  • How to build a redi rock retaining wall - We built this 10 ft tall wall along a creek. These Redi-rock blocks are big blocks, the base blocks weight 3600 lbs. We used a John Deere 85G excavator to set these big retaining wall blocks. Make sure you check out part one where we did the excavation and poured the concrete footer.
    Part one is this retaining wall - • Building a Redi Rock r...

Komentáře • 59

  • @houndsmanone4563

    Great work. I'm having a concrete retaining wall built and you provided some great info. Thanks👍🏽🤠 12/13/23

  • @joes5096

    far and away the best retaining wall out there IMO

  • @davidpatrick3533

    Nice job! Great video. I do a lot of digging too, and can't sleep when it rains overnight during project like this.

  • @heresmytake2782
    @heresmytake2782 Před 2 lety +12

    only thing moving that wall is a 6.9 on the Richter scale

  • @786otto

    Nice job .

  • @Sam-ph6yx
    @Sam-ph6yx Před 2 lety +1

    Those blocks are huge! Great job 👍

  • @connorhughes46
    @connorhughes46 Před rokem +2

    This is so sick, great work!

  • @justpassingthrough4802
    @justpassingthrough4802 Před 2 lety +1

    Great video, man. Enjoyed learning about something I know very little about.

  • @KarasCyborg
    @KarasCyborg Před rokem +2

    I would think you would want some sort of glass type fence on the top to keep a toddler from going over, also, some steps down to the creek with a gate at the top.

  • @brucemurray2520
    @brucemurray2520 Před 2 lety +1

    Good explaination. Thanks

  • @teachthestory
    @teachthestory Před rokem +3

    What was the overall cost?

  • @dcwshoreline5416
    @dcwshoreline5416 Před rokem

    nice! did you have to put gravel underneath the bottom cousre and compact first?

  • @batterpm11
    @batterpm11 Před 2 lety +5

    Pouring a concrete footer is definitely the way to go on these, I’m currently doing a wall with a gravel footer. It’s very easy to get that first row off grade.

  • @dcwshoreline5416
    @dcwshoreline5416 Před rokem

    that back stone on filter fabric behind wall

  • @josephrottina1901
    @josephrottina1901 Před 2 lety +1

    Great job brother.👍🇺🇸🇺🇸

  • @tristardiggin
    @tristardiggin Před 2 lety +2

    Nice work! Found your channel through the transmission service you did. Looks like we do similar CZcams videos based on this one. Did a video on my first Redi-Rock wall and have 3 more on the schedule. Will subscribe and check out more of your videos.

  • @marklanese5594
    @marklanese5594 Před 2 lety +1

    Good job leveling the concrete footing. I expected it to give you a hard time leveling the first course of block. Challenging project, but you got it done.

  • @TheHomePros6221
    @TheHomePros6221 Před 2 lety +2

    Man U do awesome work

  • @Journey_to_home

    How much does something like this cost?

  • @TheHomePros6221
    @TheHomePros6221 Před 2 lety +5

    Wonder how much a job like this cost