Investigative Documentaries: Pagkasira ng proyektong kalsada, ano nga ba ang dahilan?

Sdílet
Vložit
  • čas přidán 12. 12. 2019
  • Aired (December 12, 2019): Taong 2022 sana ang target completion date ng Capas-Botolan Road project na siyang magdudugtong sa Tarlac at Zambales. Ngunit, hindi pa man tapos, unti-unti na itong nasisira. Ano nga ba ang dahilan kung bakit nasisira ang mga proyektong kalsada na dapat sana’y mapakikinabangan na?
    Hosted by veteran journalist Malou Mangahas, ‘Investigative Documentaries’ exposes their findings on corruption in the government and provides in-depth analysis on current national issues.
    Watch it every Thursday, 8 PM on GMA News TV. Subscribe to / gmapublicaffairs for our full episodes.#InvestigativeDocumentaries
    GMA promotes healthy debate and conversation online. Any abusive language that does not facilitate productive discourse will be blocked from this post.
    GMA upholds ethical standards of fairness, objectivity, accuracy, transparency, balance, and independence.
    Walang Kinikilingan, Walang Pinoprotektahan, Serbisyong totoo lamang.
    Subscribe to the GMA Public Affairs channel: / gmapublicaffairs
    Visit the GMA News and Public Affairs Portal: www.gmanews.tv
    Connect with us on:
    Facebook: / gmapublicaffairs
    Twitter: / gma_pa

Komentáře • 65

  • @arnie_barney
    @arnie_barney Před 2 měsíci

    Corruption!

  • @rogeliogalvizo1663
    @rogeliogalvizo1663 Před 3 lety

    Sewer systems

  • @adadtv.7201
    @adadtv.7201 Před 2 měsíci

    Corruption po ang sagot.

  • @TeamPhilippines
    @TeamPhilippines Před 4 lety +6

    They should Prioritize the Drainage system if the Roads are from Mountainous Regions.

  • @xingzingxoxoxo6325
    @xingzingxoxoxo6325 Před 4 lety

    Kickbacks

  • @rogeliogalvizo1663
    @rogeliogalvizo1663 Před 3 lety

    Sainol sonft era brigade street

  • @xingzingxoxoxo6325
    @xingzingxoxoxo6325 Před 4 lety +1

    Ung Pondo pagkakasyahin daw sa mga bulsa nila. DPWH crocodile farm.

  • @amazinggrace3292
    @amazinggrace3292 Před 3 lety

    make vdeo sana sa dami ng road ginagawa ,ala pan 3 months biyak n daan.paulit ulit.gaya nun sa guimba,talugtog nueva ecija

  • @katfrozenheaven
    @katfrozenheaven Před 3 lety +1

    Hahaha! Di daw pwede yung mga politican maging part ang business sa government project. Ano na lang dito sa probinsya namin, may ari ng mining company, kontrolado ang dpwh, contractor pa, at pag-aari "daw" yung pinakamalaking quarry dito. Wala na talagang mas kakapal ng mukha tong mga politician.

  • @rogeliogalvizo1663
    @rogeliogalvizo1663 Před 3 lety

    Pole brigade carkerete brigade strong cancarete

  • @joeljacinto8202
    @joeljacinto8202 Před 4 lety +2

    walang maayos na daluyan ng tubig kaya laging masisira yan.pero daluyan ng bulsa tyak meron dyan.

  • @quatogagapito9491
    @quatogagapito9491 Před 4 lety +2

    Halos lahat ng proyekto ng DPWH region 3 ay puro substandard.. uwag n kau lumayo.. sa Mc Arthur Hiway n lang Makikita u na agad.. Mula valemzuela hanggang pampanga... sa bulacan. Mula Tabang hanggang san miguel.. bulacan.. Para kang dumadaan sa buwan Lalong Lalo na kung Tag ulan.. . sa dami ng butas at di pantay na patrabaho ng DPWH sa mga kalsada dyan...

  • @sandstormondesert1931
    @sandstormondesert1931 Před 4 lety +1

    Napansin ko lang bakit walang Kanal sa tabi ng Bundok at kung saan papunta ang mababa area lagyan ng embornal para doon dumaloy tubig at hindi masira senimento

  • @elyserva7903
    @elyserva7903 Před 4 lety +1

    May nagkakapera dyan sa district ng DPWH. Kagagawa lang ng kalsada wala pang isang taon binubungkal na naman. Dapat may consultant, medyo gagastos ng konti pero sigurado ang trabaho at merong mananagot kung hindi pumasa sa quality ang project.

  • @inotsejlee4657
    @inotsejlee4657 Před 4 lety +1

    Ang dpat managot Jan except sa contractor ung engineer ng DPWH, dpat pingplanuhan nilang mabuti ang trabaho bago sinimulan.
    8 billion, 2 lane, 66klmrs?tas ganyang hitsura? Halata masyado..mapanagot Sana Kung sinu ang my Kapabayaan sa project nato di biro ung halaga.

  • @downpourmaker8058
    @downpourmaker8058 Před 4 lety +1

    punta kyo camsur di matapostapos ang kalye... lalo n yung andaya highway

  • @realcindydadrana1903
    @realcindydadrana1903 Před 4 lety

    GMA dapat hinalungkat nyo kung kailan nag umpisa nag project na ito bast nyo lang sasabihin na 2016,baka akalain nila sa present admin ito . napondohan yan under ODA ng Japan nung 2013 hanggang ngayon di pa matapos tapos ang bilyon bilyo na road project na yan .in short may pondo na yan under dpwh region 3.basahin nyo kabuuan ng project at ngayon pinagpapatuloy pa kasi may pondo na talagang nakalaaan ,sisihin nyo dyan officials na mga kurakot.

  • @chitoglendeslate3432
    @chitoglendeslate3432 Před 4 lety +2

    Cant undetstand bakit 2 hiwalay ang contractor sa isang project
    Sana isang contractor lang

    • @PHnewsMedia
      @PHnewsMedia Před 4 lety

      Panoorin mo ulet pre. Kung alam mo ang Math dapat alam mo na ang sagot

  • @franciscoverra2307
    @franciscoverra2307 Před 4 lety +1

    Bantayan Lang nang regional dpwh kasi bagong gawangdaan madaling bumigay Kaya kailangan maseason at maayos compacted bago concreting

  • @aileenberia1762
    @aileenberia1762 Před 4 lety

    👋👋

  • @amazinggrace3292
    @amazinggrace3292 Před 4 lety

    well drainage should b,tatawa tawa pa c sir

  • @latteti8627
    @latteti8627 Před 4 lety +1

    Pakidocument ngarin po yung mga kalsada namin dito samin maganda at matibay ehh binubutasan para masira hahahah

  • @allancuaresma08
    @allancuaresma08 Před 4 lety

    Walay Au gehapon🙁🙁🙁

  • @hunter2alec552
    @hunter2alec552 Před 4 lety

    Isisi sa bagyo ganun idi wow

  • @aikzyco2772
    @aikzyco2772 Před 4 lety

    Nakakatakot naman dumaan diyan pag tag-ulan parang death hiway. Hindi masusing pinag-aralan. Walang simulation basta gawa lang ng gawa. Ang kipot pa kumpara sa Daang Kalikasan.

  • @vincevillarin477
    @vincevillarin477 Před 4 lety

    The interpretation of RA 6713 by non-lawyers in this program are wrong.

  • @tessapolancos2122
    @tessapolancos2122 Před 4 lety

    Maliit na portion lang naman yan.. dapat ayusin nalang yan at gawan nang paraan nang contractor..

  • @user-ch7ht8eq5g
    @user-ch7ht8eq5g Před 4 lety +5

    Sympre alm naka safe n s kanilang "BULSA” ung budget🤬🤬🤬 Pinas nga nnn

  • @inspictah
    @inspictah Před 4 lety

    Corruption ang isa sa dahilan.. under materials

  • @juantamad1776
    @juantamad1776 Před 4 lety

    Malaking bagay ang pagsisiwalat sa taong bayan ng mga proyektong ganito para mapanagot ang mga opisyal ng gobyerno at mga kontraktor na kasabwat nila.. Kadalasan kung sino ang Contractor na pinakamalaki ang bigay sa opisyal ang nananal0 sa public bidding.

  • @venergarcia7835
    @venergarcia7835 Před 4 lety

    parang ang nipis nman ng semento nla pati ung mga bakod nya na nasira parang ipinatong lng na batuhan.. ung signage din kakapiranggot lng na semento ang nilagay paanong d masisira un

  • @franciscoverra2307
    @franciscoverra2307 Před 4 lety

    At least malaki PA Yong funds na d na release bantayan lang

  • @chancellorasher9417
    @chancellorasher9417 Před 4 lety

    So basically both parties didn’t do a proper planning and research before the roads construction. 9:59 shoulda ask my fellow engg here, he knows what tf he talkin bout

  • @rinkumoshika1786
    @rinkumoshika1786 Před 4 lety

    Gawan nlng ng tulay kc ganun ung ginawa sa isang napanood ko laging nasisira o gumuguho ung lupa Kaya ginawan nila ng tulay kahit walng tubig

  • @med2517
    @med2517 Před 4 lety

    Bat yung 2 contractor di naman nasira yung sa kanila, magkaiba bang bagyong dumaan sa isang contractor na gvdpm, haha? Parang napaka incompetent naman humahawak ng project na yan. Sa planning at research pa lang sumablay na. Ang ganda pa naman tignan sa aerial view.

  • @dm1922
    @dm1922 Před 4 lety

    dahilan? CORRUPTION . lagay lagay lang yan

    • @comebackfailed6350
      @comebackfailed6350 Před 4 lety

      tama! dati akong engr ng contructor ng dpwh and totoong may malalaking SOP na nangyayari dyan.

  • @jachammer6423
    @jachammer6423 Před 4 lety

    tinitipid ang simento halata naman...sa balwarti ng mga SUAREZ SA QUEZON PROVINCE wala pang 5years sira na agad ang kalsada...

  • @Renso1278
    @Renso1278 Před 4 lety +1

    Dpwh.. Tulog tulog pag may time....

  • @internationaldirector2917

    Mahina ang mga contractors dapat alam nila ang eventualities like baha. Kung titipirin at kurakutin madaling masira iyan please lang Duderte administration na tayo gone sa mga walang kuwenta na walang iniisip kundi bulsa before service.

  • @leoacido24
    @leoacido24 Před 4 lety +1

    Project ni villiar yn db

    • @misss.7863
      @misss.7863 Před 4 lety

      Kasama yan sa infra projects ng MGA nagdaang administrasyon na tinutuloy ng Duterte government.

  • @dugoy.ph.9619
    @dugoy.ph.9619 Před 4 lety

    wala kasi kanal..kaya nasisira agad kalsada...

  • @ayeeeh
    @ayeeeh Před 4 lety

    Kasi pera pera 😔🥵🙄🙄

  • @swthrttess9642
    @swthrttess9642 Před 4 lety

    Sino nagnakaw? Hindi ako ha? Tama na bolahan. Daming palusot.

  • @comebackfailed6350
    @comebackfailed6350 Před 4 lety

    matagal na yan. hindi siguro nasayahan si congresswoman sa bigay sa kanya hahahahaha or baka may balita na tatakbo si mayor sa congress kaya sinesecure na ni congresswoman yung magiging kahalili niya for this coming election.
    bayad (SOP daw) naman mga officials dyan from congresswoman, district engineers, project engineers, inspectors. chief ng QAU, planning, construction. basta lahat ng pipirma sa billing niyan bayad.

  • @crissvalentin3873
    @crissvalentin3873 Před 4 lety

    Lakas managa ehh

  • @danjequiseolopez9850
    @danjequiseolopez9850 Před 4 lety

    Kurap tlaga

  • @user-zs9ek1bx5z
    @user-zs9ek1bx5z Před 4 lety +2

    ☝️ (opinion) *this is a proof that MEDIA plays important role on making an unused important projects to be public* 👍
    *SAD that there was project like this - can not be used by the PEOPLE* 😔
    ☝️ *HOPE that all the CONCERNED AGENCIES & DEPARTMENTS will be alarmed and made an immediate ACTIONS so that it will NOT be wasted and will be INVESTIGATED & LEGAL actions will be implemented* 👍😔

  • @pololoygalvez9542
    @pololoygalvez9542 Před 4 lety

    Kumusta na ang pagawa ng dds jan? Di ba kay digong na ito? Ano na,kumusta na mga dds?

    • @realcindydadrana1903
      @realcindydadrana1903 Před 4 lety

      Hahahahahaha anong kinalaman ng duterte admin dyan,half ng 2016 si duterte umupo at lahat ng project 2017 nag umpisa sa kanya.itong project NATO nag umpisa nung 2013 under ODA ng Japan.pinagpatuloy nila kasi may pondo na ang dpwh region 3.helllooooo Aquino na ito hahahahahahaha