015. Turnout Project Pt 3: The Dwarf Signals

Sdílet
Vložit
  • čas přidán 30. 10. 2022
  • Preparing and installing dwarf signals for your Tortoise Switch controlled turnout on your H.O. scale model railroad. This is part 3 of a 4 part turnout project.
    The Dwarf Signals can be purchased on Amazon at the following link:
    10 Set Signal Housing, LEDs and Resistor: amzn.to/3DYpZlT

Komentáře • 13

  • @natbarr
    @natbarr Před rokem +1

    As a wood worker. It hurts watching you use that chisel to scrape the ballast... lol. Great video!!!

    • @BillMastersMRR
      @BillMastersMRR  Před rokem +1

      I get it :D . I actually bought them specifically for model railroading.

  • @rogerbivins9144
    @rogerbivins9144 Před rokem +1

    Thanks for the tip. These will be great to add to the layout I'm building.

  • @stamrly418
    @stamrly418 Před rokem +2

    You could turn them 180 deg and show the locomotive has the road set for the main OR siding and the “Authority to proceed” Through the turn out in the trailing direction without derailing [ dependent upon the type of switch motor used.] They could also be on the side of the engineer in both cases.
    I do like them all the same and. Rule 1 applies “ its my railway and I do it my way!”

  • @lz1clr806
    @lz1clr806 Před rokem +1

    super video ............

  • @johncrisafulli201
    @johncrisafulli201 Před rokem +1

    Wonderful/ great job in showing wiring requirements. Bought these on Amazon, but no directions included. Maybe I missed it, realize you used solid wire, but what gauge wire? Thanks

  • @earlfreeman93
    @earlfreeman93 Před rokem +1

    I myself don't know if the dwarf signals in real life is done that way or not; but I do think it would be logical to have both signals on the engineer side of the locomotive as opposed to have one of the signals out of the view of the engineer; so placement is critical.

    • @BillMastersMRR
      @BillMastersMRR  Před rokem

      That aren't done that way in real life. You can do them both on the right very easily. Just move them a couple inches down the track. I'll probably do it that way from now on just to get people to stop bringing it up :D

  • @bootsnall8996
    @bootsnall8996 Před 8 měsíci +3

    The signals are supposed to be before the switch ??

    • @BillMastersMRR
      @BillMastersMRR  Před 4 měsíci

      On my layout they are ;) I'm using them more as a way for me to quickly see which way the turnouts is switched. Not so much for realism from an engineer perspective.

  • @richardaubel58
    @richardaubel58 Před rokem +2

    Aren't dwarf signals always placed on the engineer's side of the track? It seems like the signal on the diverging track should be located between the through rail and the diverging rail so as to be visible to the engineer.

    • @BillMastersMRR
      @BillMastersMRR  Před rokem +2

      Oh I'm quite sure that the way I use them wasn't done in real world applications. This is more for a way for a 500 foot tall human to quickly see which way track is switched. :)

    • @BillMastersMRR
      @BillMastersMRR  Před rokem

      You could also just use one dwarf signal instead of two. It the one on the right is green you know the track is switched to the right. If it's red you know the track is switched to the left. That would provide more of the realism that you seek. I like having lots of lights...