How to Calculate Quantity of Cement and Sand for Plastering Work in Building

Sdílet
Vložit
  • čas přidán 10. 09. 2024

Komentáře • 9

  • @yenye120
    @yenye120 Před rokem +1

    Am a fan from Cameroon 🇨🇲 please can u do videos on reinforcement calculation for pillars and beams of a structure and also quantities of concrete for pillars and beams
    Lastly please do a video on to calculate mortar needed for the construction of e building . Thank u sir.

  • @ojewumisamson1552
    @ojewumisamson1552 Před 5 měsíci

    Something is missing here. 1:4 means 1head pan of cement and 4headpans of sand. Meaning that, we have 2headpans of cement in one bag and from your calculations, 4 and half bags of cement should be used instead of 9bags

  • @simontembo7210
    @simontembo7210 Před rokem +1

    How many wheelbarrows of sand makes one ton?

  • @benardephraim6641
    @benardephraim6641 Před 8 měsíci

    Thanks alot

  • @chukaokolie6119
    @chukaokolie6119 Před rokem

    Is there any disadvantage of mixing sharp with mud sand for plastering to arrive at a mix ratio of 1:5 and conserve cement

  • @enametieffiong4893
    @enametieffiong4893 Před 2 lety +1

    Nice one Engr. Please what is the mix ratio for a grade 20 and 25 concrete?

    • @CADmade-easy
      @CADmade-easy  Před 2 lety

      Grade 20 Mix Proportions is 1:1.5:3
      Grade 25 Mix Proportions is 1:1:2

  • @official_calulu
    @official_calulu Před rokem

    how you get dry volume of plaster ?

  • @roastedchicken288
    @roastedchicken288 Před rokem

    I think u didn't count the window and door sides plastering too