Tar Heel Dashcam
Tar Heel Dashcam
  • 42
  • 97 611
Wilkesboro to Yadkinville, US 421 South
A drive on US 421 South, a four-lane controlled-access highway between the city limits of Wilkesboro and Yadkinville.
Recorded in June 2024 using a GoPro Hero11 Black camera in Ultra HD resolution.
zhlédnutí: 480

Video

Winston-Salem Northern Beltway Construction Update for Summer 2024
zhlédnutí 306Před 21 dnem
A rolling side view and picture-in-picture front view showing the construction progress of the Winston-Salem Northern Beltway Future Interstate 74 at various intersecting roads in Forsyth county. *TL;DR: Beltway projected completion is Spring 2027.* Chapters: 00:00 Interstate 74 East 01:52 Interstate 74 West 03:28 Glenn Hi Rd 04:24 Interstate 40 East 07:02 Kernersville Rd 08:08 Sedge Garden Rd ...
Deep Gap to Wilkesboro, US 421 South
zhlédnutí 369Před 28 dny
A drive on US 421 South, a four-lane expressway with at-grade intersections and driveway connections, between Deep Gap and the Wilkesboro city limits. Recorded in June 2024 using a GoPro Hero11 Black camera in Ultra HD resolution.
West Jefferson to Deep Gap, US 221 South
zhlédnutí 270Před měsícem
A drive on US 221 South between West Jefferson and US 421 in Deep Gap. After years of construction, US 221 has been widened and improved to a four-lane expressway with at-grade intersections and traffic signals. The new roadway mostly follows the path of the original highway but has been flattened with deeper cuts through the hills, and includes broader curves. For comparison, you might want to...
Martin Luther King, Jr. Drive and US 52 North in Winston-Salem
zhlédnutí 1,1KPřed 2 měsíci
A short drive on Martin Luther King, Jr. Drive in Winston-Salem and a longer drive on US 52 North, ending on Bethania-Rural Hall Road/NC 65 near Rural Hall. The construction area for a new bridge and widening project for Hanes Mill Road is entered at 08:15. The construction zone for the Northern Beltway interchange with US 52 is entered at 08:50. The first bridge is the new overpass for Ziglar ...
Lexington to Winston-Salem, US 52 North (I-285 North), NC 8
zhlédnutí 764Před 2 měsíci
*Note:* The first 22 seconds are muted because of music playing in the background (better to play it safe than risk triggering the notorious CZcams algorithm). A drive on US 52 North / Interstate 285 North between Lexington and Winston-Salem. A portion of US 52 is concurrent with NC 8. Recorded in April 2024 using a GoPro Hero10 Black camera in Ultra HD resolution. Telemetry was extracted with ...
Salisbury to Lexington - Interstate 85 North and US 52 North (I-285 North)
zhlédnutí 750Před 3 měsíci
Recorded in April 2024 using a GoPro Hero10 Black camera in Ultra HD resolution. Telemetry was extracted with JuanIrache / gopro-utils. github.com/JuanIrache/gopro-utils Gauges were created with DashWare 1.9.1. Video was created with MAGIX Movie Studio 2024 Platinum, using AV1 codec.
Interstate 40 - Interstate 77 Interchange Update - March 2024
zhlédnutí 8KPřed 4 měsíci
A drive through the new interchange between I-40 and I-77 in Statesville, North Carolina, accessing various entry and exit ramps. Chapters: 00:00 I-40 West to US 21 02:50 US 21 to E. Broad Street 06:00 E. Broad Street to I-77 North and I-40 East 10:05 I-40 West to I-77 South 14:52 I-77 North to I-40 West 20:14 I-40 East to I-77 North Recorded in March 2024 using a GoPro Hero10 Black camera in U...
US 52 through Downtown Winston-Salem, Interstate 40 West and US 421 North -- with Dashware Gauges
zhlédnutí 1,3KPřed 7 měsíci
The drive begins on Germanton Road/NC 8 where I enter US 52 South. After passing through downtown Winston-Salem, I next enter I-40 West. Later I reach US 421 North. The drive ends on Lewisville-Clemmons Road. The recording features DashWare gauges showing speed in miles per hour and kilometers per hour. Recorded in Dec. 2023 using a GoPro Hero10 Black camera. The video was downscaled to 1080p f...
Winston-Salem Northern Beltway Update - Link to US 52 Nears Completion
zhlédnutí 2,2KPřed 7 měsíci
A drive on the Northern Beltway between Salem Parkway and US 52. The drive begins on South Main Street in Kernersville where I enter Salem Parkway West/US 421 North. Upon reaching the beltway, I take NC 74 West heading northbound. I reach the end of the beltway and merge onto US 52 North. After a short drive on US 52 North, I make a u-turn and head back on US 52 South. Returning to the beltway ...
Mocksville to Statesville, Interstate 40 West
zhlédnutí 1,6KPřed 10 měsíci
A drive on I-40 West between US 64 near Mocksville and East Broad Street in Statesville (off I-77 South). The drive includes footage of the new flyover bridge between I-40 West and I-77 South. The ramp is reduced to one lane until work is complete which probably involves installing lane markings and reflectors. Recorded in Sept. 2023 using a GoPro Hero10 Black camera in 4K/Ultra HD/2160p resolu...
Greensboro to Winston-Salem - Bryan Boulevard, Interstate 73 South, and Interstate 40 West
zhlédnutí 1,2KPřed rokem
The drive begins on Bryan Boulevard in Greensboro and ends at the Silas Creek Parkway exit in Winston-Salem. Chapters: 00:00 Bryan Blvd 06:00 I-73 South 09:10 I-40 West 19:00 Northern Beltway Construction Zone 21:44 I-40 West Recorded in June 2023 using a GoPro Hero10 Black camera in 4K/Ultra HD/2160p resolution.
Winston-Salem to Greensboro, Beltway to Beltway
zhlédnutí 2KPřed rokem
I begin the drive on University Parkway in Winston-Salem. Next, I enter the Northern Beltway Temporary NC 74 / Future Interstate 74. Reaching the end of the beltway's current terminus, I enter Salem Parkway East / US 421 South. After passing through the city of Kernersville, I enter Interstate 40 East at the eastern end of Salem Parkway. In Greensboro, I leave I-40 and enter Interstate 840 East...
Greensboro Urban Loop
zhlédnutí 1,3KPřed rokem
A complete drive around the Greensboro Urban Loop, a series of connecting freeways that encircle the city of Greensboro, North Carolina. The connecting roads are Interstate 840, Interstate 73, Interstate 85, and Interstate 785. The drive begins in the northeastern part of Greensboro on Reedy Fork Parkway where I enter US 29 South construction is visible for a new interchange with US 29. For the...
Greensboro Urban Loop drive with Dashware gauges [ Full HD ]
zhlédnutí 867Před rokem
A previous drive around the Greensboro Urban Loop showing speed and heading with Dashware gauges. Recorded in June 2023 using a GoPro Hero10 Black camera. The video was downscaled to 1080p from a 2160p recording. Telemetry was extracted with JuanIrache / gopro-utils. github.com/JuanIrache/gopro-utils Gauges were created with DashWare 1.9.1.
Night Drive - Salem Parkway West (US 421 North) through Downtown Winston-Salem
zhlédnutí 869Před rokem
Night Drive - Salem Parkway West (US 421 North) through Downtown Winston-Salem
Night Drive - Winston-Salem Northern Beltway - NC 74 East, Future Interstate 74 East
zhlédnutí 401Před rokem
Night Drive - Winston-Salem Northern Beltway - NC 74 East, Future Interstate 74 East
Winston-Salem to Yadkinville, Interstate 40 West and US 421 North
zhlédnutí 1,4KPřed rokem
Winston-Salem to Yadkinville, Interstate 40 West and US 421 North
Statesville to Winston-Salem, Interstate 40 East
zhlédnutí 1,4KPřed rokem
Statesville to Winston-Salem, Interstate 40 East
Interstate 40 West in Winston-Salem
zhlédnutí 1,5KPřed rokem
Interstate 40 West in Winston-Salem
Asheboro to Greensboro, Interstate 73 North
zhlédnutí 1,2KPřed rokem
Asheboro to Greensboro, Interstate 73 North
Jonesville to Wilkesboro, Interstate 77 South and US 421 North
zhlédnutí 567Před rokem
Jonesville to Wilkesboro, Interstate 77 South and US 421 North
US 52 South through Winston-Salem
zhlédnutí 2,9KPřed rokem
US 52 South through Winston-Salem
Yadkinville to Statesville, US 421 North and Interstate 77 South
zhlédnutí 2,3KPřed 2 lety
Yadkinville to Statesville, US 421 North and Interstate 77 South
Mount Airy to Hamptonville, Interstate 74 West and Interstate 77 South
zhlédnutí 1,5KPřed 2 lety
Mount Airy to Hamptonville, Interstate 74 West and Interstate 77 South
Clemmons to Winston-Salem, Interstate 40 East
zhlédnutí 1,5KPřed 2 lety
Clemmons to Winston-Salem, Interstate 40 East
Winston-Salem to Mount Airy, US 52 North and I-74 West
zhlédnutí 1,2KPřed 2 lety
Winston-Salem to Mount Airy, US 52 North and I-74 West
Dobson to Winston-Salem via I-77 North, I-74 East and US 52 South
zhlédnutí 1,2KPřed 2 lety
Dobson to Winston-Salem via I-77 North, I-74 East and US 52 South
Mooresville to Union Grove, Interstate 77 North
zhlédnutí 2,5KPřed 2 lety
Mooresville to Union Grove, Interstate 77 North
Statesville to Hickory, Interstate 40 West
zhlédnutí 4KPřed 3 lety
Statesville to Hickory, Interstate 40 West

Komentáře

  • @kennypalermo9071
    @kennypalermo9071 Před dnem

    Did you know the Mirage being closed?

  • @TimothyRogersRailfanning

    Ah yes, Future I-777

    • @kennypalermo9071
      @kennypalermo9071 Před dnem

      Interstate 777 is coming to North Carolina. Because North Carolina has a lot of auxiliary interstates.

  • @chaparron_belkiki
    @chaparron_belkiki Před 18 dny

    Do US 52 progress

  • @abfutrell
    @abfutrell Před 28 dny

    Have you recorded I-26 north of Mars Hill?

    • @Tar-Heel-Dashcam
      @Tar-Heel-Dashcam Před 21 dnem

      Not at this time, but I have thought about it. Currently, there is a maintenance project on I-26 on the North Carolina side. It shows up on the most recent Google Map street view, so it is still ongoing and probably won't be finished until 2025. The last time I visited I-26 was in the 1990s shortly after the Tennessee section opened. At that time it was signed as US 23 and was intended as a bypass for the original US 23, a winding two-lane road through the mountains. I actually had a chance to drive on the old US 23 going into North Carolina. When the North Carolina section opened after 2000, the roadway became an extension of I-26. I would like to visit the area sometime in the future, but it would probably be after 2025.

  • @iansampson3076
    @iansampson3076 Před měsícem

    I am glad to see that for Interstate 40 that the control cities are Winston-Salem going eastbound and Asheville going westbound. Makes sense. In fact this is what the control cities for Interstate 40 in North Carolina should be between the Tennessee border and the Eastern end I-40 East Asheville Winston-Salem Greensboro Raleigh Wilmington I-40 West Raleigh Greensboro Winston-Salem Asheville Knoxville

  • @povertyspec9651
    @povertyspec9651 Před 2 měsíci

    NC has a mess of a highway system and does nothing for bicyclists as well. I-587 really?

  • @spongytitles2704
    @spongytitles2704 Před 2 měsíci

    why are the overhead signs black instead of green? am i colorblind?

  • @tennoklark
    @tennoklark Před 3 měsíci

    It’s the M*A*S*H Interchange 4077😊

  • @armandoperez7967
    @armandoperez7967 Před 3 měsíci

    Hopefully Interstate 40 will be extended through Bakersfield and to Interstate 5 at least, if not all the way to Paso Robles and make it a coast to coast highway. This has been rumored for decades and the completion of the Centennial Corridor has made it even more possible!

    • @kennypalermo9071
      @kennypalermo9071 Před 3 měsíci

      Can Interstate 40 meet Interstate 5?

    • @tinapalermo3768
      @tinapalermo3768 Před 3 měsíci

      @@kennypalermo9071 Probably not, I-40 was used to be the end at I-15 in Barstow. I-40 did not meet I-5 west of Bakersfield.

  • @kennypalermo9071
    @kennypalermo9071 Před 3 měsíci

    Is Doomie Grunt doing teaser previews from October 2022, July 2023, and March 2024?

    • @tinapalermo3768
      @tinapalermo3768 Před 3 měsíci

      No, he’s not doing a teaser this time. Maybe in the summer he can.

  • @kennypalermo9071
    @kennypalermo9071 Před 3 měsíci

    How did Doomie Grunt change his name?

  • @richardcoronado4081
    @richardcoronado4081 Před 3 měsíci

    Living in Texas right now, but it's so nice to check back in my home state of North Carolina and see some of these changes taking place. Nothing like home. Thanks for sharing! 👍

  • @kennypalermo9071
    @kennypalermo9071 Před 5 měsíci

    Can Doomie get extra words for the description for this video? Seems like there weren't enough. czcams.com/video/ejU49CLigMY/video.html

  • @waynemock1820
    @waynemock1820 Před 6 měsíci

    THANK YOU VERY MUCH FOR SHOWING THIS VIDEO. I REALLY DO APPRECIATE IT. I WANT TO COME BACK HOME AND DRIVE AROUND AND ABOUT. I MISS MY HOME AND HOPEFULLY ONE DAY, I WOULD LIKE TO OWN MY VERY OWN VEHICLE AND DRIVE ANYWHERE I WANT TO GO AND GET ANYWHERE THAT I WANT TO GET. IT WAS SURE TO BE NICE TO DO THIS FOR THE FIRST TIME IN A LITTLE OVER A DECADE. I AM COMING BACK HOME AND GO ON THIS ROAD TRIP AGAIN. I WILL SEE YOU FOLKS THERE. THANK YOU AGAIN FOR TAKING MY ON THIS TRIP.

  • @stitch-xx2oo
    @stitch-xx2oo Před 6 měsíci

    Is this section of Us52 above NC-74 supposed to hook on to and be Interstate 74? Great video.

    • @Tar-Heel-Dashcam
      @Tar-Heel-Dashcam Před 6 měsíci

      Yes, it is intended to connect directly to US 52. Eventually, US 52 between the beltway and Interstate 74 near Mt. Airy will be designated as I-74. In the meantime, It will be interesting to see how the NCDOT configures it for the short term.

    • @davidtosh7200
      @davidtosh7200 Před 5 měsíci

      There will be auxiliary route of I-74 and it is future I-274 as of west loop around Greensboro North Carolina, and some stretch of future I-274 is under construction.

    • @kennypalermo9071
      @kennypalermo9071 Před 5 měsíci

      @@davidtosh7200 I-274 does built to interstate standards also

  • @stitch-xx2oo
    @stitch-xx2oo Před 7 měsíci

    I really am not sure how to ask you this, but Is Greensboro, NC beginning to work on I-73 North of Greensboro? The reason I asked is because I saw green pipping on the North side of US 220 which is the I-73 corridor. Thanks for any input into this matter.

    • @Tar-Heel-Dashcam
      @Tar-Heel-Dashcam Před 7 měsíci

      I think that work on I-73 is finished for now. If I-73 were to be extended to Virginia -- which would require converting existing US 220 to interstate standards -- it probably wouldn't happen until the next decade. IMHO. 🤔

    • @stitch-xx2oo
      @stitch-xx2oo Před 7 měsíci

      @@Tar-Heel-Dashcam Thanks. Did US 74 open the rest of the way to US 52 on Thanksgiving Day?

    • @Tar-Heel-Dashcam
      @Tar-Heel-Dashcam Před 7 měsíci

      Yes and no. There is a temporary link between NC 74 and US 52 in both directions, but the connection is not finished. In the coming weeks/months?, there will be road closures until the actual link is completed. My guess is that the link won't be fully done until spring, since the contractor can't get much done in the winter. Currently, NC 74 West (beltway "northbound") uses the collector-distributor lane from University Parkway to reach US 52 North. US 52 South connects to NC 74 East (beltway "southbound") using the opposing lane of the beltway. Eventually, the lanes of US 52 to the north of Rural Hall will be reconfigured to connect directly to the beltway. That means that a driver coming from the direction of Mount Airy on US 52 South will naturally enter the beltway (heading "southbound") unless they exit onto US 52 South. If a driver is on NC 74 West approaching Rural Hall (beltway "northbound") they will enter directly onto US 52 North. This arrangement will facilitate future I-74 between the beltway and Mount Airy.

    • @stitch-xx2oo
      @stitch-xx2oo Před 7 měsíci

      @@Tar-Heel-Dashcam When is the Southern Section of the Winston Salem beltway supposed to be completed. thanks!

    • @Tar-Heel-Dashcam
      @Tar-Heel-Dashcam Před 7 měsíci

      The projected completion is Spring 2027.

  • @SlowedByMaple
    @SlowedByMaple Před 9 měsíci

    Looks like the I-40/77 Interchange is pretty much done

    • @TolbertWangilaKiller115
      @TolbertWangilaKiller115 Před 9 měsíci

      All of the flyover ramps are open but construction is still going.

    • @Tar-Heel-Dashcam
      @Tar-Heel-Dashcam Před 7 měsíci

      NCDOT Press Release - published Dec. 22, 2023 (from the NCDOT website): STATESVILLE - Right on time for holiday travel, the N.C. Department of Transportation has reached a significant milestone on the I-40/I-77 interchange project in Iredell County. This morning, all travel lanes in the project limits are open and in their final pattern, about ten days ahead of schedule. The $260 million contract was awarded five years ago this month to Connecticut contractor Lane Construction, Corp. The project includes widening approximately 7.4 miles of both interstates from four lanes to eight lanes, and constructing a partial turbine interchange, initially planned to be flyover ramps. Bridges over I-77 at East Broad Street and Davie Avenue have also been replaced. “This critical phase of the project will improve traffic flow through the interchange and this region," says Division 12 Engineer Mark Stafford. “The original interchange was built back in the 1960s, so we need these improvements to serve drivers for years to come." Though the traffic pattern is in its final configuration, work will be ongoing through spring 2024. Contract crews will complete punch list items and other work restricted by seasonal limitations like installing the final riding surface, final pavement markings and markers, and rumble strips.

  • @kennypalermo9071
    @kennypalermo9071 Před 10 měsíci

    Hello! Did Doomie Grunt release a dashcam video this Friday? The Bad Drivers video is still the current one as I told.

    • @tinapalermo3768
      @tinapalermo3768 Před 10 měsíci

      Bad news! He didn’t make it this Friday so he’ll find something instead.

  • @tolbs1828
    @tolbs1828 Před 10 měsíci

    Nice APL sign

  • @FLOGAN222
    @FLOGAN222 Před 11 měsíci

    Nice drive!!!! I still refer to this as BUSINESS I-40

  • @dianeadkins-diorio1783

    Does anyone know who C Richard Vaughn is that this stretch of I-74 is named after?

  • @JellGExplorer
    @JellGExplorer Před rokem

    thanks for sharing:) new subscriber from Malaysia here

  • @gagejohnson3778
    @gagejohnson3778 Před rokem

    2:19 You just witnessed one of North Carolina’s speeding cops!!

    • @Tar-Heel-Dashcam
      @Tar-Heel-Dashcam Před rokem

      Here's a news story from ten years ago about speeding cops: czcams.com/video/zVN7IbbKkBo/video.html Times haven't changed! 😄

  • @silverhawk24
    @silverhawk24 Před rokem

    We actually went through I-40 yesterday heading to Hanes Mall in Winston-Salem. When we came back eastbound tho, a car somehow ended up in the middle of some trees, traffic was backed up between the Hanes Mall Blvd exit and Peters Creek Pkwy exit.

  • @thecoolannishatk.
    @thecoolannishatk. Před rokem

    Understating how much of a relaxing drive this was. Of course, I just had to throw on a podcast while watching this. I love the landscape of this country outside of the city, I hope I can get things in order and one day hit the road for myself.