PCS Gas Lift

Sdílet
Vložit
  • čas přidán 26. 08. 2024
  • Opti-Flow™ Gas Lift by PCS (Production Control Services): Learn more about gas lift, a form of artificial lift typically installed during well completion. Discover why it's an economical artificial lift solution for high-liquid, low-gas wells. PCS is a leading provider of well optimization products and services, including PCS Plunger Lift, Opti-Flow™ Gas Lift, Nitro2Go™ Nitrogen Generation and PCS Well Site SCADA. Visit www.pcslift.com to learn more.

Komentáře • 11

  • @phildurrett1381
    @phildurrett1381 Před rokem

    Thanks for the video

  • @gregoria2878
    @gregoria2878 Před 13 lety

    que buen video.. los felicito en venezuela el metodo mas utilizado es el metodo de levantamiento artificial por gas lift

  • @majokdhieu7929
    @majokdhieu7929 Před 3 lety

    very helpful source indeed, thanks

  • @dineshmeena6040
    @dineshmeena6040 Před 12 lety +1

    short but useful 2 understand gas lift..

  • @TheAlhakiki
    @TheAlhakiki Před 11 lety +1

    Thanks. I can more understand this one.

  • @Sergiosonick
    @Sergiosonick Před 10 lety

    Este metodo es el Bombeo Continuo o Intermitente ? This method is the Pumping Continuous or Intermittent? please help!!!

  • @sandeepan01
    @sandeepan01 Před 11 lety +1

    Thanks. Very useful..

  • @fabiencornelie8388
    @fabiencornelie8388 Před 8 lety

    Is it possible to have this video with subtitles?

  • @vissusamurai
    @vissusamurai Před 8 lety +1

    what does PTR mean in design report?

    • @leebrewer3
      @leebrewer3 Před 7 lety

      PT is tubing pressure @ depth based on the flowing tubing gradient that the well is designed on. PTRO is the Test Rack Opening pressure in the shop at 60 deg.

  • @arshedbelal2902
    @arshedbelal2902 Před 11 lety

    It is too short for learning