Road Projects: From Start to Finish

Sdílet
Vložit
  • čas přidán 21. 07. 2024
  • Road construction projects take an enormous amount of preparation because there are many components that must be addressed before any roadwork begins. Stages of a project include identifying a problem, planning, funding, site preparation, and construction.
    City of Edmond: www.edmondok.com
    #CityofEdmond

Komentáře • 14

  • @dovecry5560
    @dovecry5560 Před 3 lety +1

    Great job on this video. Really like the blueprints

  • @campbellsadeghy213
    @campbellsadeghy213 Před 3 lety +1

    Great video! Very informative and interesting.

  • @SwopLux
    @SwopLux Před 2 lety

    What’s the budget for PR from start, during and finish.

  • @naseralkatool8371
    @naseralkatool8371 Před 2 lety

    Hello sir, I am from Jordan and I have experience in construction work and I am ready. Can you bring me from Jordan?

  • @paulradebe8917
    @paulradebe8917 Před 2 lety +2

    Hello sir I am from South Africa and I have experience in Mechenical engineering as a welder and also I got Heavy duty drivers license I want to be there.

  • @jayz4dayz763
    @jayz4dayz763 Před rokem +1

    3 to 4 years before construction can even start, wow explains why it always seems like shit never gets done.

    • @mctrevors7852
      @mctrevors7852 Před 3 měsíci

      Absolutely!.. that's why China somehow gets things done quick

  • @marilynculbreath4660
    @marilynculbreath4660 Před 3 lety

    The

  • @jacobwagganer1953
    @jacobwagganer1953 Před rokem

    5 years is unacceptable, because you plan for traffic as it was 5 years ago, thus you build for traffic accommodations that were needed 5 years ago. By the time the project is done, the new road has already hit its capacity if not maybe just short of it IF you’re lucky. If it’s gonna take 5 years to even start construction on a new/ improved-widened road, at least plan for the growth 15 years to even 20 years out. If a road is 2 lanes, one in each direction, and it’s gonna take you 5 years to widen it to 4 lanes, 2 in each direction, you might as well spend the extra money making it 6 lanes, 3 in each direction, with good turn lanes, sidewalks, lights, and other utilities. Look I hate the concept of stroads but that’s what we use in the Us, so let’s at least make them good.

    • @KrytonFenna
      @KrytonFenna Před rokem

      Only if transportation engineering was this easy. the AADT (Average Annual Daily Traffic) and average growth factors for successive years (there are economic analysis table already stablished for all kinds of cities and town) for the same is calculated (minimum they take is 20-40 years (doesn't usually go higher for unknown factors, hence rehabilitation is preferred) depending on the region, type of axle load(vehicle class), population, directional distribution and a lot of other factors. some major highways are designed to last even longer due to access and disturbance caused by rehabilitation. (I'm not a transportation engineer but a Civil one :) )

  • @justinw7323
    @justinw7323 Před 2 lety +1

    Our idiotic local road workers take forever 😂 like a year to do a single road.

  • @YoungPatriot-cz1sq
    @YoungPatriot-cz1sq Před 6 měsíci

    Jesus Christ is lord

  • @deannaspencer8988
    @deannaspencer8988 Před rokem +1

    All Stores 900,000 Please Lower the price of all Brands of Military Equipment and Local for All Brands of Highway Equipment Products and Production Cost Now 900,000 That's Too Much $$ 900,000 Now The Whole World 900,000 Now 🙏 🤲 🕍 🕌 ⛪ 🛕