Cab View - Rapid KL LRT Train, Kuala Lumpur, Malaysia

Sdílet
Vložit
  • čas přidán 8. 09. 2024
  • Gombak (KJ1) to KL Sentral (KJ15), Kelana Jaya Line.
    In fact, there is no drivers cab in rolling stocks. They are fully automated and driver-less operated (manual control panels are equipped in the cover under the front window).
    Passengers can enjoy the scenery from the front window.
    Speed indication is based on the GPS measurement.
    0:11 Gombak
    3:05 Taman Melati
    5:35 Wangsa Maju
    7:26 Sri Rampai
    11:19 Setiawangsa
    13:17 Jelatek
    15:00 Dato' Keramat
    16:58 Damai
    18:48 Ampang Park
    20:37 KLCC
    22:57 Kampung Baru
    24:35 Dang Wangi
    26:37 Masjid Jamek
    29:06 Pasar Seni
    31:49 KL Sentral

Komentáře • 31