Very helpful video. Superb teaching.
Thanks a lot for this helpful presentation.🙏👍
Vipin, your presentation is so coherent and logical in covering every single details. You are awesome!
2nd questing of Nelson - Vipin, for scrapping can we create quality order of produced item and then can do scrapping of 1 qty.
Neat presentation
Hi, in AX 2012 we report as finished by using View -> Journals - Report as finished - Create new button. This button creates a new journal and goes to lines automatically. I don't see this button in D365. Is there a way to enable it?
Asslam alaikum is it possible to change the string size of edt?? I have inventdim table in which I want to increase size of inventcolorId ?
Dear Sir In discrete manufacturing about Sunglasses you did not select route in Production order ?
At End stage facing issue
negative cost amount for receipts is not allowed in production order. please suggest me ASAP sir
how can i see the pourcentage of jobs at the interface ?
Hi Vipin, when we create the production order and estimate the same, we can verify the cost group in the overview costing tab. For me, the cost group is populated as M9. Would like to know where is this set up auto populating from? could you clarify this?
Hi, this cost group is populating from Production control > set up > cost groups, here the direct materials cost group is there and M9 would have been set to default. Also if you add various operations than those cost groups will reflect too , because you will tag the cost groups in the Production control > set up > cost categories and these cost categories will be attached to individual operations.
Hi Vipin,
How to define the scrap percentage for a component in case of discrete Manufacturing on bom lines.
Hello vipin, I created Production order, when I click on Start, I am getting error for item like inventory dimension warehouse is a primary input/output dimension and must consequently specified. Inventory dimension location must be specified
Status must be specified.
Hi there
Nice video. Whats about Production Order with charges and serial number?
Charges on production can be like labor charges, overhead charges etc can be added by configuring "Costing sheet" and yes if serial numbers are produced then addition step of "registration" is there. Click on registration, add serial numbers and you are good to go.
In your stages, you left out SCHEDULED (Created, Estimated, Scheduled, Released, Started, Reported As Finished, and Ended)
Everything is a clearer now, thank you 🙏