ENERCON’s new top model - E-160 EP5 installed / ENERCONs neues Topmodell - E-160 EP5 installiert

Sdílet
Vložit
  • čas přidán 17. 11. 2020
  • The nominal power of the E-160 EP5 E2 is 5.5 MW, and at sites with annual average wind speeds of 7.5 m/s at hub height it will produce more than 21,534 megawatt-hours (MWh) of annual energy yield.
  • Věda a technologie

Komentáře •