Detailed Estimation Strategy of Building Structure | 140 X 40 Ft (Part- 5) || By Civil Guruji

Sdílet
Vložit
  • čas přidán 8. 09. 2024
  • #civilengineerstraininginstitute #CivilGuruji
    Detailed Estimation Strategy of Building Structure | 140 X 40 Ft (Part- 5)
    Like Share & Subscribe
    Application Link :- play.google.co...
    Practical Training Detail:- • Practical Site Trainin...
    Register Now and Pay Later:- www.civilguruj...
    Download Estimation PDF :- Application me free webinar Course me available hai.
    Branch Address :
    1. DELHI - NCR
    Civil Guruji - 25, gate no. 1,
    behind kailash hospital
    knowledge park -1 Greater noida
    (201308)
    goo.gl/maps/a2...
    2. BHOPAL
    Civil Guruji :- at Hind convent school
    Naveen Nagar, Bhopal, Madhya
    Pradesh 462010
    3. LUCKNOW
    Civil Guruji :- at Prayag public
    school Sandaulli Umarpur ,Near
    Juggaur railway station road,
    Lucknow 225003
    About This Video :-
    The 'construction process' (sometimes called the 'construction stage') is the physical processes of building, landscaping or refurbishing plus all the associated activities, such as demolition, site clearance, administration and so on.
    The process of calculation of quantities and COST of various items in connection with the construction project is called an estimate. Building a construction step involve in any type of construction is not an easy task; perhaps it requires lots of afford and investment. Although, for building construction requires lots of time and it is tedious work, yet its result is a permanent asset for us. Therefore, care should be taken in building construction process. Before planning, building construction projects must consider important aspects like the purpose of construction, utility, financial proficiency, the demand for work, etc. In BAR BENDING SCHEDULE you will also get to know about different topics namely:
    1) What is BAR BENDING SCHEDULE.
    2) Advantages of BAR BENDING SCHEDULE.
    3) Why we use steel as a Reinforcement Bar.
    4) Type of Reinforcement Bar
    5) Size & Unit Weight of Bar.
    6) Bend Deduction & Value
    7) Clear Cover & Effective Cover
    8) Values of Clear Cover
    9) Standard Codes used for BAR BENDING SCHEDULE.
    Billing is the documentary aspect of the work done, through which payments can be made to the person involved in the contract and responsible to complete the work. Incomplete Billing can cause considerable losses to the contractor or the client. Hence, bills should be perfect and self-explanatory at any stage of the work. Bills from the work sites are to be prepared on a standard printed format. Find here the billing engineer roles and responsibilities along with the job description and salary details.
    Every organization should maintain certain procedural systems, methods, and norms for preparing bills and forwarding them through the right channels for payments to the client and contractor.
    Bills are generally prepared by the client, contractor, sub-contractor and different vendors for their payment and for the proper execution of the works at the sites.
    Quantity surveyors are responsible for managing all aspects of the contractual and financial side of construction projects. They help to ensure that the construction project is completed within its projected budget. Quantity surveyors are also hired by contractors to help with the valuation of construction work for the contractor, help with bidding and project budgeting, and the submission of bills to the client.
    civil engineering civil engineering basic knowledge what is civil engineering civil engineers

Komentáře • 23

  • @Mr_sachin1018
    @Mr_sachin1018 Před 3 lety +4

    Sir mja aa gya kya motivate krtey aap ❤️ bhut kuch sikhaya hai apne sir💕

    • @Civil_Guruji
      @Civil_Guruji  Před 3 lety +1

      Thank You.... Keep Learning.... Keep Growing....

  • @user-sb7rd2pd9w
    @user-sb7rd2pd9w Před 9 měsíci +1

    love from pakistan

    • @Civil_Guruji
      @Civil_Guruji  Před 9 měsíci

      Thank you very much for your Love and Support . I appreciate your expression of support and goodwill. Let us continue to learn and share knowledge together.

  • @shimakrocks3
    @shimakrocks3 Před rokem +1

  • @manojrouthan1116
    @manojrouthan1116 Před 3 lety +2

    Sir dpr wala course provide kr dooo

  • @ASIFALI-oz9gy
    @ASIFALI-oz9gy Před 2 lety

    Lovely

  • @jitendrapawar224
    @jitendrapawar224 Před 3 lety

    Thanks sirji

  • @nkffatafat611
    @nkffatafat611 Před 3 lety +1

    In plaster work reduction of door and windows is not done

  • @dcp582
    @dcp582 Před 3 lety

    👌 Thank you 🙏

  • @lalankumarjha7330
    @lalankumarjha7330 Před 2 lety

    How quantity. Is measured for. Main wall 300 mm and partition wall 150 mm in a building. For earth work. Etc

  • @ravimaurya8735
    @ravimaurya8735 Před 2 lety +1

    bhaiyo hosake toh IT mein chale jaoo abhi bhi time hain
    civil mein jana hai toh govt. mein jaoo

  • @JiteshKumar-vk9il
    @JiteshKumar-vk9il Před 2 lety

    Please sir level ke bare me batay

  • @shubhamworah8460
    @shubhamworah8460 Před 3 lety

    ❤️❤️❤️😘

  • @kamaljyotidas1612
    @kamaljyotidas1612 Před rokem

    There is a mistake in steel unit weight measurement. Mass= density x volume

  • @jitendrasinghraghuwanshi8429

    Colbert designing ka corese bhi he kya koi sir

  • @priyansupattanaik6232
    @priyansupattanaik6232 Před 3 lety

    Civil guruji app me video nehi play horah please sir o video kes play hog batw

  • @mousumibiswas3996
    @mousumibiswas3996 Před rokem

    Any one purchase cop construction course?

  • @UMARFARUK-ff7zy
    @UMARFARUK-ff7zy Před 2 lety

    Rate kaha milega sir??

  • @mamabhacha_vlog
    @mamabhacha_vlog Před 3 lety

    Sir app me discussion section kyu hai .??
    Doubt clear krne ke liye ??

    • @lucky-zx8dq
      @lucky-zx8dq Před 3 lety

      @@theengineer6590 number de yrr tere