Excavator Hitachi 870 XXL - telescopic boom - demolition site

Sdílet
Vložit
  • čas přidán 21. 08. 2024
  • The building at Hellersbergstraße 2 to 4 was demolished by wiwa-abbruch.de/. Before being used as a vaccination center, the building was used by the Toshiba company.
    Currently on the construction site: Liebherr 960 Demolition, CAT 352 NG, Cat 345D and three Hitachis.
    Wiwa Wilko Wagner from Hamburg in Neuss
    #ConstructionWorldXiuMei
    www.kafril.de/
    #Hitachi870XXL
  • Auta a dopravní prostředky

Komentáře • 9

  • @dennyfriedrich976
    @dennyfriedrich976 Před 5 dny

    My friend Thommy 👍

  • @25vrd48
    @25vrd48 Před 6 měsíci

    Several exciting scenes . Good operator .

  • @andyhughes5885
    @andyhughes5885 Před 9 měsíci +1

    A perfect example on how to ruin what could have been an excellent video. 1, make sure you do not zoom in to get a clear and up close view of the work and 2, make sure the camera is placed directly behind the boom on the excavator so that the entire proceedings are obscured from view. Same goes for all the other videos from this uploader.
    If, you don`t know what zooming in means, you did it at 43:18 mark - that would be perfect from the very start.

  • @inescividanes2403
    @inescividanes2403 Před 8 měsíci

    bom profissional. Parabens

  • @davidjeffreys9063
    @davidjeffreys9063 Před 6 měsíci

    I've seen a stronger spray of water when treating ya garden greenery for black fly

  • @jmlec7817
    @jmlec7817 Před 10 měsíci +1

    The watering is ridicuolus :)

  • @warrenwills3251
    @warrenwills3251 Před 10 měsíci

    These guys must get paid by the hour

  • @user-hy8cs8or6i
    @user-hy8cs8or6i Před 3 dny

    so schaut also ein Abrissbagger von hinten aus?🤭🤭🤭🤭

  • @ArtoTanttu
    @ArtoTanttu Před 7 měsíci

    Nyt on 31/12-23 niin mikä on tilanne nyt ja hyvää Uutta vuotta teille kaikille ja parempaa vuodelle 2024:lle.