- Here is the Final Farm Chains episode where we finish the shop mezzanine buildout with a stair case build in there. I didn't show the whole railing installing knowing I just put out a railing install video. If you guys would like that anyways, drop a comment below in the comments
RR Building Post Frame Building Plans
rrplans.bigcartel.com/
ISOtunes Hearing Protection
bit.ly/2PoXSBw
You are the first person I have seen using tape instead of PT lumber. Don't know if that meets code but it definitely should. I'm proud of you for doing/showing that.
May be good for some situations but if there is a leak or something that creates water above a mm that wood will be compromised
Nice to see Greg wearing his "Iowa Lakes" sweatshirt!
Great content, love the commentary and detailed description of the rational and purpose behind the building process.
Great video! I really appreciate you keeping the camera rolling when you ran into issues on the real life job site and how you corrected or improvised/improved on as you went along. Too many times videos edit that out and that’s just not real. Thanks again, you rock brother!
I agree 100% I think it's great that they show, even the pros make mistakes. They recognized it, fixed it and moved on. They could have easily edited that out but didn't. Good honest contractors
Y’all are just so fun to watch. Top tier infotainment. 👍
I love channels that keep it interesting without talking too much you also do a great job. I am not a carpenter, I’m a writer, but everything looks great to me. Keep it up!!
Thanks for sharing your work and teach us alot of skilfull Trick. Greetings from Honduras in Central America.
My pleasure!
Can we see a short of kyle having a talk with the plumbing sub
about drain line placement?
Lol
That’s a Freakin Awesome Mezzanine Brother. You guys done a Awesome job on that deck, can’t wait to see the whole building when it’s done!!!!!!
That wall placement error would have had me sent. How that happens is mind-bending.
what the pipes not in the right place?
I agree but shit happens in real life that makes you scratch your head sometimes
I like this railing more than the cable one, so count me as a vote for seeing this railing put together and installed.
Nice to see that finally learned how to build a fairly proper set of stairs!
I'm not a framer, but I thought you always have to have double top plate to set the floor joists on? Great video. Thanks for great info and entertainment!
That timbertech railing looks boss on this application.
This was awesome.
I believe that the "smile" curls more over time as it dries, not relaxes. (This can be seen more quickly over time with deck boarding placed outside.) Smile up I've seen curl more, ending up with a puddle of water in the center of each board. I believe the boards would be better placed with a "frown" so the high spot remains in the center.
Thats the way i was taught was to put the frown down. Especially when doing out side decks. When i build decks anymore i push for trex
Correct. Crown up = frown down
I just removed my garage steps and planed them flat/re-stained them. Might be good to not use glue so you can do this?
Joists should always be installed crown up.
That’s is a great job guys I just got curious on the LVL hanging on the back wall just attach to the posts on 8’feet splits
Great job as always guys. 👍👍🏴🏴
Another fantastic video! Lots of tips to follow on my current build with Paul (Mr. PostFrame).
Lovin' the Bob The Builder time lapses 😂😂
I hope I get the opportunity to build my own home. Can't make money fast enough before the world goes to hell, it seems. I'll enjoy these videos in the meantime.
Love to see the channel growth! Seems like you just hit 1M and now already at 1.5. Shows that your content, quality, and the way you teach is excellent. A couple other channels I watch have mentioned you in their videos because they learned something and are applying it to their build.
That’s awesome
Just 2 months for 2 guys to build this building is crazy impressive! Would you guys be willing to do a breakdown of what this project costed vs what you sold it for? Just want to get an idea for cost.
@@david-ow3nv chill
I really enjoy watchin u guys videos. U do great work
I really like this railing over the cable one. Like to see an install video of this one.
Looks good!! Very quality work as always!!
The sound in this reminded me of playing counterstrike.
You guys are amazing
Large arrow stickers/decals in bright colors onto which you can write stuff like WALL might be a good investment
Love the black ceiling
Love the time lapse 👍
This is why you unfortunately have to be there and watch the other trades. Sucks but you made it work.
This was definitely one of those days
Keep up the good work! Love these vids.
What supports your ledger just a couple sds screws into the 6 x 6 with a 2 x 4 underneath not much order support for that size of a balcony. Typically a ledger should be supported 16 inch on center with 5/8 lag bolts started into a solid wall, do you put any vertical pieces going down in between your 6 x 6 post to help support the Legerdemain ?
Outstanding work
I just love your video's Kyle! Keep up the good work buddy! 😁👍🏼😁👍🏼
You guys are awesome!! Love your videos!
Hallo aus Deutschland!
So clean, really nice.
You got the graim issue with the stair treads reversed. You used the analogy of a smiley face (grain up). Its actually the other way around. Grain will shrink into the into the board resulting in cupping. The proper analogy should have been a frown face. Im sure you know that...just got reversed when explaining. Happens to the best of us. Its a great point though that not all carpenters realized. It didnt really sink in until I started milling my own lumber.
With that said, your work is exveptional. Keep it up boys!
Great job guys. Keep it up!
The wall is off one foot? You may want to explain what burn a foot means. I'm so glad that you are man enough to show that mistakes happen and they need to be delt with promptly and efficiently. Thanks for leaving that (moving the window) in!!
lol...wall wasn't off a foot...plumbing was off a foot
You guys do good work looks amazing
I made to 15:45.
Invest your focus in building. Let go of the lazer and develope your team synergy. Once you and those around you can filter the communication amongst yourselves the process will become clockwork.
Happy Turkey day ; )
The editing on the timelapses with the relevant noises is amazing. great video
Woo RR HQ!
Y'all make it look so easy :P
Do you have to adhere to stair railings code of any opening be less than what a 4" sphere will fit? Looks like where your rise and run meets bottom rail is more than 4".
FYI those who missed the math about figuring rise, 108.75 divided by the average between (code is between 7" & 8" (7.5") = 14 1/2" then round up ^ to 15 risers, 108.75 divided by 15 = 7 1/4" for each of 14 risers. The last riser will be up to the landing. Take off 1 1/2" for 1st tread at bottom. If you don't round up ^, your top tread will be at the landing height and each riser will be 7 3/4". This is where a lot of people mess up.
Code for most places are, Rise 7" to 8", Run 10" to 12" Railing height from front of 2nd tread 36" to top of railing & any openings shall not exceed what a 4" sphere would fit into. Sometimes, also first & last rise can be different, but all intermediate risers shall be uniform. This is because we always pay attention when getting on & off stairs, but rarely do for each step through out.
Good stuff!
Any chance of a video based on recommendations for flooring over radiant floor. I would definitely appreciate 1. Great video as always. And thanks
i watched mr post frame. he goes into more details and clearly. he does some radiant floor but you prob already found him
I couldn’t hear Greg, did he say he likes to get splooged on?. 🤣🤣🤣
I know I would definitely hire you if I was building something like this…
Very nice 👍🏽
Leave it to one trade to make life more difficult for the next trade through. Age old problem. Darn plumbers. LOL
Let's go!
Do you have any recommendations on who can do post frames houses in Columbia ky area like you guys or do you guys cover up to here . That will be even better
What kind of socket bits are you using for your impact when driving the tap cons?
Nice job. I like the part where you can adjust to the mistakes.
What about the fire rating between the shop and office space. I-joists have trouble achieving a 20 minute burn rating because of the 1/2" OSB web failing quickly when exposed to fire. I figured you would have to use drywall or some other fire block under your subfloor to pass building code.
As a plumber, I blame the electrician 😂😂 lol jk that fella should be running a jack hammer and fixing the issue, unacceptable if blueprints were available
Excellent job and very thorough with each item's explanation. I have a couple questions about the I-joists used for this. What is the approximate spacing for them here? Maybe you mentioned it and I just missed it, but I have a similar idea in mind and thought it best to ask. Also, this is probably a really "dumb" question, but what prevents the vertical web from bowing and splitting sideways in a load-bearing application like this?
Nice work guys! What’s your opinion on spray foam insulation?
@RRBuildings, how does the black ceiling reflect light down to the floor for working? Does it make it noticeably darker than say a white or silver cieling? Thinking of doing black ceiling with galvalume walls for my wood shop. Thanks
Architecturally, are those outer posts OK to have that much weight on them when they're already supporting the weight of the roof? I'm doing a similar build myself but instead of putting more weight in the posts which will sag with time I'm framing load bearing walls in-between the posts for the joists to rest on. I see a lot of people putting a lot of weight on post barn posts just doesn't seem like it's a good idea
they are resting on a full foundation wall..they are fine
but what about us planning on using sonopost piers? looking for any video that thoroughly addresses loads or clearly shows how we can build 2nd floor residential post frame home. I've been trying to buy one of your building plans for 2 years now and no answer...no reply....any plan that's closest to 40x56' with a 2nd floor. floating slab radiant floor and 2nd floor at each end. anything close to that would help and i'll buy the plans to go to school off of. thanks@@RRBuildings
Do you still need to use PT timber on concrete if there is a dpc/plastic under the concrete? I am assuming that there is something under there due to all of the insulation everywhere else.
What are those blue and yellow shoes you guys are wearing?
Where do you get the stops for the bottom of the track saw rail?
How do you like that metabo circular saw? 🤔
When you setup the laser an inch from the wall and use the receiver to plumb the wall, why don't you just measure from the bottom of the receiver to the target line on the receiver? If the measure is 2 1/2 just put your laser 2 1/2 inches from the wall then you can just butt the receiver to your top plate. Just my 2 cents :)
Nice job!
I see you do these regularly. What are you using for the ledger board on the outside wall both for material, and especially for mounting it? Structural lags? Need something stout to span 8+' between posts and support the weight of the mezzanine.
How tall is that building total and what is the ceiling height on the first and second level?
Chainsaw works good when you gang cut.
Thanks for the great videos: Just a quick couple of general thoughts: You take the time to add the barrier on the bottom (blocking moisture and future efflorescence), a great touch. But, then you drive several nails through what I assume is a self sealing barrier - and place the future corroding nails heads against the concrete floor (some of which is near a wet wall of leaks and spills from the bathroom). Perhaps you could toe nails the bottom stubs or add the barrier later, after the through nailing? Also; if you wanted you could run a quick 1/4 round router bit across the front and side of those treads prior to install, giving the front and side exposed edges a nice little detail, and prevent some splitting or the catching of a jacket or shirt on the edge later on as the wood dries and "splits"... Just two humble thoughts - Keep up the great work. Hope all had a great Halloween.
Both great ideas thanks
Why the vapor barrier inside of the fiberglass? batt insulation? Seems like it will trap moisture at some point, either coming and going. I understand inspectors might demand it, but something permeable would be better.
@7:00 you discuss how it's just going in a shop. But it's clearly going to have moisture from the concrete itself. Sure your tape helps, but any spill is still going to make it into those studs. I do NOT recommend this tape unless it's additional measure above / beyond treated lumber.
Is there a wood top rail option for the railing system you used?
Can I assume you used screws to attach the inside girts? It just looked like you moved those 2x4’s fairly easily. No tear out from trying to remove ring shank nails.
Actually ringshank nails lol
@@RRBuildings So did you cut the nails with your handy reciprocating saw with the Diablo blade? Just curious about how you move a board that has been nailed with the ring shank nails and not damage the wood severely.
how do you know the concrete can hold that 2nd level? i'm trying to design 40x56' w/ 2 floors residential, but no videos that address beams, loads, maybe add a pier or 2 in the middle of floating slab? maybe just leger/rim board on gable end walls?
I was always taught the crown in wood goes up. Am I missing something?
I'm sure this question has been asked before, so please forgive my ignorance. But what is that marking pencil (w the green tip) that you use many times. Is that an Amazon pick up? Thanks
kyle, that diamondback tool belt rig, which model is it? are you wearing the drywaller?
I’ve got some old used engine oil in a drum. Is it a good or bad idea to paint my white timber with it for protection??
Question - At the 5:23 mark in the video couldn’t you run a chalk string line at whatever height you need, put your bottom plate in, then put the 2x4 on the bottom plate and raise it up and have the 2x4 touch the chalk line at 8ft and wherever the 2x4 hits the chalk line you’ll have a mark to cut it. Instead doing it the way you have been. Hopefully i explained it well enough to understand. Maybe something to try….🤔
You can do that but the distance they were going there would be some sag on the chalk line because the string has weight and the chalk adds more weight to it. For smaller length walls it would be great.
I BUILD MY STAIRS THE SAME WAY, BUT WOULD HAVE SET THE LANDING DOWN TO ELIMINATE A STAIR ON THE STRINGER.
I'm surprised code allows you to not have a continuous handrail for the stairs. Unless its not being inspected of course.
N ok inspection
I’d like to see the rail install
What glue/foam are you using for the stairs? I am starting a house that I am doing a sub floor in and would love to have the floor quiet/not squeaky. Any suggestions?
Lp legacy adhesive
how many mesuring tapes does wear out in 1 year normal ?
FRAMING SQARE…what kind/brand and where can I get that one (shown around 26m 7s)?
Martinez tools
@@RRBuildings The framing square you have, has a “center slot/slit” down the middle on ‘both’ sides (long and short). Unless I’m blind, I’m not seeing it on his website. If you don’t mind pointing me to the same setup you have…Thank you!!
Temp jackpost on landing...hmmm?
Where did you get your railing from
Williams railing
Ledger
looks like you've never framed before, why put the packer on jacks? what if you want to adjust window opening ?
How tall is that building
What pen are you using
amzn.to/3QApAw4
@@RRBuildings Hello, Kyle!
Awesome job, thank you for sharing your expirience! Please make Toolsday with your new Metabo CAS cordless track saw🙏.
Trim Carpentry Framing
Might be a bit of an odd question, but why did you frame out headers for the internal doors that are non-structural? I know the outside wall will need them, but with the internal doors it just seems like a bit of wasted effort and lumber.
because the floor system sat on them
Plumbers will do that
Plans said 12’ from corner! Oh that’s outside corner. 😂