Kanban WIP limits - Agile Coach (2019)

Sdílet
Vložit
  • čas přidán 21. 08. 2024

Komentáře • 69

  • @montyindaghetto
    @montyindaghetto Před 4 lety +19

    Damn Sacha, really dropped the ball on that one bro.

  • @biophilic23
    @biophilic23 Před rokem +4

    great teaching. The way you teach by doing simple stuff is magnificent

  • @NicoleTeacher
    @NicoleTeacher Před 3 lety +2

    That demo with Sacha was perfect! This video was very useful. Thank you.

  • @luangasco
    @luangasco Před 2 lety +6

    Wait, isn’t lead time the time when the ticket got created to when it went live? You explained cycle time instead if I am not wrong which is when the work started on the ticket to when it went live.

  • @dominiquelambert6221
    @dominiquelambert6221 Před 2 měsíci

    What you described as Lead Time is actually Cycle Time. Lead time is longer and starts with when a customer request has been made. Besides that, cool video, although there are way more ways to determine WiP, and we could also look at what´s the WiP when technically everybody can do everything ;-)

  • @HK-yo4se
    @HK-yo4se Před 5 lety +5

    Concurrent work styles are the new sexy thing in engineering. But it is good to see, that you guys see it the same way. As line manager I always pushed for the serial production style. Do one thing at a time. You will be more focused and get the things done. Further your clients love it. Because you'll keep your promises for the due date.

  • @r3bennett
    @r3bennett Před rokem +2

    I loved the ping-pong ball analogy. I'm going to use it with my team today.

    • @Atlassian
      @Atlassian  Před rokem

      We're sure your team will love it just as much 🙌🏻

  • @thaboshikwambane
    @thaboshikwambane Před 4 lety +14

    Sasha is legit standing like a guy from a video game😂

  • @sanchezboyz01
    @sanchezboyz01 Před 3 lety +1

    Awesome vid, tomorrow I will have a meeting where I will propose wip limit and will use your example, thanks pal!

  • @gowris21
    @gowris21 Před 3 lety +2

    Fantastic Video.. Loved the simplistic way in which the concepts are explained..

  • @timm439
    @timm439 Před 5 lety +6

    There seems to be an obvious gap in explanation here. In the 4-6-2 WIP example, what happens when columns further to the right are holding things up due to their WIP limit? So testing is capped at 2, but developers complete another card but have nowhere to put it, and can't take a 7th card? It seems like there needs to be intermediate columns of backlog between each step in the workflow.

    • @pdf150
      @pdf150 Před 5 lety +6

      You could do that or maybe you could help out your tester so that they finish their work (cards) in order to free up space for another development card.

    • @tommy_morgan
      @tommy_morgan Před 4 lety +8

      Adding intermediate backlogs is a natural inclination but will result in excess inventory of cards building up. Developers will continue to put cards into the intermediate backlog and testers will still only be able to handle 2 cards at a time and will never catch up. The concept is covered beautifully in the book The Goal: A Process of Ongoing Improvement. In this scenario, it seems like testers might be the system's constraint. To resolve this problem more testing capacity needs to be added either by borrowing developers for testing or hiring additional testers.

    • @deldia
      @deldia Před 4 lety

      Patrice David Förster help out? What if you don’t know how?

  • @stank9076
    @stank9076 Před 3 lety

    Very good series on Kanban for beginners!

  • @aboel3zz
    @aboel3zz Před 2 lety

    Simpel and great video, you made it easy for me to exaplain WIP for others, thanks.

  • @talafim
    @talafim Před rokem +1

    Thanks for the video, straight to the point 👌

  • @franciscocobos2018
    @franciscocobos2018 Před 4 lety

    Great and simple video to help teams how to limit their WIP. Highly recommended! Btw, missing Chet Wrong videos, "The Wrong Way to do Agile", hilarious :-)

  • @Seema98709
    @Seema98709 Před rokem

    Thank you.... now I m able to correlate everything to my job.

  • @geekychicster
    @geekychicster Před 3 lety

    Great analogy! Really helped to fully understand WIP

  • @MrJatinderseehra
    @MrJatinderseehra Před rokem

    Thanks, a really useful series of videos, you explained kanban very clearly.

  • @Vasanthvdevskp2023
    @Vasanthvdevskp2023 Před rokem

    Great teaching... Thanks for your wonderful lecture

  • @jasonhorine9010
    @jasonhorine9010 Před 3 lety +2

    Nice videos. However, the canned background music during dialog is a distraction.

  • @brandongoldsmith4633
    @brandongoldsmith4633 Před rokem +2

    3 x 2 = 4?

  • @kristinludlowUX
    @kristinludlowUX Před 6 měsíci +1

    You have specialists for a reason. Does it make sense to teach your devs how to design? Unless they have that specific skillset already, isn't this a problem for the quality of the work coming out of your design team? As a designer, I'm pretty sure they don't want me doing their dev work.
    Small orgs w/ small teams on small projects need generalists. I get that, being I was one. But large orgs w/ large teams working on large projects will feel the impact of a poor user experience by cutting corners this way. You're just moving crappier work faster.

  • @deldia
    @deldia Před 4 lety +1

    Is that the definition of lead time? Normally that would be the difference between when you have something to do and when it starts to be done.

  • @yuukistraussable
    @yuukistraussable Před 3 lety

    flawlessly explained wtf?

  • @robertmiller8110
    @robertmiller8110 Před 4 lety

    Awesome videos, man!

  • @HassanAmin77
    @HassanAmin77 Před rokem +1

    As a project manager, you don't always have control over number of WIP items in a specific column. For example, a developer/development team will finish many tickets on any given day and assign those to QA column. QA team(or even a single QA member) would then work through them at their own pace. WIP limits don't help with the natural workflow and planning of projects.

    • @Akos861223
      @Akos861223 Před rokem +1

      That is the goal of kanban. In this case, it is clear that you have a bottleneck in QA. Kanban with its WIP limits have shown it to you, so you know where to intervene :)

    • @barneylaurance1865
      @barneylaurance1865 Před 4 měsíci

      In Kanban the dev team shouldn't *assign* their complete to tasks to the QA column. Instead the dev team must just declare their work done and let the QA team *pull* the tickets into their column when they have capacity to do so.
      If QA never has capacity and no-one else can get tickets QA'd then eventually the dev team's column will become full as well, because there's no point developing endless things if no-one's testing them.

  • @okyfauzulzakina7337
    @okyfauzulzakina7337 Před 4 lety

    Thank you so much for the videos, really help me so much :D

  • @divyavinod6131
    @divyavinod6131 Před 2 lety

    excellent presentation

  • @shreyavibhav7418
    @shreyavibhav7418 Před 2 lety

    PERFECT!

  • @Amorske215
    @Amorske215 Před 3 lety

    my boy Sasha though,, lol
    otherwise I like the video also. Great information,

  • @sashakatwon4906
    @sashakatwon4906 Před rokem

    thnx!

  • @joe72205
    @joe72205 Před 2 lety

    "Work in Process" is probably a better description, otherwise people tie this to an "In Progress" column instead of "The entire process from ideation to delivery". And, twice as many items as people seems kind of crazy - a team with 5 people should probably still work on 1 large item at a time, not 10 different small items at a time.

  • @dianamusic247
    @dianamusic247 Před 4 lety

    Thank you so much for these videos. They are really helpful. ;)

  • @visualpmpacademy2230
    @visualpmpacademy2230 Před 2 lety

    Good Effort

  • @veronicaolivares9150
    @veronicaolivares9150 Před 4 lety

    Lovely!

  • @crawlinginfilm9683
    @crawlinginfilm9683 Před 3 lety +1

    1:05 Lav mic needs to be on camera-side, always

  • @chielichiel
    @chielichiel Před rokem

    thanks!

  • @haaruukaax
    @haaruukaax Před rokem

    Let Sasha SPEAK!!! I like SASHA!!!

  • @silvermediastudio
    @silvermediastudio Před 2 lety

    1:30 Sasha's face..... "really brah??"

  • @fnmk8864
    @fnmk8864 Před rokem +1

    ~3:00 Don't
    Don't you mean 4 for Develop and 6 for Design?

    • @ivana4942
      @ivana4942 Před rokem

      He said you have 2 designers, 3 developers, and 1 tester. 2:42

  • @Divine-uk4ky
    @Divine-uk4ky Před 4 lety

    too good

  • @MacMcCaskill
    @MacMcCaskill Před 4 lety +1

    How was the number of cards arrived at?

  • @dantepraxedis
    @dantepraxedis Před 3 lety

    Reeelax Sasha....

  • @diablo4ever868
    @diablo4ever868 Před rokem +1

    in czcams.com/video/zEJn6eQO6FE/video.html why did we place 4 for design and 6 for develop. I thought we were multiplying by 2? I don't get it or was this a typo?

    • @ivana4942
      @ivana4942 Před rokem

      He said you have 2 designers, 3 developers, and 1 tester. 2:42

  • @supakev97
    @supakev97 Před 6 měsíci

    Am I the only one who got lost on the WIP limit math with the post-its?

  • @SarthakMohanty
    @SarthakMohanty Před 4 lety +2

    What if someone in the team is a developer as well as tester? Kind of a cross functional situation

    • @quantify218
      @quantify218 Před 3 lety +2

      WIP limits are set per stage of work, not per individual. The columns on the board should reflect how your work progress.

  • @Justfocusfitness
    @Justfocusfitness Před 3 lety

    nice

  • @SV-tc8cu
    @SV-tc8cu Před 2 lety

    Sascha looks sad. No wonder he does not work for Atlassian anymore

  • @skaterdude14b
    @skaterdude14b Před rokem

    1:30 That’s not how things work

  • @jorgeluiscastrotoribio650

    What is the name' s coach?

  • @julianildau3601
    @julianildau3601 Před 4 lety +3

    bruh u need stop staring into my soul and focus a lil more on teaching me stuff

  • @user-bt2ef3nx4x
    @user-bt2ef3nx4x Před 2 lety

    Man who are you referring to when say 'teach other team members skills like design and testing'??? PM would teach designers to design and testers to test? Would you like to teach developers to develop? Super arrogant.

  • @loukaewington-pitsos5071

    this is cringe