SOLO Off Grid CABIN Build | Finishing the Electrical in the Pantry
Vložit
- čas přidán 12. 09. 2024
- The electrical gets finished in the pantry and the service panel gets installed. Now I can start installing the Aspen wall paneling that was milled from Aspens off my property.