  • HELLO, DOMS tail just over hanging the lake almost all of its gym fit body over land, some segment on the moving platform and a run over no mans land towards the tunnel entrance at copthall, very hot day and the poor guys in orange had to wear full ppe must of been boiling....copthall tunnel coming soon on the next one....

Komentáře • 19

  • @glennrochester2428
    @glennrochester2428 Před 2 měsíci +3

    I loved being able to see the huge concrete sections being moved by what looks like a special vehicle towards the crane for connection and then (later on), it will be dropped neatly onto the vertical columns or attached to the end of an already cantilevered section. Such clever engineering and assembly.

    • @SIMONC256
      @SIMONC256  Před 2 měsíci

      this is a serious work of art, really pushing what can be done...very sexy as well

  • @Jamie92208
    @Jamie92208 Před 2 měsíci +7

    Some great shots there. Thanks.

    • @SIMONC256
      @SIMONC256  Před 2 měsíci

      thanks mate, it came out ok..

  • @gingertom2355
    @gingertom2355 Před 2 měsíci +3

    Superb once again SimonC. Soundtrack👌. That's the first coverage I've seen from any of those covering the viaduct construction for the area south of it you've covered. Found the close up of the bridge section transporter vehicle fascinating. Looks to be semi - autonomous.

    • @SIMONC256
      @SIMONC256  Před 2 měsíci +1

      @@gingertom2355 thanks, I want one of those transporter things really cool, it lowers down under the segment then lifts it up, very nice...

  • @Carlos-im3hn
    @Carlos-im3hn Před 2 měsíci +4

    Majestic segment movements. The curves. The colors. Discrete views of HS2 Colne Valley and Dominique. From end to end your best production. There should be awards. 🎉 3:18

    • @SIMONC256
      @SIMONC256  Před 2 měsíci +3

      @@Carlos-im3hn thanks mate, at last I caught the segment movement platform in action...

  • @DaveFiggley
    @DaveFiggley Před 2 měsíci +1

    Towards the end there I thought you were going to lose your little flying buggy down the throat of Mr. Copthall, dear. Pulling out at the last minute is always the sensible option.
    Yeah, good scenes circa 6:30 with Sir Dom's landing strip in place and, on the right, the landscape 'adjustments' in full swing for the Ickenham substation.
    I agree about the satsuma people. It must have been fairly uncomfortable but that's probably addressed in their contracts. You and I are paying for them to swelter in all that fancy gear. Anyway, it was nice to see them running around while I was sitting on the patio gulping down gallons of perfectly cooled (very cheap) cider.
    The soundtrack works well with this. It could be a generic free-to-use piece or it could be by someone I've heard of. It's sometimes hard to tell.
    Keep 'em coming SIMONE ... 👍

    • @SIMONC256
      @SIMONC256  Před 2 měsíci

      at the end by the tunnel i lost signal and it went into return to home mode, i have been into the tunnel just to see how far i could go, its the electrical lines on the pylon this farts out so much interference it freaks out the compass/signal on the drone, working on a way to boost the signal a little... oh and the music was by madis "carrying the fire" jarre ish... copthall tunnel on the next one..thanks for popping in do come again just if you could flush the toilet next time that thing you left in there wouldn't flush for days😆

    • @DaveFiggley
      @DaveFiggley Před 2 měsíci

      @@SIMONC256 Yeah. Floaters. It's IBS, dear. I need to eat more cabbage.

  • @RitaFarrow
    @RitaFarrow Před 2 měsíci +1

    thanks for this ,have to say the next does not ready to carry on with viaduct,in my eyes that should be ready ,they have had enough time to get it ready ,just to carry on with the continuity of the build,great content as always

    • @SIMONC256
      @SIMONC256  Před 2 měsíci +1

      give it time it has to be perfect and the build has to be spot on the amount of stress this will have to take for years to come is off the chart...thanks for watching,

    • @Carlos-im3hn
      @Carlos-im3hn Před 2 měsíci

      I can watch and listen many times. SIMONC gets sooo close !! Truely intimate Dominique for HS2 train fans and followers. Thank you.

  • @ianhart3048
    @ianhart3048 Před 2 měsíci +2

    An action-packed flight! Wonderful stuff! Great choice of music - Jean-Michel Jarre again?

    • @SIMONC256
      @SIMONC256  Před 2 měsíci +1

      thanks,, the track is carrying the fire by madis

  • @StephenWalker42
    @StephenWalker42 Před 2 měsíci +1

    Wow, that's a SPT delight, (Self Propelled Transporters) you have it all in segment movement....😊....

    • @SIMONC256
      @SIMONC256  Před 2 měsíci

      that spt is a cool bit of kit, it lowers its self slips under the segment then lifts it up, remote controlled by the guys in orange , been waiting ages to catch it in action...