Cable Ampacity & Sizing

Sdílet
Vložit
  • čas přidán 5. 07. 2024
  • etap.com - Proper sizing and current derating ensures that cables operate to their maximum potential while providing secure and reliable operation. Learn about design and application requirements to properly size and analyze cable systems based on IEEE and North American cable standards and guidelines: IEEE 399, ICEA P-54-440, NEC NFPA 70
    #ETAPsoftware
    #electricalsoftware
    #PowerSystemAnalysis
    #PowerSystemAnalysisSoftware
    #ElectricalEngineering
    #ElectricalDesign
    #CableSizing
    #cablelaying
    #cablepulling
    #cablerouting
    #CableCalculations
    #undergroundcable
    #electricalcalculations
    #nfpa70e
    #IEEE399
  • Věda a technologie

Komentáře • 16

  • @taimur649
    @taimur649 Před 4 lety +4

    Wow. I just loved the video. After watching this, I am looking forward to view your rest of upload videos as well.

    • @ETAPsoftware
      @ETAPsoftware  Před 3 lety

      Thank you for your interest in ETAP Software and your positive feedback

  • @haraleft
    @haraleft Před 4 lety +2

    Need more subscribers for this channel. Thanks ETAP Software.

  • @saifullahgulmuhammad4851
    @saifullahgulmuhammad4851 Před 3 lety +3

    Thank you Dear looking forward for further videos on Grid Tied system .

    • @ETAPsoftware
      @ETAPsoftware  Před 3 lety +1

      Thank you for your interest in ETAP Software. Please contact our technical support at support@etap.com to assist with your request

  • @abdulazizhawsah9884
    @abdulazizhawsah9884 Před 3 lety +2

    etap is the best software.

    • @ETAPsoftware
      @ETAPsoftware  Před 3 lety +1

      Thank you for your interest in ETAP Software and your positive feedback

  • @taimur649
    @taimur649 Před 4 lety

    @ Video Uploader
    My question is regarding the "Grouping" under Ampacity Tab of the Cable Editor.
    E.G if I am laying for outgoing of LV Switchgear the cables 4 x 1/C x 300mm2 / Ph + 2 x 1/C x 300mm2 for Neutral i.e. 300mm2 x Qty. 14 (in total) flowing altogether directly buried underground in flat horizontal touching arrangement. In this case shall my grouping be selected as "4 - based on the understanding that 4 cables per phase are existing"?

    • @ETAPsoftware
      @ETAPsoftware  Před 4 lety

      Thank you for watching our video and your interest in ETAP. Please contact our 24/7 Help Desk at support.etap.com and request assistance, or you can contact one of our local offices in your region etap.com/offices

  • @aminebe2354
    @aminebe2354 Před 5 lety +2

    thank you very much for these three videos , the big probleme in ETAP to size cable is the library how we can add new cable to the library

    • @ETAPsoftware
      @ETAPsoftware  Před 5 lety +2

      Hi Amine, thanks you for your interest in ETAP.
      As an ETAP user with valid maintenance contract, you can contact our support team via our HelpDesk 24/7 at no additional fee and ask them to build or help you to build a custom cable library for you. You can also build your own custom cables in ETAP as long as you have all the cable specs.

  • @TheDipankarrai
    @TheDipankarrai Před 4 lety +1

    How to get an Etap for learning purposes?

    • @ETAPsoftware
      @ETAPsoftware  Před 4 lety +1

      Thank you for your interest in ETAP. We offer a 30-day free demo than can be downloaded from our website at etap.com/demo-download

  • @Whitetooth1030
    @Whitetooth1030 Před 2 měsíci

    Great video bro. but PLEASE stop smacking yo lips every-time you start a new sentence bro. Made the video almost impossible to finish.