  • @jeanrafes
    @jeanrafes Před rokem +33

    A good idea is to cover the grate with tape when putting in the cement, then remove once the job is done and dry. Saves cleanup

  • @toddmichon
    @toddmichon Před 2 lety +10

    Always good to go back when it's raining to capture footage of the drain working to show in the video.

  • @calvancandy8384
    @calvancandy8384 Před rokem +3

    Get yourself a mortar gun for filling in the sides saves a lot of work - great video 👍

  • @maxiscooterridescapetown-g2217
    @maxiscooterridescapetown-g2217 Před 9 měsíci +1

    This is my nexj job to tackle before winter returns....

  • @larrypoole3906
    @larrypoole3906 Před 2 lety +6

    Great work. Put some masking tape over the drain during install to keep the concrete out.

  • @emanibrahim7275
    @emanibrahim7275 Před 6 měsíci

    Wonderful video wonderful work it looks very good

  • @deirdremkenny
    @deirdremkenny Před rokem

    Great video, thanks so much for sharing

  • @jamesgallagher3317
    @jamesgallagher3317 Před rokem +7

    If you left my drive looking like that with patches of cement everywhere you'd be paying for the removal of the patches. A good job is a tidy job and that is far from tidy

  • @bytejuggler
    @bytejuggler Před 3 lety +1

    Nice job, thank you.

  • @diskonekted3724
    @diskonekted3724 Před 3 lety +1

    Hello, great video - many thanks for taking the time. A question, you're using a 110mm reducer, but doesn't the end cap take a 90mm socket?

  • @DeanPhilips-pr3hl
    @DeanPhilips-pr3hl Před rokem +2

    Its meant to sit on a concrete bed not mortar. Why mortar bed?

  • @Gert834
    @Gert834 Před 2 lety +1

    Why do the channels bend upward after clipped together? When you clip more than three both ends bend upwards. If you press it flat it just disconnects

    • @Nmag27
      @Nmag27 Před rokem

      For long runs, I think I've used 3 m lengths. Less joints = better

  • @cameronmckendrick1464
    @cameronmckendrick1464 Před 6 měsíci

    How much would a job of this size typically cost if hiring someone?

  • @davidscalpscrypto9053
    @davidscalpscrypto9053 Před rokem +2

    Not gonna lie I clicked this video because I taught Andrew Tate has a new channel of building things

  • @vickipps6821
    @vickipps6821 Před 2 lety

    Thank you

  • @jddownes1
    @jddownes1 Před rokem

    What size grinder blade did you use to cut into the concrete?

  • @mrjweate
    @mrjweate Před 2 lety

    I have a bend in my trench. I need to connect 2 drain pieces at a slight angle. How can I do that?

    • @Nmag27
      @Nmag27 Před rokem +2

      I've cut them with a circular saw before and finished with a handsaw. I cover all external parts of joints with cloth tape before pushing into mortar/concrete because even the clip-together joints are not sealed enough to prevent a little slurry from entering the joint when you're pushing it down in case a long drain flexes a little at a joint. So tape your joint on outside or care not to overfill bedding and place each section in, then silicon your joint from inside before filling sides.

  • @erdalgultaslar2527
    @erdalgultaslar2527 Před 2 lety +2

    Travaille pas propre

  • @rickyyoung5880
    @rickyyoung5880 Před 2 lety

    What’s a

  • @Aphony66
    @Aphony66 Před 3 lety +1

    Hahahaha, jul boere!