7.6 Evaluation of measurement uncertainty

Sdílet
Vložit
  • čas přidán 9. 09. 2024
  • In ISO/IEC 17025:2017, the evaluation of measurement uncertainty can be approached through two main methods: bottom-up and top-down.
    Bottom-Up Approach involves identifying and quantifying individual sources of uncertainty and then combining these uncertainties to determine the overall measurement uncertainty.
    Top-Down Approach involves determining the measurement uncertainty directly from the overall comparison of the measurement result with an appropriate reference value or a certified reference material (CRM).
    ⛔️ Learn more about Evaluation of measurement uncertainty via our free course at:
    🔽 CZcams 🔽
    • Estimation of measurem...
    🔽 UDEMY 🔽
    www.udemy.com/...

Komentáře • 4

  • @mohamedashraf-qg7xe
    @mohamedashraf-qg7xe Před 8 měsíci +1

    ربنا يجازيك كل خير يارب يا دكتور اللهم امين ❤️❤️❤️❤️❤️

    • @DrMohamedSaid
      @DrMohamedSaid  Před 8 měsíci

      اللهم آمين وإياكم أخي الكريم 🌷🌻💕

  • @MECMetrologyCalibration-le3od

    حقاً، علم ينتفع به، دعائي لك بالتوفيق والصحة وراحة البال، لك مني كل الاحترام والتقدير.

    • @DrMohamedSaid
      @DrMohamedSaid  Před 8 měsíci

      اللهم آمين وإياكم 🤲
      و جعلنا الله وإياكم ممن تعلم العلم و علمه 🌻🌷