Tiger SC-135 at work in GPE project

Sdílet
Vložit
  • čas přidán 11. 09. 2024
  • In the Grand Paris Express project, underground stations and shafts, are executed at a significant depth.
    For executing these works, in consideration of the excavation depth to be reached, the high thickness of the walls, the verticality tolerances and the geology of the soil to drill, the SC-135 Tiger hydromills were used to guarantee the highest quality standards.
    _______________________________________________
    Soilmec equipment is used everyday on jobsites all around the world for bridges, viaducts, motorways, tunnels, underground lines, railways and buildings of all types.
    We have grown enormously over these four decades. Thanks to a constantly upgraded and broadening range of products and a greatly increased production capability, we are an established landmark in the international ground engineering field.
    The company was established in 1969. Since its inception, Soilmec has always developed safe, innovative, cutting-edge technologies and provided the construction industry the full spectrum of equipment solutions.
    Leading ground engineering for more than 50 years.
    Follow us on
    Facebook: / soilmecspa
    Website: www.soilmec.com
    Twitter: / soilmecspa
    Join the YT Soilmec channel: / soilmec

Komentáře •