Day 59 | Roof beam assembly almost completely done | House Construction

Sdílet
Vložit
  • čas přidán 11. 09. 2024
  • Day 59: After today’s work, roof beam assembly is almost completely done.
    #RoofBeam #Biga #BeamAssembly

Komentáře • 2

  • @nolimesia1786
    @nolimesia1786 Před 3 lety

    Sir ilang metro ang beam nyo at ilang steelbar anong mm ?

    • @JetIchiroTV
      @JetIchiroTV  Před 3 lety +1

      11 meters po yung mahahaba sir tapos 7 meters naman po yung iba. 8 po na 16mm sir yung rebar tapos 10mm po stirrups