- 73
- 11 492
Gary Corbin - Pak Rat Route • MRR
United States
Registrace 2. 01. 2015
I call this "Pak Rat Route" because I've been acquiring things to build this MRR for YEARS.
Follow along with updates as I build an N scale model railroad in a 13' x 13' room. As yet these videos will not be a " How to" or instructional, just progress of the layout. Maybe I'll do some "how I do it" videos with a few of the scenery and buildings phase(s).
Build started about 14 January 2019 with painting the walls sky blue.
Next came the lighting, using second hand track lighting, 8ea 50w and 1ea 75w heads, as well as 3 scrounged/ modified "can" lights that have 75w bulbs. Also a ceiling fan with 4ea 40w bulbs.
Main subject of this model railroad is a cement processing plant. Other industry and buildings will be added as I figure that out.
Track on-hand totals 235'+ including 53 turnouts, 150' of flex, and numerous Atlas radius and straight pieces.
I'll have to get more track before it's all said and done as I estimate the layout will take about 300' to 330' feet.
Follow along with updates as I build an N scale model railroad in a 13' x 13' room. As yet these videos will not be a " How to" or instructional, just progress of the layout. Maybe I'll do some "how I do it" videos with a few of the scenery and buildings phase(s).
Build started about 14 January 2019 with painting the walls sky blue.
Next came the lighting, using second hand track lighting, 8ea 50w and 1ea 75w heads, as well as 3 scrounged/ modified "can" lights that have 75w bulbs. Also a ceiling fan with 4ea 40w bulbs.
Main subject of this model railroad is a cement processing plant. Other industry and buildings will be added as I figure that out.
Track on-hand totals 235'+ including 53 turnouts, 150' of flex, and numerous Atlas radius and straight pieces.
I'll have to get more track before it's all said and done as I estimate the layout will take about 300' to 330' feet.
Scratch Building - 21 October 2020 - Bailey Yard, NE - East Tower
Scratch building the East yard tower at North Platte,NE , Bailey Yard.
N scale - 1/160
N scale - 1/160
zhlédnutí: 276
Video
More Heavy Equipment & Service Trucks - Scene Update - 7 Sept 2020 - Ep. 67
zhlédnutí 139Před 4 lety
Update on new equipment and trucks... wash out scene and turnout placement scene updates.
27 August 2020 - Layout Update - - Part Five - Ep. 66
zhlédnutí 70Před 4 lety
27 August 2020 - Layout Update - - Part Five - Ep. 66
27 August 2020 - Layout Update - - Part Four - Ep. 66
zhlédnutí 54Před 4 lety
27 August 2020 - Layout Update - - Part Four - Ep. 66
Layout Update - 27 August 2020 - - Part Three - Ep. 66
zhlédnutí 78Před 4 lety
After 5 months.... finally a update
Layout Update - 27 August 2020 - - Part Two - Ep. 66
zhlédnutí 82Před 4 lety
Layout Update after 5 months.
Layout Update - 27 August 2020 - - Part One - Ep 66
zhlédnutí 134Před 4 lety
After no videos for 5 months... finally here’s an update. Lower yard ballasted, mining equipment, service trucks, scene ideas.... part one of four
Review - N scale River Point Station - Ford F-250 - 15 March 2020 - Ep. 65
zhlédnutí 243Před 4 lety
Review of River Point Station Ford F-250 Crew Cab 4x4 Pickup Trucks
Layout Update - 7 March 2020 - Fascia and Shelving - Ep. 64
zhlédnutí 397Před 4 lety
Installing fascia and shelving.
More Scenery - 7 March 2020 - Part Four - lower yard arrival/ departure tracks - Ep. 63
zhlédnutí 82Před 4 lety
More scenery, lower yard arrival/ departure tracks, ballasting. Sorry but the sound is messed up towards the end... I tried to mess with but to no avail. The sound some what works I guess... leaves ya hanging for next video. Lol This video gave me grief uploading too... even re edited it from beginning... you’ll have that from time to time I guess.
Review - 3D Printed - N Scale - Cat Heavy Equipment - 23 February 2020 - Cat 777 - Cat 6015 - Ep. 62
zhlédnutí 523Před 4 lety
Review of 3D printed Cat heavy mining equipment, 777G mining haul truck, 6015B Mining shovel
Layout Update - 23 February 2020 - Lower Mainline Scenery - Part Two - Ep. 60
zhlédnutí 72Před 4 lety
More plastering, painting, adding ballast and ground cover. Part two lower mainline series.
Layout Update - 23 February 2020 - Lower Mainline Scenery - Part Three Ep. 61
zhlédnutí 130Před 4 lety
Continuing around the lower mainline with ballast and ground cover.
Review - Arnold - N Scale - U28c BN 5651 - 15 February 2020 - Running Trains!
zhlédnutí 1,2KPřed 4 lety
Reviewing Arnold N scale U28c BN 5651, Standard dc version. N scale Arnold U28c shell removal. czcams.com/video/KmB6Zh2R2O4/video.html
Layout Update - 14 February 2020 - Fill and Plaster on Mainline - Pt. One - Ep. 58
zhlédnutí 105Před 4 lety
Plastering mainline... Music off iMovie maker - You’re All Around - Bronze Falcon Sweet - RAF Rundell
Mainline Overview - 12 February 2020 - Features of Mainline and Bypass Sidings - Ep. 57
zhlédnutí 101Před 4 lety
Mainline Overview - 12 February 2020 - Features of Mainline and Bypass Sidings - Ep. 57
First Year Anniversary - 5 February 2020 - Thank You!
zhlédnutí 96Před 4 lety
First Year Anniversary - 5 February 2020 - Thank You!
Lower Yard Improvements - 4 February 2020 - Caboose Run Around - Ep. 55
zhlédnutí 83Před 4 lety
Lower Yard Improvements - 4 February 2020 - Caboose Run Around - Ep. 55
Rolling Stock - 25 January 2020 - Ep. 54
zhlédnutí 76Před 4 lety
Rolling Stock - 25 January 2020 - Ep. 54
Elevations - 24 January 2020 - Ep. 53 - Response to Roy Smith QOTW
zhlédnutí 252Před 4 lety
Elevations - 24 January 2020 - Ep. 53 - Response to Roy Smith QOTW
Running Trains - 21 January 2020 - Ep. 52
zhlédnutí 218Před 4 lety
Running Trains - 21 January 2020 - Ep. 52
Layout Update - 17 December 2019 - Ep. 51 - West Wall Background
zhlédnutí 105Před 4 lety
Layout Update - 17 December 2019 - Ep. 51 - West Wall Background
Layout Update #50 - 14 December 2019 - Limestone Quarry Part #2 - Foam Work Completed
zhlédnutí 277Před 4 lety
Layout Update #50 - 14 December 2019 - Limestone Quarry Part #2 - Foam Work Completed
layout Update - 49 - limestone Quarry - Part One
zhlédnutí 139Před 4 lety
layout Update - 49 - limestone Quarry - Part One
Layout Update 48 - Limestone Quarry Concept / Mock Up- 30 November 2019
zhlédnutí 333Před 4 lety
Layout Update 48 - Limestone Quarry Concept / Mock Up- 30 November 2019
Layout Update - Track Work Finished - Part Two - 18 November 2019
zhlédnutí 134Před 4 lety
Layout Update - Track Work Finished - Part Two - 18 November 2019
Layout Update - Track Work Finished - Part One - 18 November 2019
zhlédnutí 106Před 4 lety
Layout Update - Track Work Finished - Part One - 18 November 2019
Layout Update - Sub Bed & Elevations - 31 October 2019 - Ep 46
zhlédnutí 89Před 4 lety
Layout Update - Sub Bed & Elevations - 31 October 2019 - Ep 46
Layout Update - 16 September 2019 - Water Pour
zhlédnutí 193Před 4 lety
Layout Update - 16 September 2019 - Water Pour