How to Form and Pour Concrete Footings with the Foothold ICF Footing System

Sdílet
Vložit
  • čas přidán 19. 06. 2024
  • The Foothold ICF Footing System is a stay in place footing form with nothing to strip, no wood planks, no spreader boards. It can be used as a footing only form or in combination with an ICF stem wall mono pour.
    0:00 - Intro
    2:06 - What is The Foothold?
    3:02 - Build Foothold Sections
    4:48 - Build Foothold Corners
    6:55 - Prepare the Trench
    7:25 - Lay out the Footer
    8:27 - Add Walls
    8:57 - True and stabilize walls
    9:44 - Pour Concrete
    Find out more about the Foothold ICF Footing System here 👉
    thefootholdicf.com/
    www.homedepot.com/p/1-lb-Foot...
    #concrete #construction #howto
    Thanks for watching the video How to Form and Pour Concrete Footings with the Foothold ICF Footing System
  • Jak na to + styl

Komentáře • 89

  • @volt8399
    @volt8399 Před 3 lety +4

    Thanks for making this. It's a great way of using less wood.

  • @srchubz
    @srchubz Před 7 měsíci +3

    Used the Foothold ICF footing system for a footing/4' ICF stem wall monopour. Used metal stakes to hold the Foothold down/prevent lift. Maybe non-conventional, but built it all in one go, rebar and all. Then at the top of the ICF stem wall I used 2x6 forms vertically at the edges and horizontal on top of those and laser leveled it all at the top. Didn't have to worry about a perfectly level footing then, didn't have to worry about sag or lift or anything. And at the end? Was able to screed using normal sized tools and then removed the 2x6 forms. Top of the ICF is covered by the concrete and everything is super level. Couldn't be happier with the Foothold system, as I did this all solo.

  • @richardwallinger1683
    @richardwallinger1683 Před 3 lety +3

    excellent video . i was amazed at how the foam held against the weight of the concrete .

  • @Josh-ux6zz
    @Josh-ux6zz Před rokem +11

    Okay I just used these on a build. Some cons, the forms take longer to cut and make than up you’d think. It was a real pain and time consuming. I wouldn’t pour them in conjunction with your icf wall, I only had two small blowouts and they were both at the small top foam strip that is only a couple inches thick, if you’re pump operator is putting out any decent pressure these are a weak point. Luckily you can just move on and come back to that area as it isn’t a show stopper, but still a concern when pouring. The webbing is very strong and well made, but only comes in cases of 24 I think. I only needed two from the last box. Other than that it was a decent system

    • @IkeCoblentz
      @IkeCoblentz Před rokem +1

      Did you backfill with dirt before you poured?

    • @Josh-ux6zz
      @Josh-ux6zz Před rokem +2

      @@IkeCoblentz I partially backfilled with gravel per the instructions. But you can’t fully backfill on top of the forms before you pour ,which is where the small blowouts happened

  • @user-nn6nf9yk1b
    @user-nn6nf9yk1b Před 7 měsíci +1

    I used this system to build my insulated garage with a thermal break between the slab and dwarf wall. An inexperienced crew to create , install and pour the footing and wall all at once. The only error that we encountered , we were vibrating the lift pours to intensely and experienced a little lifting of the formwork. It went so well . Going to use this system again. Challenge now is to create a curved footing and ICF wall for my grain bin house design.

  • @danbiss87
    @danbiss87 Před rokem +9

    Getting that footer perfectly level must be a pain in the ass

    • @srchubz
      @srchubz Před 7 měsíci +2

      I leveled at the top (see comment). Way easier for me this way

  • @SW-li7gd
    @SW-li7gd Před rokem +1

    best video. thank you.

  • @joequixotic3039
    @joequixotic3039 Před 2 lety +8

    I really like this concept. You get an insulated footer with no forms to remove afterward. Almost all of the work can be done at table height so you're not on your hands and knees for the "hard" part.
    I'm not a huge fan of foam board insulation with direct ground contact or rising damp from ground water soaking a footer but those problems should be solvable, mostly with off the shelf products but some with a bit of sweat equity.
    Beside the foam, it doesn't seem terribly expensive to me but if you need an insulated footer it's hard to see a way around that expense.
    I think this concept with some of my creativity added will do everything I need to make a 3-400 year footer under my 3-400 year ICCF walls. Building with that kind of timeframe excuses just about any material choice because the alternatives will be remodeled or torn down and replaced several times during the lifespan of my home. If I add solar and enough insulation to net-zero my energy usage I'll be doing more than 99% of the fake environmentalists out there but only because I like AC, I don't like electric bills and I want something to leave to my family...

  • @clydecox2108
    @clydecox2108 Před 2 lety

    Pretty slick...

  • @Lawiah0
    @Lawiah0 Před 2 lety

    Thank You

  • @dlg5485
    @dlg5485 Před 2 lety +6

    This is a great system that should give you a much more water resistant foundation. Also, it's a simple enough procedure for the average DIYer to tackle, which can save you thousands on labor. I will definitely keep this system in mind for when I build my home in a few years.

    • @dammitbobby283
      @dammitbobby283 Před 2 měsíci +1

      This won't stop water on the footer. The foam board isn't sealed and water can penetrate from below. The form has NOTHING to do with water.

  • @chrismorrow4269
    @chrismorrow4269 Před 3 lety

    Simple

  • @pintopilot
    @pintopilot Před rokem +1

    Any plans to accommodate a 6" ICF form? Why did the tie material switch from black to white?

  • @jordanmcgovern9017
    @jordanmcgovern9017 Před 3 lety +17

    You should come out with a commercial dimension for 24 inch wide by 12 deep footing. Product looks interesting and useful

  • @butopiatoo
    @butopiatoo Před rokem

    What do you do when you are using a 6" concrete wall block. There's a 1" gap on either side. Foam it? Does it matter?

  • @rinkevichjm
    @rinkevichjm Před 2 lety

    Would not SCC be better than 6” slump?

  • @chrismorrow4269
    @chrismorrow4269 Před 3 lety

    Working smarter

  • @rinkevichjm
    @rinkevichjm Před rokem

    Why not a 26” slump SCC?

  • @jameslyons1661
    @jameslyons1661 Před rokem

  • @michiganengineer8621
    @michiganengineer8621 Před 2 lety +3

    Great, now to decide between this foundation system and Form-A-Drain 😂
    Have you considered making the spreader forms to fit thicker ICF blocks? Admittedly you could trim off one or both of the holders for the "capping" foam blocks and come close to fitting 10 or 12" ICF.

    • @DanLiese
      @DanLiese Před rokem +2

      not sure this system is as good as form a drain

  • @johnwasik1186
    @johnwasik1186 Před 2 lety

    The video is showing the mono-pour use I got 10 inch ICF. What do you use when you have 8 inch ICF blocks. Then the square for the 2 1/2 inch foam is too small to meet the Icf block?

    • @thefoothold151
      @thefoothold151  Před 2 lety

      The Foothold is designed to fit an 8" ICF (13" to 13 1/4" overall width)

    • @johnwasik1186
      @johnwasik1186 Před 2 lety

      @@thefoothold151 I wished that they were adjustable. I have them now for a job and I have a 2” gap between them and my ICF.

  • @stephentaylor9366
    @stephentaylor9366 Před 3 lety +6

    Wait! Why not use the ICF block itself as the footer form? You can set the wet block into the footer as it is poured. The minimum width footer I’ve ever poured was 16” wide. So using a 6” ICF block with an outside measurement of 9-3/4” leaves you 3-5/8” of foundation/footing exposed to set your exterior or interior materials on. I have not built in an area that demanded insulation beneath the footer (residential construction), but if I should, I’’d simply line the footing trench with insulation. The labor costs, and material costs alone would be saved doing it my way. Incidentally, I first built this way in 1994, and have NEVER had one single foundation problem doing it my way.

    • @1982nsu
      @1982nsu Před 3 lety +1

      I many areas a dugout footing is not allowed and must be "formed."

    • @stephentaylor9366
      @stephentaylor9366 Před 3 lety +6

      @@1982nsu You’re right about that. But, do not forget that the icf block is a “form.” I’ve used styrofoam sheeting in 10’ lengths as a form material, thus providing the necessary frost protection required with some footers. And as a moisture barrier, TYVEK is an excellent moisture barrier material to use at the bottom of the footing. Horizontal re-bar holds the 2 sides of the form in place (just insert the rebar into the form on each side. Then pour your footer. After the pour is set in place, and while it’s still wet, you can insert the ICF wall forms down into the wet footer, and with vertical rebars as required pour I/2 the first tier of ICF blocks. Further, to insure a consistent concrete pour, simply insert 4” PVC pipe down into the footer with a vertical rebar inside it, before your initial pour (Do NOT pour inside the pipe, and make sure the pipe does not extend through the footing concrete). Then after the concrete sets, you pull the PVC sections out. When you make your next wall pour, this “keyway” will provide a bonding between the 2 pours. Keyway pours are common place in the concrete world, assuring a consistent bond between pours. Good luck!

    • @mojoknows66
      @mojoknows66 Před 2 měsíci

      @@stephentaylor9366You should make a video of your process.

  • @rockys7726
    @rockys7726 Před 2 lety +1

    Seems like a lot more work to cut and trim foam board versus the bag footer. The only advantage is it's insulated.

  • @lesliesweeney368
    @lesliesweeney368 Před 2 lety

    What due you cut the lentgh in the footer in 8' x 5' in the corner

    • @thefoothold151
      @thefoothold151  Před 2 lety

      There is a good install guide you can download from the website: thefootholdicf.com

  • @truthtalker4711
    @truthtalker4711 Před 10 měsíci

    What size ICF fits in the foothold as far as the concrete core?

    • @thefoothold151
      @thefoothold151  Před 10 měsíci

      The space is 13" to 13 1/4" for a typical 8" core ICF

  • @victork534
    @victork534 Před 2 lety

    hi, my project require footings 20"x6" by engineer plans, and then i planning to put foundation using 6" core icf 4' high and home on top, can i still use your system for footings? do you have brackets for 6" high? ty, victor

    • @thefoothold151
      @thefoothold151  Před 2 lety +1

      this will give you an 8" thick footing when doing a mono pour
      they are made for 8" ICFs so if you are using 6" you need to attach a 2" strip of foam to the bottom side of the first course of ICF

    • @victork534
      @victork534 Před 2 lety

      @@thefoothold151 hi, thank you for reply, is this product avail in Canada? Ty, victor

    • @butopiatoo
      @butopiatoo Před rokem

      @@thefoothold151 HOW DO YOU DO THAT? A 2" strip??? C'mon man!!!

    • @badawesome
      @badawesome Před 14 dny +1

      @@butopiatoo use a table saw man

    • @butopiatoo
      @butopiatoo Před 13 dny

      @@badawesome thx

  • @tarvindurbin5974
    @tarvindurbin5974 Před 3 lety +5

    But How much does this easier method cost, compared to the traditional way of doing footers ??

    • @1982nsu
      @1982nsu Před 3 lety +4

      A year ago I would have said 2X10's would be cheaper. With today's lumber prices I think this system would be far less expensive. Besides, I will seek alternatives to lumber just on the grounds of the unjustified sky high lumber prices today.

    • @michiganengineer8621
      @michiganengineer8621 Před 2 lety

      $93 per 25 count pack of ties, plus the cost of whatever foamboard you decide to use. The cost of the foamboard would be at least partially offset by the fact you wouldn't need the labor expense of removing the forms afterward.

  • @joshuawiedenbeck6944
    @joshuawiedenbeck6944 Před 3 lety +3

    Is there a reason to do it this way instead of digging the footing into the dirt/aggregate and letting the material be the form? That method is free.

    • @williamlopez5462
      @williamlopez5462 Před 3 lety +7

      Poor concrete on the open dirt is not efficient, the water from the concrete will be sucked by the dirt and would not cure properly.
      FastFoot or any other material to hold the concrete and don't allow water from it to sip to the ground is much better, which this system does not address it. I think a footing framed with stakes and 2 x 6 with Fastfoot and probably less expensive, the wood can be recycled for other uses on the project. $75.00 cost just for 25 pieces of the composite ties, to that you have to add the foam and the labor. I am not an expert but the fastfoot method is less expensive and less labor-intensive.

    • @Benzknees
      @Benzknees Před 3 lety +4

      No reason unless in an unstable ground like sand, as you can alter the concrete water content to suit, and saves a pile of excavation & stone.
      Casting pieces of plastic into the concrete as shown will weaken it, and placing rebar on the ground instead of using 50mm spacer blocks invites corrosion.
      And if you use those wall forms, there’s no way to properly compact the concrete to remove air pockets. Plus it seems there’s no vertical rebar in the walls which will presumably have to resist tensile forces in which mode concrete is v.weak.

    • @1982nsu
      @1982nsu Před 3 lety +8

      @@Benzknees The HDP plastic has no adverse effect on the concrete. The rebar does not lay on the ground. Go to 7:55 in the video. The rebar is lifted off the ground and secured in the "Foot Hold" webbing. The vertical rebar install was not shown in the video but the installation manual describes the vertical rebar. thefootholdicf.com/wp-content/uploads/2016/10/ICF-DETAILS-2016-03-26-p1.pdf Concrete is vibrated (also not shown) with a bladeless reciprocating saw, concrete vibrator, tapping the form with light mallet or any number of other methods.

    • @danbiss87
      @danbiss87 Před rokem

      Depends where you live. If you have to go down 4-5' for frost (like shown here) you can't.

    • @joshuawiedenbeck6944
      @joshuawiedenbeck6944 Před rokem

      @@danbiss87 But if you need to be 4-5' down for frost you would excavate whatever depth you need minus the height of the footer. Then dig the footer into the dirt. Companies around here (Wisconsin) do it all of the time. Doesn't work for every situation but it works for a lot of them.

  • @NSResponder
    @NSResponder Před 2 lety +4

    Looks a lot more work than using Fastfoot.

    • @badawesome
      @badawesome Před 14 dny

      IF you don't need your footer insulated then use Fastfoot plastic liner for footings

  • @lanmech7397
    @lanmech7397 Před 3 lety +4

    I was done at ryobi cordless tools

  • @kevinkevin9448
    @kevinkevin9448 Před 3 lety

    Where can I buy I'm nj ???

    • @thefoothold151
      @thefoothold151  Před 3 lety +1

      Here is the link www.homedepot.com/p/1-lb-Footing-Tie-Plastic-25-Pack-MOD001/305998925

    • @tarvindurbin5974
      @tarvindurbin5974 Před 3 lety

      @@thefoothold151 Thanks for the link ..Much Appreciated

    • @1982nsu
      @1982nsu Před 3 lety

      You can get it at Home Depot for the same price ($75.00) a bag of 25 pieces.

    • @1982nsu
      @1982nsu Před 3 lety

      This is another multi-purpose option. Available at most concrete supply. czcams.com/video/AAbXyGtozyE/video.html

  • @sergeyc5528
    @sergeyc5528 Před 2 lety

    Whats the width of the footer?

  • @justoneman1318
    @justoneman1318 Před 2 měsíci

    I don't know why they're not available in California.

  • @elliottdiedrich2123
    @elliottdiedrich2123 Před 3 lety +8

    You forgot to vibrate it! Without vibration, it will surely be filled with honeycomb holes but you cant see it behind the insulation so you get away with a scabby job that appears ok. All pours in insulated concrete forms need vibration to ensure consistent solid concrete.

    • @rinkevichjm
      @rinkevichjm Před 2 lety

      Try using SCC instead no vibration is required.

    • @tomoleary2880
      @tomoleary2880 Před 2 měsíci

      Not true if you add plasticizer to the mix so that it flows properly.

    • @sorenjensen3863
      @sorenjensen3863 Před 5 dny

      You can get an "ICF mix" from your concrete supplier. No vibration needed

  • @dammitbobby283
    @dammitbobby283 Před 2 měsíci +1

    It's a great concept but foam board is now as expensive as wood. This is still a LOT less work and DIY which save 50% of the cost. The hardest part is getting the foundation square.

  • @dammitbobby283
    @dammitbobby283 Před 2 měsíci +1

    Home Depot is always out of stock for this item.

  • @breakfastclub3909
    @breakfastclub3909 Před rokem

    I like the zero safety eye wear approach.

  • @roberthubbard7827
    @roberthubbard7827 Před 3 lety +5

    The only advantage I've seen from this system having used it to build town homes and condominiums extensively in Snowshoe WV is it's insulation value. It's time consuming and extremely expensive, plus you lose the ability to reuse material for the next building forms.

    • @sebastiantevel898
      @sebastiantevel898 Před 2 lety

      This system is suitable for shallow frost-protected footings where you need to have the insulation wrapping the concrete and keep it in place forever. It also allows for avoiding digging 5 feet to reach below the frost line. This way you only need to dig 18 inches deep. If you are on bedrock it will save you thousands of dollars.
      If you pour footings with reusable planks you still need to install insulation to the concrete footing which is almost as time-consuming as making the forms. Basically what you suggest is almost double the work.

    • @dlg5485
      @dlg5485 Před 2 lety +1

      Why would you want to reuse the foam insulation. The whole point is that it insulates the footing and creates the form in one step, which saves time and money. It would make absolutely no sense to remove the insulation.

  • @thefoothold151
    @thefoothold151  Před 3 lety

    Here is the link to buy: www.homedepot.com/p/1-lb-Footing-Tie-Plastic-25-Pack-MOD001/305998925

  • @jonotermaat7247
    @jonotermaat7247 Před 3 lety

    Plastic and polystyrene. Hmmmm

  • @MarquisVonLion
    @MarquisVonLion Před 2 lety +1

    Styrofoam is a number 6 plastic, making it a challenge to recycle.
    Polystyrene takes 500 years to decompose.
    Restrictions around recycling Styrofoam mean it often ends up in a landfill.
    This trash can pollute water supplies for humans and marine life.
    Choosing an Eco-friendly alternative is a good option.

    • @CringePanda
      @CringePanda Před 2 lety

      It actually takes almost 10,000 years to decompose with the current formulas.

    • @bobjoatmon1993
      @bobjoatmon1993 Před rokem +5

      Duh, people using ICF are trying to build homes to last CENTURIES / generations (just like in Europe) and the foam isn't recycled, it's a permanent part. It's a feature, not a bug

  • @lptf5441
    @lptf5441 Před 3 lety +3

    What a shambles of a system! Taping corners. Timber bracing all over the place. Screwing foam together. What a nightmare!

    • @robertabbott8541
      @robertabbott8541 Před 7 měsíci +2

      This guy has never used concrete forms. Bracing, grade line, stakes,etc. are more difficult to work around. This guy needs to use the old system for 20 years. Then comment!

  • @tundrawhisperer4821
    @tundrawhisperer4821 Před 3 lety

    This is all bull shit! Nobody is building with this shit. Too expensive!