EVERSTEIN | SF12-3FCML6378BK Light Wave 12" High-Pressure Shower System Installation Guide Video

Sdílet
Vložit
  • čas přidán 16. 12. 2023
  • 1. EVERSTEIN shower system offers three functions, all of which can be used simultaneously or separately, ensuring a refreshing shower experience.
    2. Please ensure that the hot water pipe is positioned on the left side and the cold water pipe is positioned on the right side.
    3. During installation of the thermostatic valve, it's important to align the two scale lines in order to achieve the thermostat effect.
    ➡️www.everstein.com/products/m6...

Komentáře • 3