termitesarenotgoodforhomes
      @termitesarenotgoodforhomes Před 27 dny

      @@thebiannualtravellers Sounds great. Thank you. The existing immigration point will stay active for a while but the Shuttle Tebrau is my first choice. It's a bloody long walk to the normal immigration area.

  • @aaafiiqqq8791
    @aaafiiqqq8791 Před měsícem

    the metal bracket installed towards the side viduct for wiring n plumbing looks ugly, its should be inside..

  • @afizi1213
    @afizi1213 Před měsícem

    1:52 wauuu they build pedestrian???

  • @paulrubens3048
    @paulrubens3048 Před měsícem

    waiting for a good laugh when Malaysia says
    "eer, we have ONLY 1 ESCALATOR out from RTS"
    WE DIDN'T know it would be a bottleneck.
    HAHAAAA

    • @sharxM16
      @sharxM16 Před měsícem +1

      are sure malaysian say that not singaporean🙊

  • @Badgyuu
    @Badgyuu Před měsícem

    when the elevated art project will start?

  • @afizi1213
    @afizi1213 Před měsícem

    5:26 heii do you know what they want to build under rts ???

    • @thebiannualtravellers
      @thebiannualtravellers  Před měsícem

      The lower part of the RTS viduct will be an elevated linkway to the RTS bukit chagar station.

    • @afizi1213
      @afizi1213 Před měsícem

      @@thebiannualtravellers so many shop will build la in there 😄 or just some land view