Hydro Construction Timelapse
Vložit
- čas přidán 15. 12. 2022
- WHEN HYDRO OPENS IN JANUARY 2023, YOU’LL FIND:
- PreK-12 educational programs and exhibits
- Lab space for food and water professionals and entrepreneurs, “on-show” to the public
- Meeting space, indoor and outdoor event space, and a flexible theater with a capacity of up to 230 - all for Spur and for public and community use
- Physical connectivity to the restored South Platte River, and a backyard space demonstrating the concepts of headwaters and watersheds, specifically illustrating the South Platte River, Arkansas River, Rio Grande, and Colorado River basins
- Grey water catchment in the backyard space that will be used to flush toilets within Hydro
- A cafe featuring items with produce grown on-site
- Artist studios in the renovated McConnell building and leasable office spaces for water-focused NGOs and educational outlets
- The permanent home for the CSU Masters of Agribusiness and Food Innovation Management; the CSU Spur annual Water in the West Symposium; and the research location for CSU Spur BioBlitzes
- Art installations, including works by Jason Bruges, Eric Tillinghast, Nikki Pike, and Anthony Garcia, Sr. of Globeville’s Birdseed Collective