![Spiro Kala](/img/default-banner.jpg)
- 41
- 493 087
Spiro Kala
Greece
Registrace 3. 09. 2007
Video
Walk Around Suzuki GSX250R - Yoshimura Alpha T
zhlédnutí 2,1KPřed 4 lety
Walk around of the Suzuki GSX250R with Yoshimura AlphaT exhaust.
Suzuki GSX250R Yoshimura Alpha T Sound
zhlédnutí 2,8KPřed 4 lety
I want to do a sound video of the Yoshimura Alpha T for the GSX250R. I was searching for it and there is only a hand full so here is another video. The slipon is small and neat and looks amazing on the bike and also the sound is amazing, oh and very loud. Montage: Kostas Kokkinis
How I built my Server Room (3 Months in 10 minutes Time lapse)
zhlédnutí 477KPřed 6 lety
In the summer of 2016 we decided to move our server room to a new location. Here is the video of the server room build in fast forward. We went for Cat6 cables and patch panel from our cat5. It took us about 3 months working on weekends.
Muay Thai Round 1
zhlédnutí 22Před 6 lety
My sons second fight due to uni he didnt do the training he wanted and it showed during the fight (Blue Corner). The fight ended in a draw
First fight Muay Thai E1
zhlédnutí 18Před 7 lety
My sons first fight at a Muay Thai event. It was a draw but create for a first timer and great after a serious injury.
Riding my Suzuki Vstrom in Athens (GO Pro)
zhlédnutí 201Před 8 lety
Riding my Suzuki Vstrom in Athens (GO Pro)
On our way to Loutraki Vstrom Fazer 1000
zhlédnutí 119Před 11 lety
On our way to Loutraki Vstrom Fazer 1000
Vstrom DL650 Fazer 100o on our way for coffee at Loutraki
zhlédnutí 118Před 11 lety
Vstrom DL650 Fazer 100o on our way for coffee at Loutraki
in 3 months!!! holy cow that is an amazing job, it took us 4 staff to finish it in 7 n half, that includes routing cables to the secondary building to the mains. but the most annoying part was the fact that I made a mistake tryin to finish it quickly as possible. Rookie employee here
That was cool, but I think it’s time to get a new shirt.
Nice job... Nice music.
Thank you Carlos
Hi, will you please tell me what kind of internet connection is required build such server room. I means is there any speed requirement for that internet speed.
No there is not. In this server room we have 4 internet connection.
What's speed they have?
bitcoin miners: yess
Ya not yet. LOL
I'm ur 700tg subscriber lesgoo
Thank you for following me
May I know please, how many users can this server cater to? Please help me. I just need to know roughly what is the number of user can it support
That really depends on what you use the server for. On our system we have 10 VM which support around 60+ users. The capacity is for a much large amount.
Destiny! KARLPRII! wow!
cool man. do you mind to share the specs of the room for your server room?
Basically running a cluster servers dell with VMWare. Also a linux firewall and a backup server.
great video but bad music it was kinda sad
that's the only 13min long song i could find that will not be banned due to copyright
0:32
Is that an UPS on the left or some kind of mainframe?
Yes its a 10kva ups
What the animals in the zoo see: 0:32
Thank you very much for not using some electronic music over this
Yeah i think the music fitted perfectly
Sorry, but your server room is flawed! What floor of the server room? 1st floor? Thin drywall walls Wooden floors Water fire extinguishing system!
Yes there are some flaws. Budget was the main reason. We couldn't do anything with the floors but a fire system has been install. An also the location of the server room didn't allow us to do a lot. It was not a new building.
Wait so at 0:47 why do the windows have to be removed & replaced? Giving me the Windowless Building/33 Thomas Street vibes.
Dont want people to see what is in there. Also it will help with insulation
Hello Derrius checking in post a trip. Go good things and data and files abd programs. Good reviews. Go good things. Also some and dbs and data and check ins , and generals. Go I and go good volumes. And Logs. Go hp s and Ibms and Amigas D. Branch
3 months, for what looks like 2 dell poweredge 2950 servers and a few patch panels. Most of the time wasted was leaned towards covering all the doors and windows. Barely server related.
We only worked on weekends. Also you didnt see we passed new cables (which you should of guessed) in all the building 7 floors
Me *clicks on 1.5x*
Just why.
Just cause
I wished so hard the directors of the company I work at understood the importance of an Equipment room. Our server rack is literally inside a 1.5m x 1.5m janitor closet, near cleaning supplies. We leave the rack open at its side, as the front door won't have space to open.
Hello Luam. Yes I know exactly how you feel. IT budget is always the lowest and also the first person they look at when there is an issue. Sometimes you need to show them ;) that when things go wrong what is your down time. I would suggest a power point presentation on what happens when you lose IT infrastructure and present it. Make sure the worst case scenario is there.
Poor guy in the pink shirt he did all the work
He is fine.
I see alot of breaks and sitting around to talk... Idk what y'all are running over there. In communist china this would've been done in 3 weeks.
Its good to get an idea of how things work in communist China. I am guess you haven't read all the comments, so I will do a quick run down. This work was done on the weekend. So we had to work normally Monday-Friday and then continue working on the weekend. So yes we did sit down a lot as we were working 7 days a week and on weekend more than 8 hours a day. Yes we were tired, yes we slacked off and near the end we were exhausted. It was not a race to see how fast we could do it. Thank you for your comments by the way.
I did read all the comments. That's why I said the communist china part, it's a joke. I meant no offense but I guess all these experts came out of the woodwork and had their 2 cents
I doubled the speed of the video and watched it in 5 Minutes 😎
Cool. Does it look better?
0:32 scare
Sorry I scared you.
My dream bike🔥
Its a nice bike. Lacks some power though
Reading the comments and thinking, people in the internet are very weird. Thanks for the video, I also work with IT and I thought that the job was very good.
Thank you Regis for you comments. We tired to do the best we could. Wish i had more of a budget to get more things I need. But that is life you never have an unlimited budget in IT
Hi, can you please share with us what type of company you are working for?
I work for an NGO.
I want a server room like this. I am planning to build a server, but it will be much smaller than this. :(
Size dosent matter selecting the right equipment is the goal. Always think ahead because a small company might grow and you need to adapt without changing all your systems every time. Select equipment you can upgrade.
has db killer ?
No there is on with it but i havw not installled the DB Killer
has db killer ?
Nope. No DB Killer but it does come with one.
They should have just purchased a Zella DC. No need for a server room.
Not a bad system. Will look into it. Thanks
Where is the fucking exhaust sound m8?? I came for this!! :(
what's the name of the song :(
Spec please
Why didn’t you remove the window frames and bookcase before installing the drywall? What did you do on the exterior to cover those windows?
We didnt remove it as we didnt know in the future were will be. For the windows we used film (not sure what it is called) its for heat and cold.
Check out Chris Temporary's Music czcams.com/video/F01P5KS791I/video.html He will be producing a lot of music for me.
Private video
Şu beyaz gömlekli dayı anca oturdu birşey yapmadı yapana da engel oldu
English have no idea what you are saying
Joking great job dude
Thank you
Messy
No not messy
Έλληνας ;
Nai!!!
@@SpiroKala χαχαχα. Το κατάλαβα από την σακούλα καυκας. Γιατί είναι ο server;
Einai to neo server room sthn etairia. Exoume peripou 9 servers mesa ekei
0:32 , play video at 0.25 speed then pause the video and just click on above time stamp :)
That s me
smoking inside a server room with sprinklers? WHAT!!... 4:38
sprinklers don't go off with smoke and also the sprinklers are disconnect
@@SpiroKala still doesn't explain why he'd be allowed to smoke inside a server room but okay..
First of all, sprinklers react to heat. Second of all, it’s his bloody Server room and he may decide if smoking is allowed or not. Third of all, it’s a construction site at this Time 🤦♂️
@@eliasmaier6988 did i hurt your feelings? cute lil smoker ;)
God bless the fredo espresso! Mpravo paidia.
se eyxaristo
How about cost..how many u spend to make this room????
The total cost came out to around 30000 euro this also included upgrade of IT systems
@@SpiroKala .........wou....that serve for what.......
Blue t-Shirt 👨 respect for you man!
Thank you Walid
Day months
Good job 👏 guys
Thank you dude
what are these servers used for? just wondering.
Its ours companys server room for all our servers
@@SpiroKala ok but what does your company do?
3个月时间是不是有点长
国内如果设备到齐,15天绰绰有余
ΔΕΝ ΚΑΤΑΛΑΒΑ ΤΙΠΟΤΑ
0:32 lol