The MDS M515 Heavy Duty Trommel Processing Overburden near Perth, Australia

Sdílet
Vložit
  • čas přidán 6. 09. 2024
  • The MDS M515 Rock Trommel is busy sorting materials, 100-300mm on the mid conveyor, 300-800mm as oversize, and minus 100mm into a screener for further screening into three smaller sizes. Together they are churning out a total of 5 products!
    The MDS heavy duty trommel is doing a great job ensuring that none of the larger rocks go into the screener machine to prevent any potential damage while breaking up the fines, making the screening of overburden material a smooth process.

Komentáře • 1